NB/T 20358.8-2018Cost estimation of nuclear power plant construction project - Part 8: Automation control instrument installation engineering for nuclear island (English PDF)

核电厂建设工程预算定额 第8部分:核岛自动化控制仪表安装工程

Open the NB/T 20358.8-2018 preview as PDF

Preview — first pages of NB/T 20358.8-2018 (full document: 189 pages)

This is a limited preview

Buy now to download the full PDF (189 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

March 22, 2018

Implementation date

September 1, 2018

Scope

NB/T 20358.8-2018 is the English-translated version of 核电厂建设工程预算定额 第8部分:核岛自动化控制仪表安装工程.

NB/T 20358.8-2018 is Part 8 of the Chinese budget quota series for nuclear power plant construction, and it prices the installation of automation and control instrumentation in the nuclear island. It covers the instruments themselves - pressure, level, flow and temperature transmitters, thermocouples and resistance thermometers, radiation monitors, analysers and their sampling systems - together with the work that surrounds them: impulse lines and their fittings, instrument racks and cabinets, control panels, instrument cable trays, cable pulling and termination, tubing and its pressure testing, and the calibration and loop checking that closes the installation. Each quota item states the work content it includes, the unit it is measured in, the labour hours by trade, the machine-shift consumption and the material quantities with their waste allowances, so that a price can be built from measured quantities. The explanation at the front of the volume gives the scope of the quotas, the general provisions on what each rate already covers, the adjustment coefficients for working conditions such as radiation area and confined space, and the rules for measuring quantities; the chapter notes then add the conventions specific to each group of items. It replaces the 2015 edition, and is used by owners, contractors and cost consultants preparing budget estimates, tender prices and cost control baselines for nuclear power projects in China.

