NB/T 20358.7-2018Cost estimation of nuclear power plant construction project - Part 7: Electrical equipment installation engineering for nuclear island (English PDF)

核电厂建设工程预算定额 第7部分:核岛电气设备安装工程

Open the NB/T 20358.7-2018 preview as PDF

Preview — first pages of NB/T 20358.7-2018 (full document: 368 pages)

This is a limited preview

Buy now to download the full PDF (368 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

March 22, 2018

Implementation date

September 1, 2018

Scope

NB/T 20358.7-2018 is the English-translated version of 核电厂建设工程预算定额 第7部分:核岛电气设备安装工程.

NB/T 20358.7-2018 is Part 7 of the Chinese budget quota series for nuclear power plant construction, and it prices the installation of electrical equipment inside the nuclear island. A budget quota is not a technical specification: it is the official book of unit rates that tells an estimator how much labour, machinery and consumable material a defined unit of work consumes, and it is what a Chinese reviewer checks a submitted price against. This part covers diesel generators and generator sets, transformers, switchgear and distribution boards, motors, batteries and their racks, cable trays and conduit, power and control cable pulling and termination, earthing and lightning protection, lighting, and the electrical penetrations through the containment. Each quota item states the work content it includes, the unit it is measured in, the labour hours by trade, the machine-shift consumption by equipment type, and the material quantities with their waste allowances. The explanation at the front of the volume - the part every estimator reads first - sets out the scope of the quotas, the general provisions on how they are applied and what each rate already includes, the adjustment coefficients for working conditions such as height, radiation area and confined space, the material waste rates, and the rules for measuring quantities. It replaces the 2015 edition. Owners, contractors and cost consultants use it to build budget estimates, tender prices and cost control baselines for nuclear projects in China.

Document preview — NB/T 20358.7-2018

National Standard of the People's Republic of China

ICS
01.040.27
Classification
F02
Replacing
NB/T 20358.7-2015

Issued by: National Energy Administration of the PRC

Contents

  • Volume Explanation1
  • Chapter 1 Diesel engines and generators6
  • Chapter explanation7
  • 1.1 Diesel engine installation8
  • 1.2 Diesel generator set installation10
  • 1.3 Motor and motor-generator set installation13
  • Chapter 2 Transformers18
  • 2.1 Oil-immersed power transformer installation20
  • 2.2 Dry-type transformer installation23
  • 2.3 Arc-suppression coil installation25
  • 2.4 Power transformer drying27
  • 2.5 Transformer oil filtering29
  • Chapter 3 Distribution equipment30
  • 3.1 Oil circuit breaker installation32
  • 3.2 Vacuum circuit breaker and SF6 circuit breaker installation33
  • 3.4 Isolating switch and load switch installation36
  • 3.5 Instrument transformer installation38
  • 3.9 Power capacitor installation45
  • 3.11 High-voltage packaged distribution cabinet installation49
  • 3.12 Combined packaged box-type substation installation51
  • Chapter 4 Busbars and insulators53
  • 4.1 Insulator installation56
  • 4.6 Strip busbar installation64
  • 4.9 Channel-type busbar installation79
  • 4.12 Low-voltage enclosed plug-in busbar trunking installation86
  • 4.13 Heavy-duty busbar installation89
  • Chapter 5 Control equipment and low-voltage apparatus95
  • 5.1 Control, relay, simulation and distribution panel installation98
  • 5.7 Uninterruptible power supply installation108
  • 5.8 Control switch installation109
  • 5.15 Panel and cabinet wiring124
  • Chapter 6 Storage batteries137
  • 6.2 Fixed sealed lead-acid battery installation141
  • 6.4 Battery charging and discharging147
  • Chapter 7 Motors150
  • 7.1 Generator and phase modifier check and wiring152
  • 7.7 Large and medium motor check and wiring159
  • 7.11 Large and medium motor drying163
  • Chapter 8 Trolley wire devices164
  • 8.5 Trolley wire bracket installation173
  • Chapter 9 Cables178
  • 9.4 Cable tray installation188
  • 9.8 Cable fireproof coating, hole sealing, barrier and flame-retardant trunking installation207
  • 9.16 Nuclear-grade indoor heat-shrinkable power cable termination fabrication and installation222
  • 9.19 Nuclear-grade control cable termination fabrication and installation230
  • 9.23 Cable tray fire protection238
  • Chapter 10 Lightning protection and earthing devices240
  • 10.1 Earthing electrode (plate) fabrication and installation243
  • 10.4 Lightning rod fabrication and installation257
  • 10.7 Lightning protection mesh installation271
  • Chapter 11 Electrical adjustment tests276
  • 11.1 Generator and phase modifier system commissioning280
  • 11.2 Power transformer system commissioning281
  • 11.6 Central signalling device, emergency lighting transfer device and uninterruptible power supply commissioning289
  • 11.18 Insulator, bushing, insulating oil and cable tests320
  • Chapter 12 Conduit and wiring322
  • 12.1 Electrical conduit laying325
  • 12.2 Steel conduit laying332
  • 12.3 Explosion-proof steel conduit laying344
  • 12.4 Plastic conduit laying354
  • 12.7 Wire pulling in conduit380
  • 12.9 Trunking wiring391
  • 12.14 Junction box installation402
  • Chapter 13 Lighting fixtures405
  • 13.1 Ordinary luminaire installation409
  • 13.3 Fluorescent luminaire installation416
  • 13.7 Switch, push-button and socket installation430
  • 13.8 Safety transformer, electric bell and fan installation448
  • Chapter 14 Electrical penetration assembly installation455
  • 14.1 Control and measurement electrical penetration assembly installation457
  • 14.2 Medium-voltage electrical penetration assembly installation459
  • 14.3 Personnel airlock electrical penetration assembly installation461

