NB/T 20010.8-2010PWR Nuclear Power Plant Valve - Part 8: Specification of Installation and Maintenance (English PDF)
压水堆核电厂阀门 第8部分:安装和维修技术条件
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20010.8-2010 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
May 1, 2010
Implementation date
October 1, 2010
Scope
NB/T 20010.8-2010 is the English-translated version of 压水堆核电厂阀门 第8部分:安装和维修技术条件.
NB/T 20010.8-2010 is the Chinese energy industry standard governing the installation and maintenance of valves in pressurized water reactor nuclear power plants.
Part 8 of the NB/T 20010 series, it gives the technical requirements for installing, maintaining and inspecting nuclear safety-related valves, spare parts included.
Valves that are not of a nuclear class but are used in nuclear plants may follow the same installation and maintenance requirements by reference. It works alongside the standards it quotes, EJ/T 331-1992, EJ/T 454, NB/T 20010.9 and the regulatory guide HAD 003/07.
The standard takes the place of EJ/T 1022.8-1996. Issued on 1 May 2010, it has applied since 1 October 2010.
Found what you need?
Document preview — NB/T 20010.8-2010
National Standard of the People's Republic of China
- ICS
- 27.120.10
- Replacing
- EJ/T 1022.8-1996
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20010.8-2010 cites the following standards, which apply in full or in part through the references made to them in its clauses.
EJ/T 331-1992
EJ/T 454
NB/T 20010.9
HAD 003/07
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
EJ/T 331-1992 · EJ/T 454 · HAD 003/07
Similar standards
Editions of NB/T 20010.8
| Edition | Title | Revision | Status |
|---|---|---|---|
| NB/T 20010.8-2010 | PWR Nuclear Power Plant Valve - Part 8: Specification of Installation and Maintenance | current edition | Current |
| EJ/T 1022.8-1996 | PWR Nuclear Power Plant Valve - Part 8: Specification of Installation and Maintenance | previous edition | Superseded |
This page sells the current edition, NB/T 20010.8-2010. Earlier editions are listed for reference only.
How to Download NB/T 20010.8-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20010.9-2010 — PWR nuclear power plant valve - Part 9: Final inspection and test before shipment
NB/T 20010.7-2010 — PWR Nuclear Power Plant Valve - Part 7: Specification of Packaging, Transport and Storage
NB/T 20010.10-2010 — PWR Nuclear Power Plant Valve - Part 10: Stress Analysis and Seismic Analysis
Secure payment via Stripe
Payments accepted
NB/T 20010.8-2010
$165.00