Document preview — NB/T 20358.8-2018

National Standard of the People's Republic of China

ICS
01.040.27
Classification
F02
Replacing
NB/T 20358.8-2015

Issued by: National Energy Administration of the PRC

Contents

  • Volume Explanation1
  • Chapter 1 Process Detection Instruments4
  • Chapter Explanation5
  • 1.1 Temperature Instruments7
  • 1.2 Pressure Instruments15
  • 1.3 Differential Pressure and Flow Instruments20
  • 1.3.1 Differential Pressure and Flow Instruments20
  • 1.3.2 Throttling Devices31
  • 1.4 Level Detection Instruments34
  • 1.5 Display Instruments45
  • 1.6 Dose Detection Instruments50
  • Chapter 2 Process Control Instruments61
  • Chapter Explanation62
  • 2.1 Electric Unit Assembly Instruments64
  • 2.1.1 Transmitting Units64
  • 2.1.2 Display Units68
  • 2.1.3 Regulating Units70
  • 2.1.4 Converting Units73
  • 2.1.5 Set Value Units75
  • 2.1.6 Auxiliary Units77
  • 2.2 Pneumatic Unit Assembly Instruments80
  • 2.2.1 Transmitting Units80
  • 2.2.2 Display Units84
  • 2.2.3 Regulating Units85
  • 2.2.4 Auxiliary Units87
  • 2.3 Modular Integrated Control Instruments93
  • 2.3.1 Input and Output Modules93
  • 2.3.2 Signal Processing Modules95
  • 2.3.3 Regulating Modules97
  • 2.3.4 Other Modules99
  • 2.3.5 Panel Mounted Instruments101
  • 2.4 Field Mounted Regulating Instruments103
  • 2.5 Actuating Instruments106
  • 2.5.1 Control Valves106
  • 2.5.2 Direct Acting Control Valves110
  • 2.5.3 Accessories of Actuating Instruments110
  • 2.6 Instrument Loop Simulation Tests115
  • 2.6.1 Detection Loops115
  • 2.6.2 Regulating Loops117
  • 2.6.3 Alarm Loops118
  • 2.7 Testing of Rod Control and Rod Position Coil Assemblies119
  • Chapter 3 Centralized Detection Devices and Instruments120
  • Chapter Explanation121
  • 3.1 Mechanical Quantity Instruments123
  • 3.1.1 Thickness and Width Measuring Devices123
  • 3.1.2 Rotating Machinery Detection Instruments125
  • 3.1.3 Weighing Devices and Belt Slip and Deviation Detection126
  • 3.2 Process Analysis and Physical Property Detection Instruments128
  • 3.2.1 Process Analysis Instruments128
  • 3.2.2 Physical Property Detection Instruments136
  • 3.2.3 Special Pretreatment Devices137
  • 3.2.4 Installation of Analyzer Cabinets, Analyzer Houses and Accessories139
  • 3.3 Meteorological and Environmental Protection Detection Instruments140
  • Chapter 4 Centralized Monitoring and Control Devices141
  • Chapter Explanation142
  • 4.1 Safety Monitoring Devices144
  • 4.2 Industrial Television146
  • 4.3 Telecontrol Devices150
  • 4.4 Sequence Control Devices152
  • 4.5 Signal Alarm Devices155
  • 4.6 Data Acquisition and Patrol Detection Alarm Devices161
  • Chapter 5 Industrial Computer Equipment Installation163
  • Chapter Explanation164
  • 5.1 Installation and Commissioning of Industrial Computer Equipment168
  • 5.1.1 Installation of Computer Cabinets and Console Equipment168
  • 5.1.2 Summary of External Equipment Installation170
  • 5.1.3 Installation and Commissioning of Auxiliary Storage Devices172
  • 5.2 Management Computer Commissioning173
  • 5.2.1 Process Control Management Computer Commissioning173
  • 5.2.2 Production and Business Management Computer Commissioning175
  • 5.2.3 Dual Machine Switchover and Network Equipment Commissioning177
  • 5.3 Basic Automation Device Commissioning179
  • 5.3.1 Distributed Control System (DCS) Commissioning179
  • 5.3.1.1 Small Scale DCS Installation and Commissioning179
  • 5.3.1.2 Medium Scale DCS Commissioning182
  • 5.3.1.3 Large Scale DCS Commissioning185
  • 5.3.2 Programmable Logic Controller (PLC) Commissioning190
  • 5.3.2.1 Small Scale PLC Commissioning190
  • 5.3.2.2 Medium Scale PLC Commissioning191
  • 5.3.2.3 Large Scale PLC Commissioning192
  • 5.3.3 Operator Stations and Data Communication Networks193
  • 5.3.4 Process IO Module Commissioning194
  • 5.3.5 Interface Commissioning with Other Equipment195
  • 5.3.6 Direct Digital Control (DDC) System Commissioning196
  • 5.3.7 Fieldbus Control System (FCS) Installation and Commissioning198
  • 5.3.7.1 Fieldbus and Operator Station Commissioning198
  • 5.3.7.2 Fieldbus Instrument Installation and Commissioning199
  • Chapter 6 Instrument Piping Laying, Heat Tracing and Degreasing201
  • Chapter Explanation202
  • 6.1 Steel Pipe Laying204
  • 6.2 Stainless Steel Pipe and High Pressure Pipe Laying206
  • 6.3 Non-ferrous Metal and Non-metallic Pipe Laying208
  • 6.4 Pipe Cable Laying211
  • 6.5 Heat Tracing of Instrument Equipment and Piping213
  • 6.6 Degreasing of Instrument Equipment and Piping216
  • Chapter 7 Installation of Instrument Panels, Boxes, Cabinets and Accessories218
  • Chapter Explanation219
  • 7.1 Installation of Panels, Boxes and Cabinets220
  • 7.2 Panel Wiring Check and Installation of On-panel Components and Accessories225
  • 7.2.1 Fabrication and Installation of Panel and Cabinet Accessories and Components225
  • 7.2.2 Panel and Cabinet Wiring229
  • 7.2.3 Installation and Wiring Check of Nuclear Grade Special Cable Connectors231
  • Chapter 8 Fabrication and Installation of Instrument Accessories233
  • Chapter Explanation234
  • 8.1 Instrument Valve Installation and Grinding235
  • 8.2 Fabrication and Installation of Auxiliary Vessels and Accessories239

Foreword

This document was issued on 22 March 2018 by the National Energy Administration of the PRC and takes effect on 1 September 2018.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 01.040.27, Chinese classification F02.

It replaces NB/T 20358.8-2015, which is superseded.

NB/T 20358 Cost estimation of nuclear power plant construction project, together with NB/T 20355 Cost quota for nuclear island civil and installation works of nuclear power plant construction project, NB/T 20356 Cost quota for conventional island civil and installation works of nuclear power plant construction project and NB/T 20357 Cost quota for construction machinery shift of nuclear power plant construction project, forms the series of nuclear power quota standards that support the budgeting and pricing of nuclear power construction works.

