Valid

NB/T 20072-2012Determination and Maintenance of Trip Setpoints for Instrumentation of Safety Systems in Nuclear Power Plants (English PDF)

核电厂安全系统仪表触发整定值的确定和保持

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 20072-2012 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

January 6, 2012

Implementation date

April 6, 2012

Scope

NB/T 20072-2012 is the English-translated version of 核电厂安全系统仪表触发整定值的确定和保持.

NB/T 20072-2012 is the Chinese energy industry standard that governs how trip setpoints are determined and maintained for the instrumentation of nuclear power plant safety systems.

It sets the requirements for establishing those setpoints and for keeping them within the values assumed for the plant and its reactor. The standard covers the determination and maintenance of the trip values of nuclear power plant safety systems, and it may equally be used for the setpoints of the safety systems of other nuclear reactors.

It is a modified adoption of IEC 61888-2002 and quotes IEC 60671. It supersedes EJ/T 799-2006. Issued on 6 January 2012, it has applied since 6 April 2012.

Found what you need?

Document preview — NB/T 20072-2012

National Standard of the People's Republic of China

ICS
27.120.20
Replacing
EJ/T 799-2006

Issued by: National Energy Administration of the People's Republic of China

Contents

  • 2 Normative references

2 Normative references

NB/T 20072-2012 cites the following standards, which apply in full or in part through the references made to them in its clauses.

IEC 60671

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of NB/T 20072

EditionTitleRevisionStatus
NB/T 20072-2012Determination and Maintenance of Trip Setpoints for Instrumentation of Safety Systems in Nuclear Power Plantscurrent editionCurrent
EJ/T 799-2006Determination and Maintenance of Trip Setpoints for Instrumentation of Safety Systems in Nuclear Power Plantsprevious editionSuperseded

This page sells the current edition, NB/T 20072-2012. Earlier editions are listed for reference only.

How to Download NB/T 20072-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20072-2012

$255.00