Search NB/T

500 NB/T standards in English, from NB/T 20039.11-2023 to NB/T 20411-2017, in code order.

  1. NB/T 20039.11-2023Nuclear air and gas handling practices - Ventilation, air conditioning and air purification - Part 11: Iodine adsorbers (Type I)$499.00
  2. NB/T 20039.12-2011Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 12: Iodine adsorber (Type II)$225.00
  3. NB/T 20039.12-2023Nuclear air and gas handling practices - Ventilation, air conditioning and air cleaning - Part 12: Iodine adsorbers (Type II)$539.00
  4. NB/T 20039.13-2012Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 13: Iodine adsorber (Type III)$345.00
  5. NB/T 20039.15-2012Code on Nuclear Air and Gas Treatment - Ventilation, Air Conditioning and Air Cleaning - Part 15: Adsorbent Media$165.00
  6. NB/T 20039.15-2023Nuclear Air and Gas Handling Code Ventilation, Air Conditioning and Air Purification - Part 15: Adsorption Media$464.00
  7. NB/T 20039.16-2015Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 16: Racks for air cleaning components$225.00
  8. NB/T 20039.18-2014Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 18: Refrigeration equipment$530.00
  9. NB/T 20039.19-2013Code on Nuclear Air and Gas Treatment - Ventilation, Air Conditioning and Air Cleaning - Part 19: Specific Types of High Efficiency Air Filters$535.00
  10. NB/T 20039.2-2014Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 2: Dampers$515.00
  11. NB/T 20039.3-2012Code on Nuclear Air and Gas Treatment - Ventilation, Air Conditioning and Air Cleaning - Part 3: Ductwork$315.00
  12. NB/T 20039.4-2013Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 4: Housings$540.00
  13. NB/T 20039.5-2014Code on nuclear air and gas treatment - Ventilation, air conditioning and air cleaning - Part 5: Conditioning equipment$670.00
  14. NB/T 20039.6-2013Code on Nuclear Air and Gas Treatment - Ventilation, Air Conditioning and Air Cleaning - Part 6: Demister$195.00
  15. NB/T 20039.7-2013Code on Nuclear Air and Gas Treatment - Ventilation, Air Conditioning and Air Cleaning - Part 7: Low Efficiency Air Filters$70.00
  16. NB/T 20039.8-2012Code on Nuclear Air and Gas Treatment - Ventilation, Air Conditioning and Air Cleaning - Part 8: Medium Efficiency Air Filters$195.00
  17. NB/T 20040-2011Seismic Qualification Test Rules of Safety Classified Electrical Equipment for Nuclear Power Plants$345.00
  18. NB/T 20040-2021Seismic qualification test rules of safety classified electrical equipment for nuclear power plants$485.00
  19. NB/T 20041-2011Functional requirements for documents, records and archives management system of nuclear power$435.00
  20. NB/T 20042-2011Classification Criteria and Coding Rules for Nuclear Power Archives$255.00
  21. NB/T 20043-2011General Regulation for Nuclear Power Project (NPP) Construction Schedule Management$315.00
  22. NB/T 20044-2011Technical Regulation for Construction and Acceptance of Reactor Internals Installation in PWR Nuclear Power Plant$225.00
  23. NB/T 20044-2021Technical regulation for construction and acceptance of reactor internals installation in PWR nuclear power plant$360.00
  24. NB/T 20045-2011Technical Regulation for Construction and Acceptance of Reactor Vessel Installation in PWR Nuclear Power Plant$195.00
  25. NB/T 20046-2011Technical regulation for construction and acceptance of steam generator installation in PWR nuclear power plant$165.00
  26. NB/T 20047-2011Installation and Acceptance Code for Primary Piping and Related Supports of PWR Nuclear Power Plant$195.00
  27. NB/T 20048-2011The economic evaluation guidelines of the nuclear power plant construction project$345.00
  28. NB/T 20049-2011Cable-penetration Fire Stop Qualification Test$285.00
  29. NB/T 20050-2011Recommended Practice for the Protection of Electric Equipment in Nuclear Power Plants from Water Hazards$135.00
  30. NB/T 20051-2011Design Criteria for Auxiliary Power System of Nuclear Power Plant$495.00
  31. NB/T 20052-2011The Design and Installation of Cable Systems for Class 1E Circuits in Nuclear Power Plants$165.00
  32. NB/T 20053-2011Installation requirements of electrical, instrumentation and control equipment important to safety of nuclear power plant$165.00
  33. NB/T 20054-2011Nuclear power plants - Instrumentation and control system important to safety - Software aspects for computer-based system performing category A functions$1,070.00
  34. NB/T 20055-2011Nuclear Power Plants - Instrumentation and Control System Important to Safety - Software Aspects for Computer-based Systems Performing Category B or C Functions$470.00
  35. NB/T 20056-2011Calculation of Decay Heat Power in the Nuclear Fuel of Light Water Reactors$500.00
  36. NB/T 20056-2021Calculation of Decay Heat Power of Light Water Reactor Nuclear Fuel$240.00
  37. NB/T 20057.1-2012Pressurized Water Reactor Nuclear Power Plants Reactor System Design - Core - Part 1: Nuclear Design$165.00
  38. NB/T 20057.2-2012Pressurized Water Reactor Nuclear Power Plants Reactor System Design - Core - Part 2: Thermal Hydraulic Design Criteria$165.00
  39. NB/T 20057.3-2012PWR Nuclear Power Plants Reactor System Design - Core - Part 3: Fuel Assembly$165.00
  40. NB/T 20057.3-2023Pressurized Water Reactor Nuclear Power Plant Reactor System Design Reactor Core - Part 3: Fuel Assemblies$304.00
  41. NB/T 20057.4-2012PWR Nuclear Power Plants Reactor System Design - Core - Part 4: Core Components$165.00
  42. NB/T 20058-2012The Application of Visual Display Units in Control Rooms of Nuclear Power Plants$435.00
  43. NB/T 20059-2012The Operator Controls in Control Rooms of Nuclear Power Plants$225.00
  44. NB/T 20060-2012The Separation Criterion for Instrumentation and Control Systems Important to Safety in Nuclear Power Plants$125.00
  45. NB/T 20061-2012Practice for Application of Human Factors Engineering to Systems, Equipment and Facilities of Nuclear Power Plant$375.00
  46. NB/T 20062-2012Batteries for Uninterruptible Power Supply Systems for Nuclear Power Plants$590.00
  47. NB/T 20063-2012Glossary of Instrumentation and Control for Nuclear Power Plants$680.00
  48. NB/T 20064-2012Installation and test requirements of in-core instrumentation system in pressurized water reactor nuclear power plant$135.00
  49. NB/T 20065-2012Installation and Arrangement Requirement for Transducer and Transmitter Important to Safety in Nuclear Power Plant$195.00
  50. NB/T 20066-2012The Design Criteria for Nuclear Power Plants Station Blackout$345.00
  51. NB/T 20067-2012Identification for Safety Class Equipment in Nuclear Power Plants$165.00
  52. NB/T 20068-2012Requirements for Coping with Common Cause Failure (CCF) of Instrumentation and Control Systems Important to Safety in Nuclear Power Plants$255.00
  53. NB/T 20068-2021Requirements for dealing with common cause failures of instrumentation and control systems important to safety in nuclear power plants$699.00
  54. NB/T 20069-2012Performance Monitoring Test of Instrumentation Channels Important to Safety in Nuclear Power Plants$345.00
  55. NB/T 20070-2012Criteria for Design, Installation, and Qualification of Raceway Systems for Class 1E Circuits in Nuclear Power Plants$405.00
  56. NB/T 20071-2012Requirements for Electrical Supplies of Instrumentation and Control Systems Important to Safety in Nuclear Power Plants$125.00
  57. NB/T 20072-2012Determination and Maintenance of Trip Setpoints for Instrumentation of Safety Systems in Nuclear Power Plants$255.00
  58. NB/T 20073-2012Criterion for Instrumentation and Control Equipment Grounding in Nuclear Power Plants$185.00
  59. NB/T 20074-2012Qualification of Class 1E Motor Control Centers for Nuclear Power Plants$435.00
  60. NB/T 20075-2012Protection Provided by Electrical Equipment Against External Impact for Nuclear Power Plants$105.00
  61. NB/T 20076-2012Earthquake Instrumentation Criteria for Nuclear Power Plants$195.00
  62. NB/T 20077-2012Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plants Seismic Instrumentation$165.00