NB/T 20358 Cost estimation of nuclear power plant construction project currently consists of 16 parts, made up as follows:

Part 1: Nuclear island civil engineering;

Part 2: Nuclear island decoration engineering;

Part 3: Nuclear island steel structure engineering;

Part 4: Nuclear island process equipment installation engineering;

Part 5: Nuclear island process piping installation engineering;

Part 6: Nuclear island ventilation and air conditioning installation engineering;

Part 7: Nuclear island electrical equipment installation engineering;

Part 8: Nuclear island automation control instrument installation engineering;

Part 9: Nuclear island communication equipment installation engineering;

Part 10: Nuclear island anticorrosion and thermal insulation engineering;

Part 11: Conventional island civil engineering;

Part 12: Conventional island thermal equipment installation engineering;

Part 13: Conventional island electrical equipment installation engineering;

Part 14: Commissioning engineering;

Part 15: Fabrication of modules and steel containment vessel;

Part 16: Assembly and installation of modules and steel containment vessel.

This document is Part 8 of NB/T 20358-2018 Cost estimation of nuclear power plant construction project: Nuclear island automation control instrument installation engineering (hereinafter referred to as this part). It was issued by Announcement No. 2 of 2018 of the National Energy Administration; the date of approval is 22 March 2018 and the date of implementation is 1 September 2018.

This part was proposed by the Nuclear Power Standardization Technical Committee of the energy industry.

This part is under the jurisdiction of the Nuclear Industry Standardization Research Institute.

The main drafting organizations of this part are: China Nuclear Power Engineering Co., Ltd.; CGN Power Engineering Co., Ltd.; Electric Power Planning and Engineering Institute; China Nuclear Industry 23 Construction Co., Ltd.; China Nuclear Industry Huaxing Construction Co., Ltd.; China Nuclear Industry 22nd Construction Co., Ltd.

The main drafters of this part are: Fu Yi, Lai Xiaofeng, Wang Yi, Liu Bin, Qu Ju, Chen Xiangting, Xu Liang, Hu Jiang, Rong Mei, Lan Xiaohong, Li Qingmei, He Zhe, Kong Liang, Sheng Ke, Wei Yuchao, Wang Weiyang, Zhang Guolei, Fu Qingping.

1 Scope

NB/T 20358.8-2018 is Part 8 of the Chinese budget quota series for nuclear power plant construction, and it prices the installation of automation and control instrumentation in the nuclear island. It covers the instruments themselves - pressure, level, flow and temperature transmitters, thermocouples and resistance thermometers, radiation monitors, analysers and their sampling systems - together with the work that surrounds them: impulse lines and their fittings, instrument racks and cabinets, control panels, instrument cable trays, cable pulling and termination, tubing and its pressure testing, and the calibration and loop checking that closes the installation. Each quota item states the work content it includes, the unit it is measured in, the labour hours by trade, the machine-shift consumption and the material quantities with their waste allowances, so that a price can be built from measured quantities. The explanation at the front of the volume gives the scope of the quotas, the general provisions on what each rate already covers, the adjustment coefficients for working conditions such as radiation area and confined space, and the rules for measuring quantities; the chapter notes then add the conventions specific to each group of items. It replaces the 2015 edition, and is used by owners, contractors and cost consultants preparing budget estimates, tender prices and cost control baselines for nuclear power projects in China.

This part specifies the quotas for nuclear island automation control instrument installation engineering within the budget quota for nuclear power plant construction works.

This part applies to the nuclear island works of newly built, extended and reconstructed pressurized water reactor nuclear power units, and to those sub-items of the balance of plant (BOP) works that carry nuclear safety requirements: the nuclear island liquid waste storage tank building, the conventional island liquid waste storage tank building, the auxiliary building for the treatment of radioactive solid waste, the interim storage for solid waste, the radioactive machinery repair shop and the decontamination workshop.

Other nuclear reactor types and nuclear engineering projects may use this part for reference.

2 Volume Explanation: General Provisions

1. This part is applied in conjunction with the Cost quota for nuclear island civil and installation works of nuclear power plant construction project (NB/T 20355) and the Cost quota for construction machinery shift of nuclear power plant construction project (NB/T 20357).

2. This part is the basis for preparing construction drawing budgets, for project fund allocation and final settlement of completed works, for tendering and bidding, and for bill of quantities pricing; it is also the basis on which estimate quotas are compiled.

3. This part has been compiled for normal natural and environmental conditions, on the basis of construction organization design and construction machinery provision that are reasonable at the present stage, taking reasonable cross-trade operation into account, and on the basis of the relevant technical standards for pressurized water reactor nuclear power plants, the construction and acceptance codes, the quality outline, the safe operating procedures and the requirements for civilized construction on site and for environmental protection.

4. The labour, material and construction machinery consumption quantities in this part reflect the present technical and organizational level of nuclear power construction. Except where the quota expressly permits adjustment, the quotas shall not be adjusted on account of differences in construction organization, working methods or material loss.

