Valid

GB/T 35683-2017Specifications for steam turbines in conventional island of nuclear power plant (PWR) (English PDF)

核电厂常规岛(压水堆)汽轮机规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (17 pages)

Need quotation for your management?

Get a formal quotation for GB/T 35683-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

July 1, 2018

Scope

GB/T 35683-2017 is the English-translated version of 核电厂常规岛(压水堆)汽轮机规范.

GB/T 35683-2017 is the Chinese standard "Specifications for steam turbines in conventional island of nuclear power plant (PWR)". Its scope clause reads: This standard specifies the nuclear power plant conventional island (PWR) turbine equipment warranty value, regulation, operation and maintenance, parts and other requirements.

This standard applies to the rated power of 300MW and above conventional island nuclear power plant (pressurized water reactor) condensing steam turbine. Power is less than 300MW And non-condensable steam turbine nuclear power can refer to the implementation. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 35683-2017

National Standard of the People's Republic of China

ICS
27.040
Classification
K 54

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Guaranteed value
  • 5 adjustment
  • 6 operation and overhaul
  • 7 parts
  • 8 Foundations and buildings
  • 9 to the pump drive
  • 11 meter
  • 12 Protection System
  • 13 vibration
  • 14 noise
  • 15 Test
  • 16 Package Transportation and Installation
  • 18 Supplier should provide design information

1 Scope

This standard specifies the nuclear power plant conventional island (PWR) turbine equipment warranty value, regulation, operation and maintenance, parts and other requirements.

This standard applies to the rated power of 300MW and above conventional island nuclear power plant (pressurized water reactor) condensing steam turbine. Power is less than 300MW

And non-condensable steam turbine nuclear power can refer to the implementation.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 3785.1 Electroacoustic sound level meter Part 1. Specification

Specification for steam turbines for stationary power generation GB/T 5578-2007

GB/T 6075.1 Mechanical vibration - Measurement on non-rotating parts - Evaluation of machine vibration - Part 1. General

GB/T 6075.2 mechanical vibration measurement on non-rotating parts to evaluate the vibration of the machine Part 2. More than 50MW power,

Rated speed 1500r/min, 1800r/min, 3000r/min, 3600r/min Land-mounted turbines and generators

GB/T 7441 Turbine and driven machinery issued by the measurement of space noise

GB/T 8117.1 Turbine thermal performance acceptance test procedures Part 1. Method A large condensing steam turbine high accuracy test

GB/T 8117.2 Turbine thermal performance acceptance test procedures Part 2. Method B various types and sizes of turbine wide standard

Correct test

GB/T 11348.1 Rotating machinery - Measurement and assessment of radial vibration of shafts - Part 1. General

GB/T 11348.2 Mechanical vibration measurement on a rotating shaft Evaluation of machine vibration Part 2. Power greater than 50MW, rated

Working speed 1500r/min, 1800r/min, 3000r/min, 3600r/min Land-mounted steam turbine and generator

GB/T 22198 turbine speed control system acceptance test

3 Terms and definitions

GB/T 5578-2007 defined and the following terms and definitions apply to this document.

3.1 Nuclear Power Turbine

Using the steam generated at the nuclear island as a working fluid, the energy of the steam is converted into a rotary power machine that is a mechanical power.

3.2 The maximum calculation speed

It is assumed that the speed may occur when the governor fails and the maximum speed is limited only by the overspeed trip device.

3.3 Summer continuous running power summercontinuousrating; SCR

In the provisions of the summer back pressure, the rated new steam parameters, reheat steam parameters and the water supply conditions, does not exceed the specified life,

Continuous power emitted at the generator terminals.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

Similar standards

How to Download GB/T 35683-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 35683-2017

$295.00