  63. NB/T 20078-2012Qualification Procedure for Safety-related Pneumatic Control Valve of Pressurized Water Reactor Nuclear Power Plants$255.00
  64. NB/T 20079-2012Qualification Procedure for Safety-class Electric Actuators Applied in Nuclear Power Plants$345.00
  65. NB/T 20080-2012Qualification of Class 1E Lead Storage Batteries for Nuclear Power Plants$195.00
  66. NB/T 20080-2019Identification of safety-grade exhaust-type lead-acid batteries for nuclear power plants$229.00
  67. NB/T 20081-2012Qualification Procedure for Class 1E Transformer Applied in Pressurized Water Reactor Nuclear Power Plants$195.00
  68. NB/T 20082-2012Qualification Procedure for Safety-class Diesel-generator Applied as Standby Power Supplies for Nuclear Power Plants$255.00
  69. NB/T 20083-2012Criteria for Lubricating Oil Systems Design for Emergency Diesel Generator of Nuclear Power Plants$195.00
  70. NB/T 20084-2012Qualification procedure for safety class residual heat removal pump motors applied in nuclear power plants$225.00
  71. NB/T 20085-2012Qualification Procedure for Safety Class High-voltage Switchboard Applied in Nuclear Power Plants$225.00
  72. NB/T 20086-2012Assessing, Monitoring, and Mitigating Aging Effects on Class 1E Equipment Used in Nuclear Power Plants$740.00
  73. NB/T 20087-2012Aging Management Guidance for Instrument and Control Cables Important to Safety for Nuclear Power Plants$500.00
  74. NB/T 20088-2012Requirements for the Replacement Parts and Components for Safety-class Equipment in Nuclear Power Plants$225.00
  75. NB/T 20089-2012Criteria for the protection of class 1E power systems and equipment in nuclear power plants$495.00
  76. NB/T 20090-2012Requirements for preoperational tests of class 1E power systems in nuclear power plants$195.00
  77. NB/T 20091-2012Inspection Guide for the Turbine of Pressurized Water Reactor Nuclear Power Plants$500.00
  78. NB/T 20092-2012Inspection Guide for the Moisture Separator Reheater of Pressurized Water Reactor Nuclear Power Plants$470.00
  79. NB/T 20093-2012Qualification of Safety-related Valve Actuators for Nuclear Power Plants$185.00
  80. NB/T 20094-2012Containment Ventilation System of Pressurized Water Reactor Nuclear Power Plant$315.00
  81. NB/T 20095-2012Design Criteria for HVAC Systems Located Outside Containment of PWR Nuclear Power Plant$405.00
  82. NB/T 20096-2012Failure Mode and Effects Analysis for System of Nuclear Power Plants$470.00
  83. NB/T 20097-2012Concrete Containment Functional Design Requirements for PWR Nuclear Power Plant$405.00
  84. NB/T 20097-2021Concrete containment system functional design requirements for PWR nuclear power plant$470.00
  85. NB/T 20098-2012Design Criteria for Containment Hydrogen Control System of Pressurized Water Reactor Nuclear Power Plants$105.00
  86. NB/T 20098-2024Design criteria for hydrogen control system in containment of pressurized water reactor nuclear power plant$384.00
  87. NB/T 20099-2012Analysis requirements for loss-of-coolant accident of pressurized water reactor nuclear power plants$135.00
  88. NB/T 20100-2012Requirements of overpressure analysis for reactor primary system and main steam system of pressurized water reactor nuclear power plants$135.00
  89. NB/T 20100-2016Requirements of overpressure analysis for reactor coolant system and main steam system for pressurized water reactor nuclear power plants$135.00
  90. NB/T 20101-2012Analysis Requirement for Rod Ejection Accidents of Pressurized Water Reactor Nuclear Power Plants$135.00
  91. NB/T 20101-2021Analysis requirement for rod ejection accidents of pressurized water reactor nuclear power plants$255.00
  92. NB/T 20102-2012Determination of Steady State Neutron Reaction Rate Distributions and Reactivity of Nuclear Reactors$255.00
  93. NB/T 20103-2012Accident Analysis and Safety Criteria for Pressurized Water Reactor Nuclear Power Plant$345.00
  94. NB/T 20103-2023Accident Analysis and Safety Criterion of PWR Nuclear Power Plant$1,019.00
  95. NB/T 20104-2012Analysis Requirement for Anticipated Transient without Scram on Pressurized Water Reactor Nuclear Power Plants$135.00
  96. NB/T 20105-2012Load Code for the Design of Nuclear Power Plants Building Structures$145.00
  97. NB/T 20105-2019Load code for the design of nuclear power plants building structures$465.00
  98. NB/T 20106-2012Code for cooling water model simulation of nuclear power plant$255.00
  99. NB/T 20107-2012Technical Regulation for Construction of Reactor Coolant Pump Installation in PWR Nuclear Power Plant$345.00
  100. NB/T 20108-2012Technical Regulation of Containment Penetration Installation in PWR Nuclear Power Plant$105.00
  101. NB/T 20108-2021Technical regulation of containment penetration installation in PWR nuclear power plants$285.00
  102. NB/T 20109-2012Technical Specification of Neutron Flux Guide Tube Installation in Reactor Building for PWR Nuclear Power Plant$165.00
  103. NB/T 20110-2012Technical Regulation for Installation of PWR Nuclear Power Auxiliary System Equipment$285.00
  104. NB/T 20111-2012General Technical Regulation of Safety-related Valves Installation in PWR Nuclear Power Plant$105.00
  105. NB/T 20112-2012Technical Regulation of the Cable Terminal Connection in the Reactor Building for PWR Nuclear Power Plant$165.00
  106. NB/T 20113-2012Technical Regulation for Construction of HVAC Installation in PWR Nuclear Power Plant$315.00
  107. NB/T 20114-2012Technical regulation for installation of CRDM power supply system of pressurized water reactor nuclear power plants$135.00
  108. NB/T 20115-2012Technical Regulation for Construction and Acceptance of Reactor Pressure Vessel Head Installation in PWR Nuclear Power Plants$165.00
  109. NB/T 20115-2024Technical specification for construction of top structure of pressurized water reactor nuclear power plant$464.00
  110. NB/T 20116-2012General requirements for informatization management of nuclear power plant construction projects$135.00
  111. NB/T 20117-2012Prescriptions of Safety Management for Construction of Nuclear Power Project$165.00
  112. NB/T 20118-2012Regulation for Fire Protection for Nuclear Power Plants Construction$135.00
  113. NB/T 20119-2012Material Item Management Requirements for Nuclear Power Engineering$435.00
  114. NB/T 20120-2012Management Provision for the Technology of Nuclear Power Engineering Construction$135.00
  115. NB/T 20121-2012The Regulation for Editing Construction Organization Plan of Nuclear Power Project$255.00
  116. NB/T 20122-2012Checking-and-acceptance Management Provision for the Quality and the Hand-over of Nuclear Power Engineering Construction$375.00
  117. NB/T 20123-2012Standard for Division of Sub-section and Sub-project in Construction of Nuclear Power Plant$375.00
  118. NB/T 20124-2012Code for Acceptance of Construction of Biological Shielding Concrete of PWR Nuclear Power Plant$285.00
  119. NB/T 20124-2023Code for construction and acceptance of shielding concrete for nuclear power plants$859.00
  120. NB/T 20125-2012Construction Specification of the Foundation Grouting for PWR Safety Important Facility$195.00
  121. NB/T 20126-2012Specifications for Construction and Acceptance of Caulking of PWR Nuclear Island Plant$135.00
  122. NB/T 20126-2023Technical regulations for caulking construction and acceptance of nuclear island building in pressurized water reactor nuclear power plant$464.00
  123. NB/T 20127-2012Technical Requirements for Embedment Parts Manufacture and Installation of PWR Nuclear Power Plant$225.00
  124. NB/T 20127-2019Technical requirements for the manufacture and installation of embedded parts of PWR nuclear power plants$229.00
  125. NB/T 20128-2012Specifications on Construction and Acceptance of Nuclear Island Foundation Pit$255.00
  126. NB/T 20128-2023Code for construction and acceptance of nuclear island foundation pit of nuclear power plant$699.00