5. Labour cost is governed as follows:

a) Man-days are expressed as composite man-days without distinction of trade or skill grade, and each composite man-day is based on an eight-hour working day.

b) The composite unit price is applied at a production worker wage of 135 yuan per man-day, which includes basic wage, wage subsidies, auxiliary wage, employee welfare cost and labour protection cost.

6. This part has been compiled for the following normal construction conditions:

a) Equipment, materials, finished and semi-finished products and structural members are complete and undamaged, conform to the quality standards and the design requirements, are accompanied by certificates of conformity and test records, and are supplied in a way that meets the installation schedule.

b) Cross-trade operation between the installation works and the civil works is normal, and the civil works do not affect the normal progress of the installation works.

c) The installation location, the buildings, the equipment foundations and the openings and holes left in advance all conform to the design standards and satisfy the installation requirements.

d) The site installation conditions conform to the design requirements and satisfy the technical conditions.

e) The water and power supply satisfy normal installation work.

f) The geographical environment and the climatic conditions do not affect the normal operation or the bodily health of the installation workers. Where construction takes place in a special environment, the cost shall be calculated separately in accordance with the relevant provisions.

7. Material cost is governed as follows:

a) Materials comprise the main materials, the auxiliary materials and the sundry materials directly consumed in the installation work content; the material consumption quantity comprises the quantity directly consumed in the installation work content, the spreading and laying quantity and the specified loss quantity.

b) Material loss comprises transport loss from the site warehouse, the site stacking area or the site processing point to the installation location, loss during construction operations and loss during stacking on the construction site.

c) For materials whose unit price is not included, the price is not contained in the base price; such materials shall be calculated at the actual price on the basis of the quantities listed.

d) Sundry materials of very small quantity and of very little influence on the base price are combined into the other material cost item and are listed and calculated with the yuan as unit within the material cost.

e) For the consumption rates of the main materials of installation works, see the individual quotas of Parts 4 to 10 of NB/T 20358 Cost estimation of nuclear power plant construction project.

f) Material unit prices are taken at material warehouse prices; the sum of the material transport miscellaneous cost, the transport loss cost and the procurement and custody cost rate is 2.5 percent.

8. The construction machinery usage cost is governed as follows:

a) The machinery usage cost in the quota is expressed by the machinery shift usage quantity.

b) The construction machinery in the quota has been determined comprehensively on the basis of normal and reasonable machinery provision and of the mechanization level of construction enterprises; where the actual situation does not agree with the quota, no adjustment is made unless a chapter provides otherwise.

c) The quota sub-items list only the consumption of the main equipment, machines, appliances and instruments; sundry machinery of very small quantity and of very little influence on the base price is combined into the other machinery cost item and listed and calculated with the yuan as unit within the machinery cost.

d) Tools and appliances with a unit value of 2000 yuan or less and a service life of two years or less, which do not constitute fixed assets, are not included in the quota; they are taken into account in the Cost quota for nuclear island civil and installation works of nuclear power plant construction project (NB/T 20355).

9. Horizontal and vertical transport is governed as follows:

a) Equipment: horizontal and vertical transport from the designated stacking point on the installation site to the installation location is included; the horizontal and vertical transport of large equipment is not included.

b) Materials, finished products and semi-finished products: horizontal and vertical transport from the site warehouse of the construction unit or from the designated stacking point to the installation location is included.

c) Datum plane for vertical transport: indoors, the indoor floor surface is the datum plane; outdoors, the ground surface of the installation site is the datum plane.

10. The following costs of this part are taken at the coefficients specified in Table 1.

Table 1 Cost taking coefficients. Item 1, scaffolding erection and dismantling cost, is broken down as follows, in every case calculated on the quota labour cost as calculation base: 1.1 nuclear island mechanical equipment installation engineering, coefficient 15 percent, of which labour cost 35 percent; 1.2 nuclear island piping installation engineering, coefficient 10 percent, of which labour cost 55 percent; 1.3 nuclear island ventilation and air conditioning engineering, coefficient 10 percent, of which labour cost 55 percent; 1.4 nuclear island electrical equipment installation engineering, coefficient 15 percent, of which labour cost 35 percent; 1.5 nuclear island automation control instrument installation engineering, coefficient 15 percent, of which labour cost 35 percent; 1.6 nuclear island communication equipment installation engineering, coefficient 15 percent, of which labour cost 35 percent; 1.7 nuclear island sand blasting, anticorrosion and thermal insulation engineering, coefficient 20 percent, of which labour cost 25 percent.

Table 1, item 2: additional cost for reduced efficiency where installation is carried out at the same time as production, calculation base quota labour cost, coefficient 10 percent, of which labour cost 100 percent.

