NB/T 20149-2012Qualification Procedure for Pressure Transmitter Important to Safety of Nuclear Power Plants (English PDF)
核电厂安全重要压力变送器鉴定规程
This is a limited preview
Buy now to download the full PDF (53 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20149-2012 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
October 19, 2012
Implementation date
March 1, 2013
Scope
NB/T 20149-2012 is the English-translated version of 核电厂安全重要压力变送器鉴定规程.
NB/T 20149-2012 lays down how pressure transmitters important to safety in PWR nuclear power plants are qualified, covering gauge, negative gauge, differential and absolute pressure types.
It fixes the content of the qualification test program (device identification, normal, abnormal and design basis accident conditions, qualified life, margins, sample selection, ageing evaluation, test sequence and acceptance criteria) and then the tests themselves: compliance inspection, dielectric strength and insulation resistance reference tests, influence quantity limits such as dry heat, low temperature and mechanical shock, performance change over time and design basis accident simulation, followed by records and reports.
Software qualification of smart transmitters is excluded, and other reactor types may refer to it. Issued on 19 October 2012, it has applied since 1 March 2013.
Found what you need?
Document preview — NB/T 20149-2012
National Standard of the People's Republic of China
Issued by: National Energy Administration of the People's Republic of China
Contents
- Foreword4
- 1 Scope5
- 2 Normative references5
- 3 Terms and definitions6
- 4 Qualification test requirements9
- 4.1 General requirements9
- 4.2 Basic requirements for qualification tests9
- 4.3 Qualification test documents9
- 5 Program of qualification test9
- 5.1 Basic requirements9
- 5.2 Description of qualification device10
- 5.3 Qualification test conditions10
- 5.4 Qualification life goals11
- 5.5 Qualification margin11
- 5.6 Monitoring of functional characteristics during test12
- 5.7 Selection of test samples12
- 5.8 Evaluation of aging effects12
- 5.9 Maintenance during the test13
- 5.10 Test sequence13
- 5.11 Acceptance criteria14
- 5.12 Evaluation of test process14
- 6 Qualification test15
- 6.1 Compliance inspection and test preparation15
- 6.2 Reference test16
- 6.3 Test of influence quantity limit20
- 6.4 Test for evaluating the performance change of equipment over time33
- 6.5 Simulation test of design basis accident39
- 7 Records and reports47
- 7.1 Qualification test record47
- 7.2 Qualification test report47
- Appendix A (Informative) Descriptions of pressure transmitter's characteristics48
- Appendix B (Informative) Accuracy calculation50
- Appendix C (Informative) Typical LOCA test curve53
1 Scope
This standard specifies the test methods, test items and sequence, test and acceptance criteria during the test period for the qualification of the pressure transmitter important to safety of nuclear power plants (including positive, negative gauge pressure, differential pressure and absolute pressure).
This standard is applicable to the qualification of pressure transmitters for PWR nuclear power plants, not to the software qualification of intelligent pressure transmitters. The pressure transmitter of other types of nuclear power plant may refer to this standard.
2 Normative references
The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this standard.
GB/T 2423.1 Environmental testing for electric and electronic and electronic products - Part 2: Test methods - Tests A. Cold
GB/T 2423.2 Environmental testing for electric and electronic products - Part
GB/T 2423.3 Environmental testing - Part 2: Testing method - Test Cab. Damp heat, steady state
GB/T 2423.4 Environmental testing for electric and electronic products - Part
GB/T 2423.5 Environmental testing for electric and electronic products - Part
GB/T 2423.10 Environmental testing for electric and electronic products - Part 2: Tests methods - Test Fc. Vibration (sinusoidal)
GB/T 29308 Management requirement of ageing of instrumentation and control systems important to safety for nuclear power plants
GB/T 12727 Qualification of safety class electrical equipment for nuclear power plants
3 Terms and definitions
The terms and definitions defined in GB/T 12727 as well as the following terms and definitions apply to this document.
3.1 Pressure transmitter
The instrument that converts the process variables (pressure, pressure difference, liquid level, flow) into 4 mA ~ 20 mA standard electrical signals
3.2 Gauge pressure (or absolute pressure) transmitter
Transmitter whose output electrical signal is proportional to gauge pressure (or absolute pressure) applied to the pressure tap.