Foreword

This document was issued on 22 March 2018 by the National Energy Administration of the PRC and takes effect on 1 September 2018.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 01.040.27, Chinese classification F02.

It replaces NB/T 20358.7-2015, which is superseded.

NB/T 20358 Cost estimation of nuclear power plant construction project, together with NB/T 20355 Cost quotas for nuclear island civil and installation works of nuclear power plant construction projects, NB/T 20356 Cost quotas for conventional island civil and installation works of nuclear power plant construction projects and NB/T 20357 Machine-shift cost quotas for nuclear power plant construction projects, makes up the series of nuclear power quota standards that support budgeting and pricing of nuclear power construction works.

NB/T 20358 Cost estimation of nuclear power plant construction project at present comprises 16 parts, made up as follows:

Part 1: Civil engineering for nuclear island;

Part 2: Decoration engineering for nuclear island;

Part 3: Steel structure engineering for nuclear island;

Part 4: Process equipment installation engineering for nuclear island;

Part 5: Process piping installation engineering for nuclear island;

Part 6: Ventilation and air conditioning installation engineering for nuclear island;

Part 7: Electrical equipment installation engineering for nuclear island;

Part 8: Automation control instrumentation installation engineering for nuclear island;

Part 9: Communication equipment installation engineering for nuclear island;

Part 10: Anticorrosion and thermal insulation engineering for nuclear island;

Part 11: Civil engineering for conventional island;

Part 12: Thermal equipment installation engineering for conventional island;

Part 13: Electrical equipment installation engineering for conventional island;

Part 14: Commissioning engineering;

Part 15: Fabrication of modules and steel containment;

Part 16: Assembly and erection of modules and steel containment.

This part is Part 7: Electrical equipment installation engineering for nuclear island of NB/T 20358 Cost estimation of nuclear power plant construction project (hereinafter referred to as this part). It was released by Announcement No. 2 of 2018 of the National Energy Administration, approved on 22 March 2018 and put into effect on 1 September 2018.

This part was proposed by the Nuclear Power Standardization Technical Committee of the energy industry.

This part is under the jurisdiction of the Nuclear Industry Standardization Research Institute.

Main drafting organizations of this part: China Nuclear Power Engineering Co., Ltd.; CGN Nuclear Power Engineering Co., Ltd.; China Power Engineering Consulting Group Corporation; China Nuclear Industry 23 Construction Co., Ltd.; China Nuclear Industry Huaxing Construction Co., Ltd.; China Nuclear Industry 22nd Construction Co., Ltd.

Main drafters of this part: Xu Liang, Qu Jun, Chen Xiangting, Hu Jiang, Rong Mei, Lan Xiaohong, Wang Yi, Fu Yi, Liu Bin, Lai Xiaofeng, He Jie, Li Qingmei, Kong Liang, Yang Wenrong, Yao Yongchun, Fu Jungui, Wang Gang, Mao Lijun, Wang Rong.

