NB/T 20077-2012Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plants Seismic Instrumentation (English PDF)
核电厂地震仪表记录的处理和初步评估
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20077-2012 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
January 6, 2012
Implementation date
April 6, 2012
Scope
NB/T 20077-2012 is the English-translated version of 核电厂地震仪表记录的处理和初步评估.
NB/T 20077-2012 is a recommended Chinese energy industry standard on the handling and first evaluation of the records produced by nuclear power plant seismic instrumentation.
It sets criteria for acquiring, processing and storing those records promptly, and for the initial assessment that decides whether an earthquake at the site has exceeded the operating basis earthquake.
Land-based light water reactor plants are its field of use, and plants of other types may follow it for reference. It stands apart from the plant inspection carried out immediately after an earthquake, from the procedures for a safe and orderly shutdown, and from the long-term assessment of structure and equipment response data.
It quotes NB/T 20076-2012 and took over from EJ/T 821-1994. Issued on 6 January 2012, it has applied since 6 April 2012.
Found what you need?
Document preview — NB/T 20077-2012
National Standard of the People's Republic of China
- ICS
- 27.120.99
- Replacing
- EJ/T 821-1994
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20077-2012 cites the following standards, which apply in full or in part through the references made to them in its clauses.
NB/T 20076-2012
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
Editions of NB/T 20077
| Edition | Title | Revision | Status |
|---|---|---|---|
| NB/T 20077-2012 | Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plants Seismic Instrumentation | current edition | Current |
| EJ/T 821-1994 | Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plants Seismic Instrumentation | previous edition | Superseded |
This page sells the current edition, NB/T 20077-2012. Earlier editions are listed for reference only.
How to Download NB/T 20077-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20076-2012 — Earthquake Instrumentation Criteria for Nuclear Power Plants
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20077-2012
$165.00