Table 1, item 3: additional cost for reduced efficiency where construction is carried out in an environment harmful to bodily health, calculation base quota labour cost, coefficient 10 percent, of which labour cost 100 percent.

11. Unless otherwise stated in the individual parts and chapters, the following items are not included:

1) The cost of assisting in the single machine test run and in the interlocked test run of key equipment.

2) The cost of single machine functional testing.

3) The electricity, steam, industrial water, circulating water, demineralized water, compressed air, nitrogen, lubricating oil or grease, feedstock and so on required for a single machine test run.

4) Off-site transport of equipment, materials, finished products and semi-finished products.

5) Labour, material and machinery costs added beyond the codes.

6) Work on equipment, structural members and the like that do not conform to the design requirements.

7) The cost of moving large machinery in and out of the site, and its usage and standby shift cost.

8) The cost of special labour protection articles required by the special nature of the works.

9) The cost of special health protection required by the special nature of the works.

10) The cost of special technical measures required by the special nature of the works.

12. Where this part carries the wording within XX or XX and below, XX itself is included; where it carries the wording outside XX or XX and above, XX itself is not included.

13. For matters not exhausted by this part, see the explanations of the individual parts and chapters.

3 Volume Explanation: Special Provisions

1. This part applies to the installation and commissioning works of automation control devices and instruments in nuclear power plant projects, or in other newly built, extended and reconstructed projects related to nuclear energy.

2. The instrument calibration material cost of this part includes the consumable materials used for calibration and the loss of the calibration materials.

3. The following contents are executed at the corresponding items of other parts:

a) Flowmeters, control valves, solenoid valves and throttling devices installed on piping, and the tapping and welded parts on piping, shall be executed at the corresponding items of Cost estimation of nuclear power plant construction project, Part 5: Nuclear island process piping installation engineering.

b) Control cable laying, electrical conduit installation, bracket fabrication and installation, cable tray installation, fabrication and installation of the foundations of panels and cabinets, earthing and earthing resistance testing shall be executed at the corresponding items of Cost estimation of nuclear power plant construction project, Part 7: Nuclear island electrical equipment installation engineering.

c) Where cable trays, brackets, columns, partition plates, cover plates, supporting and hanging frames, instrument stands, wall penetration sealing frames and perforated plates or channels are purchased as finished products, their installation shall be executed at the general ironwork installation quota of Cost estimation of nuclear power plant construction project, Part 7: Nuclear island electrical equipment installation engineering; where they have to be fabricated, the general ironwork fabrication quota of that Part 7 shall be executed.

d) High strength bolts shall be executed at the corresponding items of Cost estimation of nuclear power plant construction project, Part 7: Nuclear island electrical equipment installation engineering.

e) Oil painting, thermal insulation, sand blasting, anticorrosion, touch-up painting and non-destructive examination shall be executed at the corresponding items of Cost estimation of nuclear power plant construction project, Part 10: Nuclear island anticorrosion and thermal insulation engineering.

f) Concrete foundations shall be executed at the corresponding items of the civil engineering quota.

4. Other: additional cost for excessive height. For the installation of instruments where the height of the operated object above the floor is 5 m or more and below 20 m, the additional cost is calculated at 33 percent of the labour cost of the excessively high portion, of which the labour cost is 100 percent.

4 Chapter 1 Process Detection Instruments: Chapter Explanation

1. Scope of application of this chapter: the installation and individual commissioning of temperature, pressure, flow, differential pressure, throttling device, level, display and dose detection instruments.

2. This chapter covers the following work content: preparation; drawing of materials; handling; cleaning up; washing; custody, supply and cleaning of tapping parts; installation of instrument connections; individual instrument commissioning, installation, wiring check, hanging of position tags; and compilation of installation and commissioning records.

The following contents are also covered:

1. Panel drilling for panel mounted instruments.

2. Installation of the temperature bulb of pressure type thermometers and laying and fixing of the capillary tube.

3. Installation, adjustment and leak testing of steel tape level transmitters, counterweights, protective covers, floats, steel tapes, guide tubes and protective sleeves.

4. Storage tank level weighing instruments: installation of the bell jar, installation of the weighing instrument and installation and pressure testing of the pressure lead-in pipe.

5. Throttling devices: inspection of roundness and concentricity, orifice plate flow direction, determination of the position of the positive pressure chamber, cleaning of the annular chamber holes, assistance with the primary installation, cleaning of the annular chamber and installation of the orifice plate after the piping has been blown through, and fabrication of the primary gaskets.

6. Counterweight sounding level indicators: installation of the actuator, the magnetic starter, the pulleys and the pulley support, the counterweight and the steel wire rope.