  127. NB/T 20129-2012General Technical Regulation for Installation, Test and Acceptance of Emergency Diesel Generator of Nuclear Island in Pressurized Water Reactor Nuclear Power Plants$315.00
  128. NB/T 20129-2023Technical regulations for the installation, testing and acceptance of emergency diesel generator sets for nuclear islands in pressurized water reactor nuclear power plants$859.00
  129. NB/T 20130-2012Concrete Radiation Shielding$285.00
  130. NB/T 20131-2012Design Criteria for Emergency Core Cooling Sump of Pressurized Water Reactors Nuclear Power Plants$315.00
  131. NB/T 20132-2012Design Requirements of Personnel Airlock for Containment in Pressurized Water Reactor Nuclear Power Plants$105.00
  132. NB/T 20133.1-2012Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 1: General Requirements$225.00
  133. NB/T 20133.2-2012Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants. Part 2: Standard Test Method for Evaluating Coatings at Simulated Design Basis Accident (DBA) Conditions$219.00
  134. NB/T 20133.3-2012Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 3: Standard Test Method for Effects of Gamma Radiation$165.00
  135. NB/T 20133.4-2012Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 4: Determination of the Decontaminability of Coatings$135.00
  136. NB/T 20133.5-2012Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 5: Standard Test Method for Chemical Resistance$135.00
  137. NB/T 20133.6-2012Specifications for Protective Coatings Used in Pressurized Water Reactor Nuclear Power Plants - Part 6: Coating Operation$285.00
  138. NB/T 20134-2012Guidelines to Ensure Quality of Collected Data on Reliability of Nuclear Power Plants$105.00
  139. NB/T 20135-2012General Guidelines for Reliability Data Exchange of Nuclear Power Plants$285.00
  140. NB/T 20136-2012Design Criterion for Radiation Controlled Area Access of Nuclear Power Plants$165.00
  141. NB/T 20137-2012Regulation for Staff Training of Radiation Protection in Nuclear Power Plants$195.00
  142. NB/T 20138-2012Individual Monitoring and Workplace Monitoring of Nuclear Power Plant$680.00
  143. NB/T 20139-2012Technical Criteria for Environmental Radioactivity Background Investigation for Nuclear Power Plant$225.00
  144. NB/T 20140-2012Technical Specification for Radiation Protection of Nuclear Power Plants Siting$525.00
  145. NB/T 20141-2012Packaging, Transportation, Loading & Unloading and Storage of Fresh Fuel Assembly for PWR Nuclear Power Plant$165.00
  146. NB/T 20142-2012Guide for Chemical Decontamination of Primary Loop System and Components of PWR Nuclear Power Plants$135.00
  147. NB/T 20143.1-2012Code on nuclear air and gas treatment - Process gas treatment - Part 1: Hydrogen recombiner$135.00
  148. NB/T 20143.3-2017Code on nuclear air and gas treatment - Process gas treatment - Part 3: Delay equipment for radioactive waste gas$165.00
  149. NB/T 20143.4-2021Code for nuclear air and gas treatment - Process gas treatment - Part 4: Compressor$300.00
  150. NB/T 20143.8-2019Process gas treatment Part 8: Silica gel desiccant$180.00
  151. NB/T 20144-2012Initial Criticality Tests for Pressurized Water Reactor of Nuclear Power Plants$105.00
  152. NB/T 20145-2012Compiling criteria of commissioning test procedures and reports for nuclear power plants$135.00
  153. NB/T 20146-2012Design Standard of Automatic Fire Alarm System of Nuclear Power Plants$135.00
  154. NB/T 20147-2012Criteria for Physical Protection Systems for Nuclear Power Plants$435.00
  155. NB/T 20148-2012Resistance Temperature Detectors Important to Safety in Nuclear Power Plants$225.00
  156. NB/T 20149-2012Qualification Procedure for Pressure Transmitter Important to Safety of Nuclear Power Plants$485.00
  157. NB/T 20150-2012Characteristics and Test Methods of Self-powered Neutron Detectors for Nuclear Power Plants$315.00
  158. NB/T 20151-2012Guideline for Preparing Ageing Management Programme of Pressurized Water Reactor Nuclear Power Plants$225.00
  159. NB/T 20152-2012Ageing Management Guideline of Piping in Nuclear Power Plants$375.00
  160. NB/T 20153-2012Ageing Management Guideline of Prestressed Concrete Containment in Nuclear Power Plants$345.00
  161. NB/T 20154-2012Guideline of Ageing Management for PWR Reactor Pressure Vessels$285.00
  162. NB/T 20155-2012Aging Management on Class 1E Equipment Used in Nuclear Power Plants$195.00
  163. NB/T 20156-2012Requirement for Compilation and Optimization for Preventive Maintenance Program at Nuclear Power Plants$135.00
  164. NB/T 20157-2012Quality Assurance Requirements for Construction of Nuclear Power Project$225.00
  165. NB/T 20158-2012Specification for volute concrete construction of circulating water pumps of pressurized water reactor nuclear power plants$135.00
  166. NB/T 20159-2012The Construction Technical Specification for Liner of Reactor Building of PWR Nuclear Power Plant$315.00
  167. NB/T 20159-2021The construction technical specification for steel liner of PWR nuclear power plant$510.00
  168. NB/T 20160-2012The Technical Specification for Watertight Stainless Steel Liner of PWR Nuclear Power Plant$285.00
  169. NB/T 20160-2021Technical specification for covering construction of stainless steel pool in PWR nuclear power plant$420.00
  170. NB/T 20161-2012Installation and Commissioning Technical Guideline for Ex-core Neutron Flux Measuring System for Pressurized Water Reactor of Nuclear Power Plants$225.00
  171. NB/T 20161-2021Technical regulations for installation and testing of external neutron fluence rate measurement system for pressurized water reactor nuclear power plants$539.00
  172. NB/T 20162-2012Technical Requirements on the Cleaning Areas Establishment and Maintenance of PWR Nuclear Island Equipment During Storage, Installation and Start-up$165.00
  173. NB/T 20163-2012Qualification Procedure for Containment Spray Pump and Low Head Safety Injection Pump of Pressurized Water Reactor Nuclear Power Plant$165.00
  174. NB/T 20164-2012Qualification Procedure for Auxiliary Feed Water Motor-driven Pump of Pressurized Water Reactor Nuclear Power Plant$135.00
  175. NB/T 20165-2012Qualification Procedure for Residual Heat Removal Pump of Pressurized Water Reactor Nuclear Power Plant$165.00
  176. NB/T 20166-2012Qualification Procedure for Charging Pump of Pressurized Water Reactor Nuclear Power Plant$165.00
  177. NB/T 20167-2012Qualification Procedure for Isolation Valve of Pressurized Water Reactor Nuclear Power Plants$285.00
  178. NB/T 20168-2012Qualification Procedure for Check Valve of Pressurized Water Reactor Nuclear Power Plants$135.00
  179. NB/T 20169-2012Qualification procedure for turbine-driven auxiliary feedwater pump of pressurized water reactor nuclear power plant$165.00
  180. NB/T 20170-2012Qualification Procedure of Safety Class Diesel-generator Units for Nuclear Power Plants$225.00
  181. NB/T 20171-2012Qualification Procedure for Safety Class 3 Pump of Pressurized Water Reactor Nuclear Power Plant$135.00
  182. NB/T 20172-2012Technical rules for nuclear engineering surveying datum network establishment$1,110.00
  183. NB/T 20173-2012Technical Specification for Installation and Test of Ring Crane in Reactor Building of PWR Nuclear Power Plants$319.00
  184. NB/T 20173-2023Technical regulations for hoisting installation and testing of reactor buildings in pressurized water reactor nuclear power plants$539.00
  185. NB/T 20174-2012Technical Specification for Onsite Manufacture and Acceptance of Carbon Steel & Stainless Steel Tanks of PWR Nuclear Island$239.00
  186. NB/T 20175-2012Technical Specification for Installation and Acceptance of Fuel Handling and Storage System of PWR Nuclear Power Plants$399.00
  187. NB/T 20176-2012Design requirements for hydrogen, nitrogen, oxygen and carbon dioxide supply systems of PWR nuclear power plant$195.00
  188. NB/T 20177-2012Design Criteria for Component Cooling Water System of Pressurized Water Reactor Nuclear Power Plants$135.00
