NB/T 20376-2016Installation and acceptance regulation for nuclear island main steam superpiping of PWR nuclear power plant (English PDF)
压水堆核电厂核岛超级管道安装及验收技术规程
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20376-2016 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
February 5, 2016
Implementation date
July 1, 2016
Scope
NB/T 20376-2016 is the English-translated version of 压水堆核电厂核岛超级管道安装及验收技术规程.
NB/T 20376-2016 is the Chinese energy industry standard for the main steam super piping of the nuclear island in a pressurized water reactor nuclear power plant.
It gives the technical requirements for installing that piping and for accepting the installed work. Its scope is the installation and acceptance of the main steam super piping during the erection of pressurized water reactor plants.
It quotes NB/T 20003.3, NB/T 20003.4, NB/T 20003.7 and NB/T 20162. It is filed under Chinese classification F65 and international classification 27.120.20. Issued on 5 February 2016, it has applied since 1 July 2016.
Found what you need?
Document preview — NB/T 20376-2016
National Standard of the People's Republic of China
- ICS
- 27.120.20
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20376-2016 cites the following standards, which apply in full or in part through the references made to them in its clauses.
NB/T 20003.3
NB/T 20003.4
NB/T 20003.7
NB/T 20162
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- NB/T 20003.3Non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 3: Radiographic testing
- NB/T 20003.4Non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 4: Penetrant testing
- NB/T 20003.7Non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 7: Visual testing
- NB/T 20162Technical Requirements on the Cleaning Areas Establishment and Maintenance of PWR Nuclear Island Equipment During Storage, Installation and Start-up
Similar standards
How to Download NB/T 20376-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20003.3-2010 — Non - Destructive testing for mechanical components in nuclear island of nuclear power plants - Part 3: Radiographic testing
NB/T 20003.3-2021 — Non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 3: Radiographic testing
NB/T 20003.4-2010 — Non-destructive testing for mechanical components in nuclear island of nuclear power plants - Part 4: Penetrant testing
Secure payment via Stripe
Payments accepted
NB/T 20376-2016
$150.00