7. Float type level indicators: installation of the steel wire rope, the float and the pulleys.

8. Assistance in the installation of flowmeters on process piping and commissioning of the flow conversion, amplification, remote transmission and display parts.

9. Insertion type instruments installed on process piping.

10. Installation, inspection and wiring of programmable radar level gauges and of temperature and pressure compensation systems.

11. Assistance in the installation of the radiation source of radioactive instruments, installation of the radiation source protective tube, safety protection and mock-up installation.

12. Installation of dose instruments and instrument protection.

3. Contents not covered:

1. Fabrication and installation of brackets and supports.

2. Equipment tapping, welding of flanges, cutting and tapping of industrial piping, flange welding and short pipe welding.

3. Installation of tapping parts, primary installation of throttling devices and fabrication of the primary gaskets.

4. Preparation and configuration of the flowmeter calibration device, and the machinery shift cost of the calibration instruments supplied with it.

5. Interlocked test run with no load or with load.

4. Other:

1. Assistance in the installation of tapping parts is executed at the relevant items of this part; if they are installed by the contractor itself, the relevant items of Cost estimation of nuclear power plant construction project, Part 5: Nuclear island process piping installation engineering are executed.

2. Where insertion type instruments are installed on process equipment or on piping, the flange or socket shall be left in advance or shall be properly welded, and the bolts shall be correctly matched and complete.

3. The gaskets used for instrument installation are considered as asbestos rubber gaskets; where the actual situation differs, conversion is permitted.

5. Rules for the calculation of quantities:

1. The installation and individual commissioning of detection instruments and control instruments covers temperature, pressure, flow, differential pressure, level, display, dose detection, combined, regulating and actuating instruments. Dose detection instruments are measured by the set, while all other instruments are measured by the unit or piece. Amplifiers, filters and similar elements and parts that come as a set with the instrument are part of the instrument, and their quantity shall not be calculated separately. (Installation of a core melt thermocouple includes unpacking inspection, mock-up thermocouple installation, nuclear grade lubrication of the oil, insulation resistance and direct current resistance testing of the thermocouple before installation, installation of the thermocouple and of the Swagelok connection, and inspection and testing after installation, including measurement of the thermocouple length.)

2. The instrument mounting holes on process equipment and on piping and the installation of primary parts are considered as left in advance or as already installed and accepted; the quota already includes the work content of supplying the parts, assisting with the tapping and assisting with the installation, and such quantities shall not be calculated separately.

3. For throttling devices installed on piping, only the quantity of the primary installation is calculated, and it includes the fabrication and installation of the primary flange gasket.

4. Where flowmeters, control valves, solenoid valves, throttling devices and the like are installed on process piping, the automatic control instrument trade assists the piping trade with the installation; the work of receiving and transporting, cleaning and safekeeping is already included in the corresponding items of the automatic control instrument quota. Instrument dedicated flange welding and solenoid valve installation not on process piping or on equipment fall within the scope of instrument installation and the corresponding quota shall be executed.

5. For radioactive instruments, the installation and commissioning carried out with the assistance of the construction personnel of the trades concerned, including installation of the protective tube, safety protection and mock-up installation, is measured by the set. The radiation source protective tube and the special measure cost of the installation are calculated separately according to the construction organization design.

6. The installation of steel tape level gauges, storage tank level weighing instruments, counterweight sounding level indicators and float type level gauges is considered as a complete set and is measured by the unit; it includes the guide tube, the pulleys, the float, the steel tape, the steel wire rope, the bell jar and so on.

7. The installation of dose detection instruments is measured by the set. (The installation content of an accelerometer covers unpacking inspection, insulation resistance, direct current resistance and capacitance testing before and after installation, and installation of the adapter; the installation of the accelerometer does not include the laying and fixing of the integrated cable. The installation of a counter tube or an ionization chamber covers unpacking inspection and insulation testing; it does not include the installation, hoisting or positioning of the connection plate, nor the laying and fixing of the integrated cable.)

8. Instrument installation does not include the fabrication and installation of brackets and supports; the fabrication and installation of brackets and supports is calculated separately with 100 kg as unit.

9. The installation of amplifiers supplied as a set with the instrument is already contained in the installation of the instrument set, and the quantity shall not be calculated a second time.

5 1.1 Temperature Instruments: Quota Sub-items

Work content of the temperature instrument quotas: cleaning up, meter calibration, installation, fixing and hanging of the tag plate. Unit of measurement: piece. The composite man-day for installation is priced at 135.00 yuan per man-day throughout.