  189. NB/T 20178-2012Design Criteria of Nuclear Sampling System of Pressurized Water Reactor Nuclear Power Plant$135.00
  190. NB/T 20179-2012Design Criteria for Compressed Air System of Nuclear Power Plant$135.00
  191. NB/T 20180-2012Design Criteria for Compressed Air Supplying System of Nuclear Island in Nuclear Power Plant$105.00
  192. NB/T 20181-2012Technical Specification of Radiation Environmental Impact Assessment for Airborne Radioactive Effluents of Nuclear Power Plant on Operational States$315.00
  193. NB/T 20182-2012Technical Specification for Radioactive Environmental Impact Assessment of Working Condition Airborne Radioactive Materials for Nuclear Power Plants$319.00
  194. NB/T 20183-2012Compilation Guideline for Nuclear Power Plant Reliability Assurance Program$135.00
  195. NB/T 20184-2012General Specification on Transport Vessel for Fresh Fuel Assembly of PWR Nuclear Power Plants$105.00
  196. NB/T 20185-2012Design Criterion of Radiation Zoning Inside of the PWR Nuclear Power Plant$135.00
  197. NB/T 20186-2012Calculation of Doses to Public From Routine Releases of Reactor Radioactive Effluents$345.00
  198. NB/T 20187-2012Design Criteria for Reactor Coolant System in Pressurized Water Reactor Nuclear Power Plants$135.00
  199. NB/T 20188-2012Design Criteria for Essential Service Water System for Pressurized Water Reactor Nuclear Power Plant$135.00
  200. NB/T 20189-2012Interface design criteria for nuclear steam supply system and turbine building of pressurized water reactor nuclear power plant$105.00
  201. NB/T 20190-2012Noise Control for Production Buildings of Nuclear Power Plants$135.00
  202. NB/T 20190-2023Noise control in nuclear power plant production buildings$464.00
  203. NB/T 20191-2012Accessibility Criteria for In-service Inspections in Structural Design of Pressurized Water Reactor Nuclear Power Plants$399.00
  204. NB/T 20192-2012General Requirements for Pilot Operated Safety Valves of Pressurized Water Reactor Nuclear Power Plant$195.00
  205. NB/T 20193-2012Code for Design of Steam/Water Piping of Conventional Island in Nuclear Power Plants$1,490.00
  206. NB/T 20194-2012Design Criterion of Radiation Shield in the PWR Nuclear Power Plant$165.00
  207. NB/T 20195-2012Procedure for reactor core thermal power measurement of pressurized water reactor nuclear power plants$225.00
  208. NB/T 20196.1-2013Code on nuclear air and gas treatment - Test procedures - Part 1: Field testing of air treatment systems$970.00
  209. NB/T 20196.1-2023Nuclear Air and Gas Handling Code Test Procedures - Part 1: Field Testing of Air Handling Systems$240.00
  210. NB/T 20196.2-2023Nuclear Air and Gas Handling Code Test Procedures - Part 2: Field Testing of Gas Handling Systems$270.00
  211. NB/T 20197.1-2013Reliability and aging test of instruments and control devices in nuclear power plants - Part 1: Electromagnetic relays$535.00
  212. NB/T 20197.2-2014Reliability and aging detection for instrumentation and control equipment in nuclear power plants - Part 2: Fuses$449.00
  213. NB/T 20197.3-2014Reliability and aging detection for instrumentation and control equipment in nuclear power plants - Part 3: Power supply$285.00
  214. NB/T 20197.4-2015Reliability and aging detection for instrumentation and control equipment in nuclear power plants - Part 4: Circuit Board$465.00
  215. NB/T 20198-2013Aging Management and Practice of Instruments and Control Devices in Nuclear Power Plants$540.00
  216. NB/T 20199-2013Technical specifications for environmental impact assessment of liquid radioactive effluents of coastal nuclear power plants$389.00
  217. NB/T 20200-2013Technical specifications for investigation and evaluation of external human-induced events of nuclear power plants$700.00
  218. NB/T 20201-2013Technical Specifications of Social Environment Investigations Adjacent to the Site of Nuclear Power Plants$319.00
  219. NB/T 20202-2013Test Specifications for Atmospheric Diffusion of Nuclear Power Plants$415.00
  220. NB/T 20203-2013Technical Specification for Ecological Investigation of the Recipient Water of Nuclear Power Plants$319.00
  221. NB/T 20204-2013Technical Requirements for Underwater Lighting Devices of Nuclear Power Plants$415.00
  222. NB/T 20205-2013Qualification Procedure for Safety Class Electric Connectors of Nuclear Power Plants$540.00
  223. NB/T 20206-2013Qualification Procedure for Solenoid Valves for Safety Class Power-operated Valve Actuators of Nuclear Power Plants$600.00
  224. NB/T 20207-2013Qualification test specification for safety class storage batteries of nuclear power plants$399.00
  225. NB/T 20208-2013Qualification of Safety Class Distribution Board for Nuclear Power Plants$309.00
  226. NB/T 20209-2013Type Test for Rod Position Detector Sensitive Elements of Nuclear Power Plants$389.00
  227. NB/T 20210-2013Qualification Procedure for Safety Class Chargers of PWR Nuclear Power Plants$535.00
  228. NB/T 20211-2013Qualification Procedure for Safety Class Medium Voltage Motors of PWR Nuclear Power Plants$540.00
  229. NB/T 20212-2013Qualification Procedure for Safety Class 380V Motors of PWR Nuclear Power Plants$535.00
  230. NB/T 20213-2013Qualification Procedure for Safety Class Cable & Field Splice of Nuclear Power Plants$389.00
  231. NB/T 20214-2013Qualification Procedure for Low-voltage Distribution Board of Nuclear Power Plants$309.00
  232. NB/T 20215-2013Type Test for Micro Fission Chamber Used for In-core Neutron Flux Measuring of PWR Nuclear Power Plants$389.00
  233. NB/T 20216-2013Code for piping installation of nuclear auxiliary systems of PWR nuclear power plants$970.00
  234. NB/T 20216-2024Technical specification for installation of nuclear auxiliary system piping in pressurized water reactor nuclear power plants$2,139.00
  235. NB/T 20217-2013Code for Installation of Process Instruments Important to Safety of Nuclear Power Plants$239.00
  236. NB/T 20218-2013Requirements for electromagnetic compatibility test of instrumentation and control equipment important to safety of nuclear power plants$510.00
  237. NB/T 20219-2013Diagnosis for Valves of Nuclear Power Plants$150.00
  238. NB/T 20220-2013Radiation Surveillance of Pressure Vessels for Light-Water Cooled Reactors$880.00
  239. NB/T 20221-2013Corrosion Examination for Secondary Circuit Thermal Power Equipment of PWR Nuclear Power Plants$229.00
  240. NB/T 20222-2013Aging management guide for PWR steam generators$399.00
  241. NB/T 20223-2013Guide for the Maintenance of Machinery and Equipment Important to Safety of Nuclear Power Plants$309.00
  242. NB/T 20223-2023Guidelines for Maintenance of Mechanical Equipment in Nuclear Power Plants$539.00
  243. NB/T 20224-2013Specification for design and fabrication of control rod drive mechanism of PWR nuclear power plants$535.00
  244. NB/T 20225-2013Qualification of safety class electric connectors of nuclear power plants$405.00
  245. NB/T 20226-2013Qualification of safety class transformers for nuclear power plants$309.00
  246. NB/T 20227-2013Qualification of safety class switchgear assemblies of nuclear power plants$309.00
  247. NB/T 20228-2013Type Tests for the Sensitive Elements and Sensors of Instrumentation and Control System Important to the Safety of Nuclear Power Plants$389.00
  248. NB/T 20229-2013Type tests for electrical modules of instrumentation and control systems important to safety of nuclear power plants$309.00
  249. NB/T 20230-2013Requirements for fracture toughness of PWR coolant pressure boundary materials$229.00
  250. NB/T 20231-2013Design criteria for engineered safety features of PWR nuclear power plants$309.00
  251. NB/T 20231-2023Design criteria for special safety facilities in pressurized water reactor nuclear power plants$539.00
  252. NB/T 20232-2013Code for design of fuel handling and storage system of PWR nuclear power plants$205.00
  253. NB/T 20233-2013Cleaning and cleanliness requirements for nuclear steam supply system equipment of PWR nuclear power plants$700.00