1 Scope

NB/T 20358.7-2018 is Part 7 of the Chinese budget quota series for nuclear power plant construction, and it prices the installation of electrical equipment inside the nuclear island. A budget quota is not a technical specification: it is the official book of unit rates that tells an estimator how much labour, machinery and consumable material a defined unit of work consumes, and it is what a Chinese reviewer checks a submitted price against. This part covers diesel generators and generator sets, transformers, switchgear and distribution boards, motors, batteries and their racks, cable trays and conduit, power and control cable pulling and termination, earthing and lightning protection, lighting, and the electrical penetrations through the containment. Each quota item states the work content it includes, the unit it is measured in, the labour hours by trade, the machine-shift consumption by equipment type, and the material quantities with their waste allowances. The explanation at the front of the volume - the part every estimator reads first - sets out the scope of the quotas, the general provisions on how they are applied and what each rate already includes, the adjustment coefficients for working conditions such as height, radiation area and confined space, the material waste rates, and the rules for measuring quantities. It replaces the 2015 edition. Owners, contractors and cost consultants use it to build budget estimates, tender prices and cost control baselines for nuclear projects in China.

This part specifies the quotas for electrical equipment installation engineering of the nuclear island within the budget cost quotas for nuclear power plant construction projects.

This part applies to the nuclear island engineering of new-build and extension projects of pressurized water reactor nuclear power units, and to those sub-items of the BOP engineering that carry nuclear safety requirements, namely the nuclear island waste liquid storage tank building, the conventional island waste liquid storage tank building, the auxiliary building for solid radioactive waste treatment, the interim storage building for solid waste, the radioactive maintenance workshop and the vehicle decontamination workshop. Other nuclear power plant types and nuclear engineering projects may use it for reference.

2 Volume Explanation - General Provisions

1. This part is to be applied together with NB/T 20355 Cost quotas for nuclear island civil and installation works of nuclear power plant construction projects and NB/T 20357 Machine-shift cost quotas for nuclear power plant construction projects.

2. This part is the basis for preparing construction drawing budgets, for making engineering payments and completion settlements, for tendering and bidding and for bill-of-quantities pricing; it is also the basis on which preliminary estimate quotas are compiled.

3. This part has been compiled for normal natural and environmental conditions, on the basis of the construction organization design and the construction machinery allocation reasonable at the present stage, with reasonable cross-trade working taken into account, and in accordance with the relevant technical standards for pressurized water reactor nuclear power plants, the construction and acceptance codes, the quality assurance outline and safe operating procedures, and the requirements for civilized and safe construction and for environmental protection on site.

4. The labour, material and construction machinery consumptions given in this part reflect the technical and organizational level of nuclear power plant construction at the present stage. Except where the quota expressly permits adjustment, no quota may be adjusted on account of differences in construction organization, working method or material wastage on a particular project.

5. The labour cost of this part is laid down as follows:

a) Labour is expressed in composite man-days, without distinction of trade or skill grade, each composite man-day being taken on an eight-hour working day basis.

b) The composite unit rate is applied at a production worker wage of 135 yuan per man-day, which covers basic wages, wage supplements, auxiliary wages, employee welfare charges and labour protection charges.

6. This part has been compiled for the following normal construction conditions:

a) Equipment, materials, finished and semi-finished products and components are complete and undamaged, comply with the quality standards and the design requirements, are accompanied by certificates of conformity and test records, and are delivered in step with the installation programme.

b) Cross-trade working between the installation works and the civil works is normal, and the civil works do not disturb the normal progress of the installation works.

c) The installation location, the buildings, the equipment foundations and the openings and holes left in advance all comply with the design standards and meet the installation requirements.

d) The site installation conditions comply with the design requirements and satisfy the technical conditions.

e) The water and power supplies satisfy normal installation work.

f) The geographical environment and the climatic conditions do not affect the normal work or the physical health of the installation workers. Where construction takes place in a special environment, the cost is to be calculated separately in accordance with the relevant provisions.

7. The material cost of this part is laid down as follows:

a) Materials comprise the main materials, auxiliary materials and sundry materials directly consumed in the installation work content; the material consumption comprises the quantity directly consumed in the installation work content, the quantity amortized and the prescribed wastage.

b) Material wastage comprises transport wastage from the site store, the site stacking area or the site fabrication area to the point of installation, wastage in installation operations, and wastage in stacking on the construction site.

c) Materials for which no unit price is stated are main materials whose price is not included in the base price; they are to be calculated at actual prices on the basis of the quantities listed.

d) Sundry materials used in very small quantities and having little influence on the base price are combined as other material cost and entered in the material cost calculated in yuan.

e) For the consumption rates of the main materials of installation works, see the individual quotas of Part 4 to Part 10 of NB/T 20358 Cost estimation of nuclear power plant construction project.

f) Material unit prices are taken at material store prices; the material handling charges, the transport wastage charges and the procurement and storage charges together are taken at a rate of 2.5 per cent.