Quota numbers 8-1-1 and 8-1-2, expansion type thermometers, respectively an industrial liquid thermometer and a bimetallic thermometer. Base price 87.89 yuan and 142.90 yuan; of which labour cost 85.32 yuan and 135.81 yuan, material cost 2.57 yuan and 5.19 yuan, machinery cost none and 1.90 yuan.

Consumption for 8-1-1 and 8-1-2: composite man-day for installation 0.632 and 1.006 man-days; unpriced material, socket with thread plug, 1.000 set in both cases.

Priced materials for 8-1-1 and 8-1-2: white cloth, unit price 3.83 yuan per m, none and 0.050 m; gasket, unit price 0.11 yuan each, 1.000 and 1.000; tag plate, unit price 2.37 yuan each, 1.000 and 1.000; calibration material cost, unit price 0.86 yuan, none and 2.825; other material cost, unit price 1.00 yuan, 0.100 and 0.110.

Machinery for 8-1-1 and 8-1-2: electric integrated calibration bench, unit price 19.25 yuan per machine shift, none and 0.020; temperature calibration furnace (integrated), unit price 70.86 yuan per machine shift, none and 0.020; other machinery cost, unit price 1.00 yuan, none and 0.100.

Quota numbers 8-1-3 to 8-1-6, pressure type thermometer, controller or control switch, graded by capillary tube length in m and below: 10, 20, 40 and 60. Base price 394.94, 456.37, 542.99 and 729.62 yuan.

Of which, for 8-1-3 to 8-1-6: labour cost 360.45, 418.64, 500.58 and 680.00 yuan; material cost 20.12, 23.36, 28.04 and 35.25 yuan; machinery cost 14.37 yuan in all four cases.

Labour for 8-1-3 to 8-1-6: composite man-day for installation 2.670, 3.101, 3.708 and 5.037 man-days. Unpriced material: socket with thread plug, 1.000 set in each case.

Priced materials for 8-1-3 to 8-1-6: white cloth, 3.83 yuan per m, 0.050, 0.100, 0.150 and 0.200 m; half round head galvanized bolt M2 to 5 by 15 to 50, 3.42 yuan per set, 2.000 sets in each case; gasoline 93 number, 6.33 yuan per kg, 0.100, 0.200, 0.250 and 0.300 kg.

Further priced materials for 8-1-3 to 8-1-6: galvanized pipe clamp of diameter 50 and below, 1.28 yuan each, 1.000 in each case; gasket, 0.11 yuan each, 1.000 in each case; nylon cable tie, composite, 0.12 yuan each, 6.000, 12.000, 24.000 and 40.000; tag plate, 2.37 yuan each, 1.000 in each case; calibration material cost, 0.86 yuan, 8.484, 10.059, 12.498 and 17.085; other material cost, 1.00 yuan, 0.730, 1.070, 1.720 and 2.590.

Machinery for 8-1-3 to 8-1-6: electric integrated calibration bench, 19.25 yuan per machine shift, 0.060 in each case; temperature calibration furnace (integrated), 70.86 yuan per machine shift, 0.180 in each case; other machinery cost, 1.00 yuan, 0.460 in each case.

Quota numbers 8-1-7 and 8-1-8, respectively a temperature controller and a photoelectric colour ratio radiation temperature sensing thermometer. Base price 185.87 yuan and 369.69 yuan; of which labour cost 167.40 yuan and 334.80 yuan, material cost 5.94 yuan and 34.89 yuan, machinery cost 12.53 yuan and none.

Labour for 8-1-7 and 8-1-8: composite man-day for installation 1.240 and 2.480 man-days.

Priced materials for 8-1-7 and 8-1-8: cotton yarn, 5.39 yuan per kg, none and 0.100 kg; white cloth, 3.83 yuan per m, 0.050 m and none; half round head galvanized bolt M2 to 5 by 15 to 50, 3.42 yuan per set, none and 4.000 sets; finished bolt M12 by 20 to 100, 2.56 yuan per set, none and 4.000 sets; electricity, 0.84 yuan per kWh, none and 0.600 kWh.

Further priced materials for 8-1-7 and 8-1-8: tag plate, 2.37 yuan each, 1.000 and 1.000; calibration material cost, 0.86 yuan, 3.852 and 7.698; other material cost, 1.00 yuan, 0.080 and 0.960.

Machinery for 8-1-7 and 8-1-8: digital multimeter PF-56, 10.96 yuan per machine shift, 0.120 and none; electric integrated calibration bench, 19.25 yuan per machine shift, 0.120 and none; temperature calibration furnace (integrated), 70.86 yuan per machine shift, 0.120 and none; other machinery cost, 1.00 yuan, 0.400 and none.