  254. NB/T 20234-2013Code for Design of Cranes Dedicated for Nuclear Power Plants$125.00
  255. NB/T 20235-2013Measurement of wide-range neutron fluence rate by mean square voltage method$520.00
  256. NB/T 20236-2013Rules for Non-destructive Examination of Welds of Containment Leak-resistant Liner of PWR Nuclear Power Plants$389.00
  257. NB/T 20237-2013Code for installation of instrument tubing important to safety in nuclear power plants$229.00
  258. NB/T 20238-2013Code of Radiation Monitoring System Installation in Nuclear Power Plants$169.00
  259. NB/T 20238-2023Technical regulations for the installation of radiation monitoring systems in nuclear power plants$344.00
  260. NB/T 20239-2013Guidelines on Drafting Outlines for Commissioning of PWR Nuclear Power Plants$405.00
  261. NB/T 20240-2013Physics start-up tests of PWR nuclear power plants after refueling$485.00
  262. NB/T 20241-2013Requirements for In-service Inspection of Heat Transfer Tube of PWR Steam Generator$309.00
  263. NB/T 20242-2013Vibration test for piping systems of nuclear power plants$425.00
  264. NB/T 20243-2013Ultrasonic inspection of damaged fuel assemblies of PWR nuclear power plants$189.00
  265. NB/T 20244-2013Plugging Guideline for Heat Transfer Tube of PWR Steam Generator$209.00
  266. NB/T 20245-2013Substitution of items for nuclear power plants$249.00
  267. NB/T 20246-2013Specification for Environmental Radiation Monitoring of Nuclear Power Plants$309.00
  268. NB/T 20247-2013General design requirements for physical protection system of nuclear power plants$365.00
  269. NB/T 20248-2013Guideline for Evaluation of Man-machine Features in Nuclear Power Plants$289.00
  270. NB/T 20251-2013Design criteria for normal air cleaning units in PWR nuclear power plants$245.00
  271. NB/T 20251-2023Design and test criteria for air purification devices in pressurized water reactor nuclear power plants$464.00
  272. NB/T 20252-2013Design criteria for engineered safety feature air cleaning units of PWR nuclear power plants$309.00
  273. NB/T 20253-2013Code for system cleaning of PWR nuclear power plants during installation and commissioning$165.00
  274. NB/T 20254-2013Code for the Leakage Detection of Reactor Coolant System in Nuclear Power Plants$319.00
  275. NB/T 20255-2013Code for Pipeline Design of Instrumentation Important to the Safety of Nuclear Power Plants$319.00
  276. NB/T 20256-2013Seismic design code of nuclear safety related structure$1,140.00
  277. NB/T 20257-2013Examination Standards for License of Operators of Nuclear Power Plants$2,315.00
  278. NB/T 20258.1-2014PWR nuclear power plant module design requirements - Part 1: Mechanical module$189.00
  279. NB/T 20258.2-2014PWR nuclear power plant module design requirements - Part 2: Structural module$389.00
  280. NB/T 20259.1-2014Code of valuation on bill of quantities of nuclear power plant construction works - Part 1: General rules$1,330.00
  281. NB/T 20259.1-2021Specification for valuation of bill of quantities of nuclear power plant construction projects - Part 1: General rules$240.00
  282. NB/T 20259.2-2014Code of valuation on bill of quantities of nuclear power plant construction works - Part 2: Construction works$2,300.00
  283. NB/T 20259.2-2021Code of valuation on bill of quantities of nuclear power plant construction works - Part 2: Construction works$3,125.00
  284. NB/T 20259.3-2014Code of valuation on bill of quantities of nuclear power plant construction works - Part 3: Process equipment and pipe installation$1,410.00
  285. NB/T 20259.3-2021Code of valuation on bill of quantities of nuclear power plant construction works - Part 3: Process equipment and pipe installation$1,625.00
  286. NB/T 20259.4-2014Code of valuation on bill of quantities of nuclear power plant construction works - Part 4: Ventilation and air conditioning$240.00
  287. NB/T 20259.4-2021Code of valuation on bill of quantities of nuclear power plant construction works - Part 4: Ventilation and air conditioning equipment installation$455.00
  288. NB/T 20259.5-2014Code of valuation on bill of quantities of nuclear power plant construction works - Part 5: Electrical equipment installation$950.00
  289. NB/T 20259.5-2021Code of valuation on bill of quantities of nuclear power plant construction works - Part 5: Electrical equipment installation$920.00
  290. NB/T 20259.6-2014Code of valuation on bill of quantities of nuclear power plant construction works - Part 6: Automatic control instrumentation installation$580.00
  291. NB/T 20259.6-2021Code of valuation on bill of quantities of nuclear power plant construction works - Part 6: Automatic control instrumentation installation$500.00
  292. NB/T 20260-2014Design criteria for residual heat removal system of pressurized water reactor nuclear power plants$209.00
  293. NB/T 20260-2023Design criteria for waste heat removal systems in pressurized water reactor nuclear power plants$464.00
  294. NB/T 20261-2014Design criteria for emergency core cooling system of pressurized water reactor nuclear power plants$229.00
  295. NB/T 20262-2014Design criteria for steam generator blowdown system of pressurized water reactor nuclear power plants$129.00
  296. NB/T 20263-2014Design Standard of Communication System of Nuclear Power Plants$165.00
  297. NB/T 20263-2021Code for design of communication system of nuclear power plants$360.00
  298. NB/T 20264-2014Design requirements of passive core cooling system$229.00
  299. NB/T 20265-2014Seismic testing of relays in nuclear power plants$349.00
  300. NB/T 20266-2014Specification for design of condensate polishing, chemical reagents injection and secondary sampling system for PWR nuclear power plants$209.00
  301. NB/T 20267-2014Design criteria for computer-based procedure system in nuclear power plants$429.00
  302. NB/T 20268-2014Rules for the design of safety and relief valve piping of PWR nuclear power plants$285.00
  303. NB/T 20269-2014Design and fabrication specification for reactor coolant pump of pressurized water reactor nuclear power plant$405.00
  304. NB/T 20270-2014Criteria for human factors applications of computerized operating procedure systems in nuclear power plants$270.00
  305. NB/T 20271-2014Requirements of documents and records keeping and maintaining for the decommissioning of nuclear power plants$210.00
  306. NB/T 20272-2014Review and audits for software in nuclear power plants$465.00
  307. NB/T 20273-2014Design criteria of radioactive drain and vent for PWR nuclear power plant$225.00
  308. NB/T 20274-2014Design specification for cathodic protection of buried metallic structure applied in nuclear power plants$240.00
  309. NB/T 20275-2014Stud welding specification for pressurized water reactor nuclear power plants$105.00
  310. NB/T 20276-2014Design criteria for component cooling water system of passive pressurized water reactor nuclear power plants$149.00
  311. NB/T 20277-2014Welding specification for A240 (S32101) duplex stainless steel$209.00
  312. NB/T 20278-2014Design criteria for emergency feedwater system of pressurized water reactor nuclear power plants$150.00
  313. NB/T 20278-2023Design criteria for emergency water supply systems for pressurized water reactor nuclear power plants$464.00
  314. NB/T 20279-2014Thermal evaluation method of electrical insulation systems for control rod drive mechanism coil in nuclear power plants$105.00
  315. NB/T 20280-2014Design criteria of boron recycle system for PWR nuclear power plants$90.00
  316. NB/T 20281-2014Guideline for equipment reliability management at nuclear power plants$180.00
  317. NB/T 20282-2014Technical code for investigation and assessment of large component transportation of nuclear power plants$255.00
  318. NB/T 20283-2014Classification of environmental conditions for qualification of electrical equipment important to safety for nuclear power plants$309.00
  319. NB/T 20284-2014Technical specification for safety class cable heat-shrinkable accessories in nuclear power plants$269.00
