GB/T 41587-2022Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants (English PDF)

压水堆核电厂装料前冷态性能试验要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 41587-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 11, 2022

Implementation date

February 1, 2023

Scope

GB/T 41587-2022 is the English-translated version of 压水堆核电厂装料前冷态性能试验要求.

GB/T 41587-2022 sets the requirements for the cold performance test carried out at a pressurized water reactor nuclear power plant before fuel is loaded for the first time.

It fixes the test conditions, the content, the acceptance criteria and the test records and report.

The conditions to be met beforehand are listed one by one: the organisation, responsibilities and staffing are in place, the personnel are qualified and authorised, the commissioning documents are in force, the test schedule is set, structures, systems and components are installed to design, equipment and subsystems have been verified, the combined flushing of the single systems and the nuclear steam supply system is finished, and the data acquisition, analysis and control functions meet the design.

It cites GB/T 28548-2012 and NB/T 20145, was issued on 11 July 2022 and has applied since 1 February 2023.

Found what you need?

Document preview — GB/T 41587-2022

National Standard of the People's Republic of China

ICS
27.120.20
Classification
F 63

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Test conditions
  • 5 Test content
  • 6 Acceptance criteria
  • 7 Test records and reports

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.

1 Scope

This document specifies the test conditions, test contents, acceptance criteria and test records for the cold performance test before initial fuel loading of PWR nuclear power plants and report.

This document is applicable to the cold performance test before the initial fuel loading of the pressurized water reactor nuclear power plant.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.

GB/T 28548-2012 Technical Guidelines for Hydrostatic Test of Main Circuit of Nuclear Power Plant

NB/T 20145 Nuclear power plant commissioning test procedures and report writing specifications

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Commissioning

The process of operating installed nuclear power plant components and systems and verifying that their performance conforms to design requirements and related criteria.

Note: Commissioning includes tests without nuclear reactions and with nuclear reactions.

3.2 Cold performance test

Initial start-up of fluid systems and support systems to obtain initial operating data of equipment, operational compatibility with connected systems, and verification of this some system functions.

4 Test conditions

The test conditions of the cold state performance test before charging mainly include.

a) The organizational structure, division of responsibilities, human resources, planning and administrative management have been arranged;

b) The staffing and training meet the requirements, and the personnel have passed the necessary qualification review and have been authorized;

c) The debugging file has taken effect;

d) The test schedule has been formulated, and each item of the cold performance test can be carried out in an orderly and controlled manner;

e) structures, systems and components have been installed in accordance with design requirements and technical conditions;

f) Before the cold performance test, the function of the equipment, subsystem or component has been verified, and the system is in a state suitable for starting the test;

g) The combined flushing of the single system and the nuclear steam supply system has been completed;

h) Mechanical equipment, electrical equipment and instrumentation and control equipment have been inspected and meet the test requirements;

i) Data acquisition, data analysis and control functions meet the design requirements;

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 41587-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 41587-2022

$150.00