Quota numbers 8-1-13 to 8-1-16, thermocouples and resistance thermometers, respectively an oil tank average thermometer, a surface thermometer, a wear resistant type and an air blowing type. Base price 316.63, 119.37, 194.56 and 317.99 yuan.

Of which, for 8-1-13 to 8-1-16: labour cost 291.33, 112.73, 186.44 and 307.67 yuan; material cost 19.35, 4.66, 6.03 and 8.23 yuan; machinery cost 5.95, 1.98, 2.09 and 2.09 yuan.

Labour for 8-1-13 to 8-1-16: composite man-day for installation 2.158, 0.835, 1.381 and 2.279 man-days. Unpriced material: socket with thread plug, none, none, 1.000 set and 1.000 set.

Priced materials for 8-1-13 to 8-1-16: white cloth, 3.83 yuan per m, 0.150, 0.050, 0.050 and 0.100 m; half round head galvanized bolt M2 to 5 by 15 to 50, 3.42 yuan per set, 3.000 sets and none in the other three cases; gasket, 0.11 yuan each, none, none, 1.000 and 1.000; plastic adhesive tape, 0.51 yuan per m, 0.300 m and none in the other three cases.

Further priced materials for 8-1-13 to 8-1-16: tag plate, 2.37 yuan each, 1.000 in each case; calibration material cost, 0.86 yuan, 6.462, 2.354, 3.804 and 6.142; other material cost, 1.00 yuan, 0.470, 0.080, 0.110 and 0.120.

Machinery for 8-1-13 to 8-1-16: precision thermocouple, 25.12 yuan per machine shift, 0.060, 0.020, 0.020 and 0.020; intercom C15, 10.29 yuan per machine shift, none, none, 0.010 and 0.010; temperature calibration furnace (integrated), 70.86 yuan per machine shift, 0.060, 0.020, 0.020 and 0.020; other machinery cost, 1.00 yuan, 0.190, 0.060, 0.070 and 0.070.

6 Structure of the Volume

The body of this part is organized as eight chapters of quota tables, each of them opened by a chapter explanation that states the scope of application, the work content covered and not covered, and the rules for the calculation of quantities.

Chapter 1, Process detection instruments, covers temperature instruments, pressure instruments, differential pressure and flow instruments including throttling devices, level detection instruments, display instruments and dose detection instruments.

Chapter 2, Process control instruments, covers electric and pneumatic unit assembly instruments, modular integrated control instruments, field mounted regulating instruments, actuating instruments including control valves, instrument loop simulation tests and the testing of rod control and rod position coil assemblies.

Chapter 3, Centralized detection devices and instruments, covers mechanical quantity instruments, process analysis and physical property detection instruments with their special pretreatment devices, analyzer cabinets and houses, and meteorological and environmental protection detection instruments.

Chapter 4, Centralized monitoring and control devices, covers safety monitoring devices, industrial television, telecontrol devices, sequence control devices, signal alarm devices and data acquisition and patrol detection alarm devices.

Chapter 5, Industrial computer equipment installation, covers the installation and commissioning of industrial computer equipment, management computer commissioning, and the commissioning of basic automation devices including distributed control systems, programmable logic controllers, direct digital control systems and fieldbus control systems, each graded by small, medium and large scale.

Chapter 6, Instrument piping laying, heat tracing and degreasing, covers steel pipe laying, stainless steel and high pressure pipe laying, non-ferrous metal and non-metallic pipe laying, pipe cable laying, and heat tracing and degreasing of instrument equipment and piping.

Chapter 7, Installation of instrument panels, boxes, cabinets and accessories, covers the installation of panels, boxes and cabinets, panel wiring check, the fabrication and installation of on-panel components and accessories, panel and cabinet wiring, and the installation and wiring check of nuclear grade special cable connectors.

Chapter 8, Fabrication and installation of instrument accessories, covers instrument valve installation and grinding and the fabrication and installation of auxiliary vessels and accessories.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 189 pages — is available in the English PDF.

Similar standards

Editions of NB/T 20358.8

EditionTitleRevisionStatus
NB/T 20358.8-2018Cost estimation of nuclear power plant construction project - Part 8: Automation control instrument installation engineering for nuclear islandcurrent editionCurrent
NB/T 20358.8-2015Cost estimation of nuclear power plant construction project - Part 8: Automation control instrument installation engineering for nuclear islandprevious editionIn force until 2018-09-01

This page sells the current edition, NB/T 20358.8-2018. Earlier editions are listed for reference only.

How to Buy NB/T 20358.8-2018

  1. 1Add to cart. Click the "Buy NB/T 20358.8-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
189 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20358.8-2018

$3,395.00

$2,885.00for partners