  320. NB/T 20285-2014General requirements of reactor system design for pressurized water reactor nuclear power plants$169.00
  321. NB/T 20286-2014Design requirements of passive containment cooling system$229.00
  322. NB/T 20287-2014Design and fabrication rules for refueling machine of PWR nuclear power plants$309.00
  323. NB/T 20288-2014Qualification procedure for safety class valve position switch of nuclear power plants$520.00
  324. NB/T 20290-2014Qualifying of continuous duty safety class motors for nuclear power plants$269.00
  325. NB/T 20291-2014Design criteria for passive PWR NPP normal residual heat removal system$169.00
  326. NB/T 20292-2014Test method for determination of reference temperature T0 for ferritic steels in the ductile-to-brittle transition range for nuclear power plants$520.00
  327. NB/T 20292-2023Test method for the reference temperature T0 of the ductile-brittle transition zone of ferritic steel used in nuclear power plants$1,139.00
  328. NB/T 20293-2014Procedure of nuclear power plant siting$740.00
  329. NB/T 20294-2014Technical requirement for evaluation of preparedness and response for nuclear power plants emergency during operation$189.00
  330. NB/T 20295-2014Ageing management guideline for pressure tubes of pressurized heavy water reactor nuclear power plants$309.00
  331. NB/T 20296-2014Maintenance requirement of electrical, instrumentation and control equipment important to safety of nuclear power plant$269.00
  332. NB/T 20297-2014Guide of human reliability analysis for nuclear power plants$189.00
  333. NB/T 20298-2014Nuclear power plants - Instrumentation and control important to safety - Hardware design requirements for digital systems$405.00
  334. NB/T 20299-2014Technical specification in assessing the environmental impact of thermal discharge for nuclear power plants$229.00
  335. NB/T 20300-2014Nuclear power plants - Instrumentation and control important to safety - Development of HDL-programmed integrated circuits for systems performing category A functions$720.00
  336. NB/T 20301-2014Specification of safety class medium voltage three-phase asynchronous motors for nuclear power plant$329.00
  337. NB/T 20302-2014Specification of safety class low-voltage three-phase asynchronous motors for nuclear power plants$535.00
  338. NB/T 20303-2014Design requirements for prestressed concrete containments for pressurized water reactor nuclear power plants$485.00
  339. NB/T 20303-2024Design specification for prestressed concrete containment of pressurized water reactor nuclear power plant$939.00
  340. NB/T 20304-2014Technical guideline for installation of reactor protection system of pressurized water reactor nuclear power plants$189.00
  341. NB/T 20305-2014Aging management guideline for feeders of pressurized heavy water reactor nuclear power plants$289.00
  342. NB/T 20306-2014Technical code for hydrogeological investigation and evaluation of nuclear power plants$500.00
  343. NB/T 20307-2014Technical code for environmental impact assessment of cooling tower in nuclear power plants$309.00
  344. NB/T 20308-2014Design code for foundations of nuclear safety related buildings of pressurized water reactor nuclear power plants$245.00
  345. NB/T 20308-2024Specification for foundation design of nuclear power plant buildings related to nuclear safety$939.00
  346. NB/T 20309-2014General design requirements of pressurized water reactor nuclear power plants with active safety systems$485.00
  347. NB/T 20310-2014Design requirements for structures of ultimate heat sink for pressurized water reactor nuclear power plants$535.00
  348. NB/T 20311-2014Design criteria for containment spray system of pressurized water reactor nuclear power plants$309.00
  349. NB/T 20312-2014Code on the in-service Inspections of mechanical components of pressurized water reactor nuclear islands$5,570.00
  350. NB/T 20312.1-2023In-service inspection rules for nuclear island machinery and equipment in pressurized water reactor nuclear power plants - Part 1: General requirements$240.00
  351. NB/T 20312.3-2023In-service inspection rules for nuclear island machinery and equipment in pressurized water reactor nuclear power plants - Part 3: Pressure test$195.00
  352. NB/T 20312.4-2023In-service inspection rules for nuclear island machinery and equipment in pressurized water reactor nuclear power plants - Part 4: Inspection methods$725.00
  353. NB/T 20313-2014Documentation system of operating nuclear power plant$259.00
  354. NB/T 20314-2014Transient counting for nuclear power plants$169.00
  355. NB/T 20315-2014Design and fabrication specification for steam generator of pressurized water reactor nuclear power plants$740.00
  356. NB/T 20316-2014Requirements for hot functional tests before core loading for PWR nuclear power plants$145.00
  357. NB/T 20317-2014Management of operating experience feedback in nuclear power plant$319.00
  358. NB/T 20318-2014Pressure transmitter important to safety in nuclear power plants$285.00
  359. NB/T 20319-2014Criteria for preparation of technical specifications for pressurized water reactor nuclear power plants$259.00
  360. NB/T 20320-2014Criteria for nuclear power plant response to an earthquake$590.00
  361. NB/T 20321-2014Design and installation of electric heat tracing system for nuclear power plants$475.00
  362. NB/T 20322-2014Commissioning test and operation criteria for cathodic protection system of buried metallic structures of PWR nuclear power plants$259.00
  363. NB/T 20323-2014Requirements for periodic tests of passive containment cooling system$129.00
  364. NB/T 20324-2014Requirements for periodic tests of passive core cooling system$129.00
  365. NB/T 20325.1-2014Prestressing technology specification for safety containment of PWR nuclear power plants - Part 1: Material$105.00
  366. NB/T 20325.1-2023Prestressing technology specification for containment of PWR nuclear power plantsPart 1: material$210.00
  367. NB/T 20325.2-2014Prestressing technology specification for safety containments of PWR nuclear power plants - Part 2: Test$399.00
  368. NB/T 20325.2-2023PWR Nuclear Power Plant Containment Prestressing Technical Regulations - Part 2: Tests$534.00
  369. NB/T 20325.3-2014Prestressing technology specification for safety containments of PWR nuclear power plants - Part 3: Construction$279.00
  370. NB/T 20325.3-2023Technical specification for containment prestressing of pressurized water reactor nuclear power plants - Part 3: Construction$374.00
  371. NB/T 20325.4-2018Prestressing technology specification for containments of PWR nuclear power plants - Part 4: Monitoring$120.00
  372. NB/T 20327.1-2015Special doors of pressurized water reactor nuclear power plant - Part 1: Design$409.00
  373. NB/T 20327.2-2015Special doors of pressurized water reactor nuclear power plant - Part 2: Construction$309.00
  374. NB/T 20328.1-2015Another code of non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 1: General requirements$169.00
  375. NB/T 20328.2-2015Another code of non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 2: Ultrasonic testing$1,250.00
  376. NB/T 20328.3-2015Another code of non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 3: Radiographic testing$460.00
  377. NB/T 20328.4-2015Another code of non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 4: Penetrant testing$329.00
  378. NB/T 20328.5-2015Another code of non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 5: Magnetic particle testing$409.00
  379. NB/T 20328.6-2015Another code of non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 6: Eddy current testing$349.00
  380. NB/T 20329-2015System/Equipment code for passive PWR nuclear power plant$580.00
  381. NB/T 20330-2015Document code for passive PWR nuclear power plant$129.00
  382. NB/T 20331-2015Technical rule for site parameters of designing nuclear power plants$720.00