3.3 Differential pressure transmitter
The transmitter whose output electrical signal is proportional to the pressure difference between its two pressure taps.
3.4 Static pressure
Static pressure; differential pressure transmitter.
Gauge or absolute pressure applied to a pressure tap of the transmitter.
3.5 Gauge pressure; absolute pressure
The pressure applied to the pressure tap of the transmitter for gauge pressure (or absolute pressure).
3.6 Influence quantities
The quantity that is not measured but can affect the measurement result.
4 Qualification test requirements
4.1 General requirements
The qualification of the pressure transmitter shall prove that during the life of the qualification, under the environmental conditions of the design basis accident, the pressure transmitter important for safety has the characteristics of implementing the safety functions specified in the technical specifications (including insulation resistance, accuracy, response time).
4.2 Basic requirements for qualification tests
Each qualification test of the pressure transmitter shall be performed on the same type of pressure transmitter. The test sample shall be consistent with the actual transmitter in terms of design, material and manufacturing process. The test conditions shall meet or exceed the most severe environmental and operating conditions that may actually be experienced.
4.3 Qualification test documents
The qualification test results of the pressure transmitter shall be documented as evidence that the pressure transmitter can implement its safety function during the qualification life period and design basis accident period.
5 Program of qualification test
5.1 Basic requirements
The qualification of the pressure transmitter shall first compile the applicable qualification test program, detailing the inspections, tests, performance indicators, acceptance criteria, required analysis as required by the test sample's qualification test to prove that the pressure transmitter implements its safety function.
5.2 Description of qualification device
5.2.1 Identification of device
It shall detail the type, manufacturer, procurement technical specifications and manufacturing related documents of the pressure transmitter to be qualified (including descriptions of functional and structural characteristics, drawings, operation and maintenance manuals, material descriptions, relevant standard, specifications).
5.3 Qualification test conditions
5.3.1 Test conditions during normal and abnormal operation
The qualification test program of the pressure transmitter shall determine the magnitude of the test conditions (including rated values and limit values) and their expected duration during normal and abnormal operation of the power plant. These conditions include at least the following. […]
5.3.2 Test conditions for design basis accidents
The qualification test program of the pressure transmitter shall determine the simulation test conditions during and after the following design basis accidents, as well as the duration required to implement the safety function. These conditions include changes in temperature, pressure, radiation dose over time, chemical conditions, seismic loads, power supply surges.
5.4 Qualification life goals
The qualification test program shall, based on the power plant's management requirements and the pressure transmitter's technical specification requirements, determine the target value of pressure transmitter's qualification life. If the equipment specification does not determine the qualification life target, the qualification test program shall determine the qualification life target of the pressure transmitter according to GB/T 12727.
5.5 Qualification margin
In order to ensure that the pressure transmitter has satisfactory performance under severe environmental and operating conditions, the qualification test shall consider the qualification margin.
5.6 Monitoring of functional characteristics during test
The qualification test program shall determine the electrical performance and functional characteristics (insulation resistance, accuracy, and / or response time) to be measured during each test of the pressure transmitter and at the end of the test and after the equipment is restored.
5.7 Selection of test samples
Some test items of the pressure transmitter's qualification test may not be conducted on the same test sample. The test shall determine the number of test samples based on the installation location of the pressure transmitter (inside the containment, in the equipment compartment, in the containment annular space or outside the containment) as well as the configuration of the test item.
5.10 Test sequence
The qualification test of the pressure transmitter shall be carried out in accordance with the test sequence requirements as specified in GB/T 12727.
The test program shall formulate detailed test steps and sequences for transmitters of different types of qualification requirements; the test sequence's configuration shall be such that the test samples are in the most severely degraded state at the end of the qualification life. Table 1 lists the test sequences for reference.
5.11 Acceptance criteria
The test program shall determine the acceptance criteria for the electrical performance and functional characteristics of the test samples at each stage of the qualification test based on the performance requirements specified in the technical specifications for equipment purchase.
5.12 Evaluation of test process
The values of functional characteristics monitored by each test during the qualification test shall be compared with the acceptance criteria. If a deviation occurs, it shall be based on the analysis and evaluation of the acceptance criteria to determine whether to continue or abort the test.
