NB/T 20370-2016Nuclear island general layout criteria for passive PWR nuclear power plant major systems (English PDF)
非能动压水堆核电厂核岛主要系统布置准则
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20370-2016 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
February 5, 2016
Implementation date
July 1, 2016
Scope
NB/T 20370-2016 is the English-translated version of 非能动压水堆核电厂核岛主要系统布置准则.
NB/T 20370-2016 is a recommended Chinese energy industry standard on the general layout of the nuclear island of a passive pressurized water reactor nuclear power plant.
It sets the overall technical requirements for arranging the major systems of that nuclear island, together with their equipment and their piping. Its field is the layout of the main systems of a passive plant's nuclear island, and the arrangement of the corresponding systems at other pressurized water reactor plants may follow it as a reference.
It quotes EJ/T 335, EJ/T 337, NB/T 20010.8, NB/T 20190, NB/T 20191, NB/T 20194, NB/T 20258.1, NB/T 20268 and NB/T 20273. Issued on 5 February 2016, it has applied since 1 July 2016.
Found what you need?
Document preview — NB/T 20370-2016
National Standard of the People's Republic of China
- ICS
- 27.120.20
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20370-2016 cites the following standards, which apply in full or in part through the references made to them in its clauses.
EJ/T 335
EJ/T 337
NB/T 20010.8
NB/T 20190
NB/T 20191
NB/T 20194
NB/T 20258.1
NB/T 20268
NB/T 20273
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- NB/T 20010.8PWR Nuclear Power Plant Valve - Part 8: Specification of Installation and Maintenance
- NB/T 20190Noise control in nuclear power plant production buildings
- NB/T 20191Accessibility Criteria for In-service Inspections in Structural Design of Pressurized Water Reactor Nuclear Power Plants
- NB/T 20194Design Criterion of Radiation Shield in the PWR Nuclear Power Plant
- NB/T 20258.1PWR nuclear power plant module design requirements - Part 1: Mechanical module
- NB/T 20268Rules for the design of safety and relief valve piping of PWR nuclear power plants
EJ/T 335 · EJ/T 337
Similar standards
How to Download NB/T 20370-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20010.8-2010 — PWR Nuclear Power Plant Valve - Part 8: Specification of Installation and Maintenance
NB/T 20190-2012 — Noise Control for Production Buildings of Nuclear Power Plants
NB/T 20190-2023 — Noise control in nuclear power plant production buildings
Secure payment via Stripe
Payments accepted
NB/T 20370-2016
$270.00