  383. NB/T 20332-2015Construction requirements for prestressed concrete containments for pressurized water reactor nuclear power plants$315.00
  384. NB/T 20332-2024Specification for the construction of prestressed concrete containment for pressurized water reactor nuclear power plants$240.00
  385. NB/T 20333-2015Design criteria of safety depressurization and venting system for primary loop of pressurized water reactor nuclear power plant$149.00
  386. NB/T 20334-2015General requirements for noise analysis of reactor and primary loop in pressurized water reactor nuclear power plant$329.00
  387. NB/T 20335-2015Nuclear power plant software configuration management$770.00
  388. NB/T 20336-2015Software project life cycle process in nuclear power plants$1,325.00
  389. NB/T 20337-2015Seismic qualification of class 1E metal-enclosed switchgear assemblies in nuclear power plants$349.00
  390. NB/T 20338-2015In situ measurements for response time of resistance temperature detectors important to safety in nuclear power plants$209.00
  391. NB/T 20339-2015Technical specification for self-compacting concrete application of nuclear power plant$405.00
  392. NB/T 20340-2015Technical specification for installation and acceptance of passive fire protection structure of PWR nuclear power plant$289.00
  393. NB/T 20341-2015Technical specification for nuclear island building hole blocking material and caulking material of PWR nuclear power plants$720.00
  394. NB/T 20342-2015Data communication in system performing category A functions for instrumentation and control systems important to safety in nuclear power plants$189.00
  395. NB/T 20343-2015Design and fabrication specification for the thermal insulation of reactor vessel and reactor coolant pipings and equipments of PWR nuclear power plants$189.00
  396. NB/T 20343-2021Design and fabrication specification for the thermal insulation of reactor vessel and reactor coolant piping and equipment of PWR nuclear power plants$360.00
  397. NB/T 20344-2015Qualification procedure of safety class electronic equipment in nuclear power plants$485.00
  398. NB/T 20345-2015Technical specification for installation and test of faulted fuel sipping device in PWR nuclear power plants$149.00
  399. NB/T 20346-2015Technical specification for fabrication and installation of polar crane runway beams in reactor building of PWR nuclear power plants$409.00
  400. NB/T 20347-2015Technical code for site safety analysis of nuclear power plants at the feasibility study stage$505.00
  401. NB/T 20348-2015Technical specification for installation and test of containment instrumentation system of PWR nuclear power plants$425.00
  402. NB/T 20349-2015Technical specification for as-cast finish concrete construction of PWR nuclear power plants$169.00
  403. NB/T 20350-2015Quality assurance classification and management requirements for advanced passive nuclear power plant in design and construction phase$930.00
  404. NB/T 20350-2024Quality Assurance Classification and Management Requirements for the Design and Construction Phase of Nuclear Power Plants$240.00
  405. NB/T 20351-2015Qualifying safety class protective relays and auxiliaries for nuclear power plant$389.00
  406. NB/T 20352-2015Erection technical regulations for safety class cable heat-shrinkable accessories in nuclear power plants$229.00
  407. NB/T 20353-2015Erection technical regulations for loose parts and vibration monitoring system for PWR nuclear power plants$169.00
  408. NB/T 20354.1-2015Design and manufacturing specification of steam turbine rotors for pressurized water reactor nuclear power plants - Part 1: Integral rotor$169.00
  409. NB/T 20354.2-2015Design and manufacturing specification of steam turbine rotors for pressurized water reactor nuclear power plants - Part 2: Shrunk-on rotor$169.00
  410. NB/T 20354.3-2015Design and manufacturing specification of steam turbine rotors for pressurized water reactor nuclear power plants - Part 3: Welded rotor$189.00
  411. NB/T 20355-2015Scale nuclear power plant construction nuclear island construction and installation costs$210.00
  412. NB/T 20355-2018Cost quota of building and installation engineering for nuclear island of nuclear power plant construction projects$210.00
  413. NB/T 20356-2015Quota conventional island nuclear power plant construction project construction and installation costs$270.00
  414. NB/T 20356-2018Cost quota of building and installation engineering for conventional island of nuclear power plant construction projects$240.00
  415. NB/T 20357-2015Nuclear power plant construction project Jixietaiban fixed costs$2,285.00
  416. NB/T 20357-2018Machinery cost quota for nuclear power plant construction project$2,800.00
  417. NB/T 20358.1-2015Nuclear power plant construction project budget quota - Part 1: the nuclear island building works$5,060.00
  418. NB/T 20358.1-2018Cost estimation of nuclear power plant construction project - Part 1: Civil engineering for nuclear island$3,755.00
  419. NB/T 20358.10-2015Nuclear power plant construction project budget quota - Part 10: Nuclear Island Steel Works$5,645.00
  420. NB/T 20358.10-2018Cost estimation of nuclear power plant construction project - Part 10: Anticorrosion and thermal insulation engineering for nuclear island$4,160.00
  421. NB/T 20358.11-2015Nuclear power plant construction project budget quota - Part 11: Conventional Island construction project$10,505.00
  422. NB/T 20358.11-2018Cost estimation of nuclear power plant construction project - Part 11: Civil engineering for conventional island$8,435.00
  423. NB/T 20358.12-2015Nuclear power plant construction project budget quota - Part 12: Conventional Island Thermal Equipment Installation Engineering$11,090.00
  424. NB/T 20358.12-2018Cost estimation of nuclear power plant construction project - Part 12: Thermal equipment installation engineering for conventional island$8,405.00
  425. NB/T 20358.13-2015Nuclear power plant construction project budget quota - Part 13: Conventional Island installation of electrical equipment$10,280.00
  426. NB/T 20358.13-2018Cost estimation of nuclear power plant construction project - Part 13: Electrical equipment installation engineering for conventional island$7,775.00
  427. NB/T 20358.14-2021Budget quotas of nuclear power plant construction project works - Part 14: Manufacture of module and containment vessel$4,700.00
  428. NB/T 20358.15-2021Budget quotas of nuclear power plant construction project works - Part 15: Assembly and installation of module and steel containment vessel$1,775.00
  429. NB/T 20358.2-2015Nuclear power plant construction project budget quota Part 2: Nuclear Island Decoration Engineering$3,080.00
  430. NB/T 20358.2-2018Cost estimation of nuclear power plant construction project - Part 2: Decoration engineering for nuclear island$2,360.00
  431. NB/T 20358.3-2015Nuclear power plant construction project budget quota - Part 3: Equipment Installation Engineering Nuclear Technology$1,625.00
  432. NB/T 20358.3-2018Cost estimation of nuclear power plant construction project - Part 3: Steel structure engineering for nuclear island$1,205.00
  433. NB/T 20358.4-2015Nuclear power plant construction project budget quota - Part 4: the nuclear island installation process pipeline project$3,935.00
  434. NB/T 20358.4-2018Cost estimation of nuclear power plant construction project - Part 4: Mechanical equipment installation engineering for nuclear island$2,885.00
  435. NB/T 20358.5-2015Nuclear power plant construction project budget quota - Part 5: the nuclear island ventilation and air conditioning installation works$8,765.00
  436. NB/T 20358.5-2018Cost estimation of nuclear power plant construction project - Part 5: Pipe installation engineering for nuclear island$6,575.00
  437. NB/T 20358.6-2015Nuclear power plant construction project budget quota - Part 6: nuclear island installation of electrical equipment$3,035.00