6 Qualification test
6.1 Compliance inspection and test preparation
6.1.1 Compliance inspection
Prior to the start of the qualification test, it shall perform the compliance inspection of the test samples and relevant documents (including material qualification certificates, strength calculations, etc.), to confirm that the samples to be tested represent pressure transmitters that require on-site installation (see Appendix A).
6.1.2 Test preparation
6.1.2.1 Adjustment of pressure transmitter
Each test of the pressure transmitter's qualification test shall be conducted after the zero point and sensitivity are adjusted in accordance with the operating instructions of the pressure transmitter. Zero point and sensitivity are adjusted as follows. […]
6.1.2.2 Power supply and load resistance
The power supply voltage used for testing and measurement is equal to the rated value given in the technical specifications; the ripple factor of the power supply is less than 0.1% of the power supply voltage; the load resistance value of the pressure transmitter is equal to the rated value specified in the identification file.
6.2 Reference test
6.2.1 Dielectric strength measurement
6.2.1.1 Test conditions
The test is conducted by the use of an AC sine wave voltage which has a rated frequency of 50 Hz. The test voltage is as shown in Table 2.
The test shall be conducted under normal atmospheric conditions, see JJG 882.
The pressure transmitter, together with the electrical connector, is grounded as follows. […]
6.2.1.2 Test
Disconnect the power supply of the pressure transmitter. Short-circuit the power terminal and the output terminal respectively. Measure the dielectric strength between the power terminal and the ground terminal (housing), the power terminal and the output terminal, the output terminal and the ground terminal (housing) on the withstanding voltage tester.
6.2.1.3 Acceptance criteria
There shall be no breakdown or arcing in 1 minute.
6.2.2 Measurement of insulation resistance
6.3 Test of influence quantity limit
6.3.1 Dry heat test
6.3.1.1 Overview
The purpose of this test is to verify the adaptability of the dry heat effect of the pressure transmitter during transportation and storage.
6.3.1.2 Test conditions
This test shall be carried out in accordance with the provisions of GB/T 2423.2 (Test B).
6.3.1.3 Measurement
After 4h restoration, it shall carry out the following measurements.
6.3.1.4 Acceptance criteria
If the technical specifications do not specify clearly, it may adopt the following acceptance criteria.
6.3.2 Low temperature test
6.3.2.1 Overview
The purpose of this test is to verify the low temperature adaptability of the pressure transmitter during transportation and storage.
6.3.2.2 Test conditions
This test shall be carried out in accordance with the provisions of GB/T 2423.1 (Test A).
6.3.5 Mechanical shock resistance test
6.3.5.1 Overview
The purpose of this test is to simulate the random impact adaptability that the pressure transmitter may be subjected to during use or transportation.
6.3.5.2 Test conditions
This test shall meet the requirements of GB/T 2423.5.
The test is carried out under normal atmospheric conditions. The equipment is not energized; it is fixed on a rigid bracket according to the on-site fixing method of the pressure transmitter. The impact force shall be applied vertically on each plane of the three reference axis of the pressure transmitter.
7 Records and reports
7.1 Qualification test record
Qualification test records shall include at least.
a) The model, identification and number of the device under test;
b) The name, model and number of the test device, equipment and instruments used;
c) Detailed data and recording curves of test conditions;
d) Record (or record form) of each test;
e) Abnormal conditions that occurred during the test;
f) Tester's signature and date.
7.2 Qualification test report
The qualification test report shall include at least. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 53 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2423.1Environmental testing for electric and electronic products - Part 2: Test methods - Tests A: Cold
- GB/T 2423.2Environmental testing for electric and electronic products - Part 2: Test methods - Tests B: Dry heat
- GB/T 2423.3Environmental testing - Part 2: Testing method - Test Cab: Damp heat, steady state
- GB/T 2423.4Environmental testing for electric and electronic products - Part 2: Test method - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
- GB/T 2423.5Environmental testing - Part 2: Test methods - Test Ea and guidance: Shock
- GB/T 2423.10Environmental testing - Part 2: Test methods - Test Fc: Vibration (sinusoidal)
Similar standards
How to Download NB/T 20149-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 12727-2023 — Qualification of electrical equipment important to safety for nuclear power plants
GB/T 2423.1-2008 — Environmental testing for electric and electronic products - Part 2: Test methods - Tests A: Cold