  438. NB/T 20358.6-2018Cost estimation of nuclear power plant construction project - Part 6: Ventilation and air-conditioning installation engineering for nuclear island$2,315.00
  439. NB/T 20358.7-2015Nuclear power plant construction project budget quota - Part 7: the nuclear island automation and control instrumentation installation works$8,735.00
  440. NB/T 20358.7-2018Cost estimation of nuclear power plant construction project - Part 7: Electrical equipment installation engineering for nuclear island$6,530.00
  441. NB/T 20358.8-2015Nuclear power plant construction project budget quota - Part 8: the nuclear island equipment installation project$4,445.00
  442. NB/T 20358.8-2018Cost estimation of nuclear power plant construction project - Part 8: Automation control instrument installation engineering for nuclear island$3,305.00
  443. NB/T 20358.9-2015Nuclear power plant construction project budget quota - Part 9: Nuclear Island corrosion, insulation works$3,500.00
  444. NB/T 20358.9-2018Cost estimation of nuclear power plant construction project - Part 9: Communication equipment installation engineering for nuclear island$2,525.00
  445. NB/T 20359-2015Configuration management of nuclear power plants$285.00
  446. NB/T 20360-2015Design Requirements for Tornado Protection of Nuclear Safety Related Civil Structures$135.00
  447. NB/T 20361.1-2015In-service testing of mechanical components in nuclear islands of nuclear power plants - Part 1: General requirements$135.00
  448. NB/T 20361.2-2015In-service testing of mechanical components in nuclear islands of nuclear power plants - Part 2: Pumps$210.00
  449. NB/T 20361.3-2015In-service testing of mechanical components in nuclear islands of nuclear power plants - Part 3: Valves$390.00
  450. NB/T 20361.4-2015In-service testing of mechanical components in nuclear islands of nuclear power plants - Part 4: Snubbers$360.00
  451. NB/T 20362-2015General Technical Requirements for the Design and Construction of PWR Safety Class 2 Centrifugal Pumps$285.00
  452. NB/T 20363-2015General Technical Requirements for the Design and Construction of PWR Safety Class 3 Centrifugal Pumps$285.00
  453. NB/T 20364-2015Specifications of flexible graphite sheet for nuclear power plant$85.00
  454. NB/T 20365-2015Specifications of graphite sealing gaskets for nuclear power plant$150.00
  455. NB/T 20366-2015Test methods for graphite gaskets of safety related nuclear power plants$150.00
  456. NB/T 20367-2015Qualification procedure for safety classified graphite gasket of nuclear power plants$90.00
  457. NB/T 20368-2016Modification management for nuclear power plant$210.00
  458. NB/T 20369-2016The establishment and implementation of severe accident management guidance for nuclear power plant$180.00
  459. NB/T 20370-2016Nuclear island general layout criteria for passive PWR nuclear power plant major systems$270.00
  460. NB/T 20371-2016Specification for pressurizer installation in PWR nuclear power plant$105.00
  461. NB/T 20372-2016Technical regulation for installation of control rod drive mechanism in PWR nuclear power plant$480.00
  462. NB/T 20373-2016Graphical symbols and letter codes for passive PWR nuclear power plant design$755.00
  463. NB/T 20374-2016Sampling airborne radioactive materials from the stacks of nuclear power plant$1,175.00
  464. NB/T 20375-2016Thermocouples important to safety in nuclear power plants$270.00
  465. NB/T 20376-2016Installation and acceptance regulation for nuclear island main steam superpiping of PWR nuclear power plant$150.00
  466. NB/T 20377-2016Technical Specification for Installation of Passive PWR Steam Generator$390.00
  467. NB/T 20378-2016Design Specification for Mix Design of Shielding Concrete Used in Nuclear Power Plant$225.00
  468. NB/T 20379-2016Time response design criteria for safety-related operator actions in nuclear power plants$255.00
  469. NB/T 20380-2016Requirements for nuclear steam supply system makeup water for pressurized water reactor nuclear power plant$150.00
  470. NB/T 20381-2016Design criteria for chemical and volume control system in pressurized water reactor nuclear power plants$210.00
  471. NB/T 20382-2016Vibration monitoring of internal structures in pressurized water reactor nuclear power plants$435.00
  472. NB/T 20383-2016Control of access to high and super-high radiation areas in nuclear power plants$210.00
  473. NB/T 20384-2016Requirements of design and construction of nuclear power plants to facilitate decommissioning$150.00
  474. NB/T 20385-2016General technical requirements for hoisting of heavy items in nuclear power plants$180.00
  475. NB/T 20386-2016General technical requirements for transportation of large items of nuclear power plant$180.00
  476. NB/T 20387-2016Specification for winter concrete construction of nuclear power engineering$165.00
  477. NB/T 20388-2016Specifications for construction and acceptance for openings sealing in nuclear island of PWR nuclear power plant$240.00
  478. NB/T 20389-2016Structural design code for the tunnels of water intake and outlet for nuclear power plants$480.00
  479. NB/T 20390-2016Technical regulation for construction and acceptance of mechanical module installation in PWR nuclear power plant$315.00
  480. NB/T 20391-2016PWR nuclear power plant steel containment vessel assembly, installation and acceptance specification$545.00
  481. NB/T 20392-2016Technical regulation for construction and acceptance of reactor vessel installation in passive PWR nuclear power plant$495.00
  482. NB/T 20393-2016Specification of pressurizer electric heater for pressurized water reactor nuclear power plants$150.00
  483. NB/T 20394-2016Design and qualification of class 1E control boards, panels and racks in nuclear power plants$150.00
  484. NB/T 20395-2017Design for habitability of the main control room$150.00
  485. NB/T 20396-2017Code for construction of nuclear safety related steel structures for pressurized water reactor nuclear power plant$225.00
  486. NB/T 20397-2017Technical regulations for the prefabrication and installation of piping supports and hangers in pressurized water reactor nuclear power plants$360.00
  487. NB/T 20398-2017Construction and inspection specification for reactor building internal structure of PWR nuclear power plant$240.00
  488. NB/T 20399-2017Specification for nuclear safety-related concrete structures construction and acceptance in PWR nuclear power plant$515.00
  489. NB/T 20400-2017Technical specification for fabrication of stainless steel elements of reactor cavity pool and spent fuel pool in PWR nuclear power plant$270.00
  490. NB/T 20401-2017Specification for content and depth of preliminary design documents of nuclear power plants$1,475.00
  491. NB/T 20402-2017Single failure criteria for pressurized water reactor fluid systems important to safety$90.00
  492. NB/T 20403-2017Subcompartment pressure and temperature transient analysis in pressurized water reactors$465.00
  493. NB/T 20404-2017Pressure and temperature transient analysis for pressurized water reactor containments$450.00
  494. NB/T 20405-2017Code for management of engineering general contracting of nuclear power construction projects$530.00
  495. NB/T 20406-2017Containment isolation device for fluid system of pressurized water reactor nuclear power plant$465.00
  496. NB/T 20407-2017Specification for design and fabrication of reactor vessel internals in pressurized water reactor nuclear power plants$485.00
  497. NB/T 20408-2017Requirements for packaging, shipping, handling, receiving, storage and maintaining of item for nuclear power plants$195.00
  498. NB/T 20409-2017Guide for repair of nuclear safety-related buildings (structures) in nuclear power plant$195.00
  499. NB/T 20410-2017Technology specification for nuclear power engineering fiber reinforced concrete$210.00
  500. NB/T 20411-2017Design regulation for nuclear safety-related structural embedment$405.00