8. The construction machinery use cost of this part is laid down as follows:

a) The construction machinery use cost in the quotas is expressed as machine-shift usage.

b) The construction machinery in the quotas has been determined on a composite basis according to normal and reasonable machinery allocation and the level of mechanical equipment of construction enterprises; where actual conditions differ from the quota, no adjustment is made unless otherwise stated in the individual chapters.

c) The quota items list only the consumption of the main plant, machines, instruments and gauges; sundry machinery used in very small quantities and having little influence on the base price is combined as other machinery cost and entered in the machinery cost calculated in yuan.

d) Tools and appliances with a unit value of 2000 yuan or less and a service life of two years or less, which do not constitute fixed assets, are not included in the quotas; they are accounted for in NB/T 20355 Cost quotas for nuclear island civil and installation works of nuclear power plant construction projects.

9. Horizontal and vertical transport is laid down as follows:

a) Equipment: horizontal and vertical transport from the designated stacking point on the installation site to the point of installation is included; horizontal and vertical transport of large equipment is not included.

b) Materials, finished products and semi-finished products: horizontal and vertical transport from the site store of the construction unit or from the designated stacking point to the point of installation is included.

c) Datum plane for vertical transport: indoors, the indoor floor level; outdoors, the ground level of the installation site.

10. The following costs of this part are taken at the coefficients given in Table 1 Cost-taking coefficients.

Table 1, item 1, scaffolding erection and dismantling cost, calculated on the quota labour cost: nuclear island mechanical equipment installation works 15 per cent, of which labour cost 35 per cent; nuclear island piping installation works 10 per cent, of which labour cost 55 per cent; nuclear island ventilation and air conditioning works 10 per cent, of which labour cost 55 per cent; nuclear island electrical equipment installation works 15 per cent, of which labour cost 35 per cent; nuclear island automation control instrumentation installation works 15 per cent, of which labour cost 35 per cent; nuclear island communication equipment installation works 15 per cent, of which labour cost 35 per cent; nuclear island sandblasting, anticorrosion and thermal insulation works 20 per cent, of which labour cost 25 per cent.

Table 1, item 2, surcharge for loss of efficiency where installation is carried out at the same time as production: 10 per cent of the quota labour cost, of which labour cost 100 per cent.

Table 1, item 3, surcharge for loss of efficiency where construction is carried out in an environment harmful to physical health: 10 per cent of the quota labour cost, of which labour cost 100 per cent.

11. Excess-height surcharge (quota items in which the excess-height factor has already been taken into account are excluded): for electrical installation works in which the operated object is 5 m or more but less than 20 m above the floor level, the surcharge is calculated at 33 per cent of the labour cost of the excess-height portion.

12. The high-rise building surcharge (meaning industrial buildings of 6 storeys or 20 m and above) is calculated from the following table, the whole of the surcharge being labour wages.

High-rise building surcharge, as a percentage of the labour cost, by number of storeys and building height: up to 9 storeys (30 m) 1; up to 12 storeys (40 m) 2; up to 15 storeys (50 m) 4; up to 18 storeys (60 m) 6; up to 21 storeys (70 m) 8; up to 24 storeys (80 m) 10; up to 27 storeys (90 m) 13; up to 30 storeys (100 m) 16; up to 33 storeys (110 m) 19; up to 36 storeys (120 m) 22; up to 39 storeys (130 m) 25; up to 42 storeys (140 m) 28; up to 45 storeys (150 m) 31; up to 48 storeys (160 m) 34; up to 51 storeys (170 m) 37; up to 54 storeys (180 m) 40; up to 57 storeys (190 m) 43; up to 60 storeys (200 m) 46.

13. Unless otherwise stated in the individual parts and chapters, the following items are not included:

a) The cost of assisting in the single-machine trial running and the interlocked trial running of key equipment; b) the cost of single-machine functional tests; c) the electricity, steam, service water, circulating water, demineralized water, compressed air, nitrogen, lubricating oil (grease), feedstock and the like required for single-machine trial running; d) transport of equipment, materials, finished and semi-finished products outside the site.

e) Labour, material and machinery costs arising from work in excess of the codes; f) work on equipment and components that do not comply with the design requirements; g) the entry and exit charges, the use charges and the standing-time machine-shift charges of large machinery.

h) The cost of special labour protection articles required by the special nature of the works; i) the cost of special health care required by the special nature of the works; j) the cost of special technical measures required by the special nature of the works.

14. Where this part carries the wording within XX or XX and below, XX itself is included; where it carries the wording outside XX or above XX, XX itself is not included.

15. For matters not exhaustively covered by this part, see the explanations of the individual parts and chapters.

3 Volume Explanation - Provisions Specific to This Part

1. This part applies, in new-build and extension projects of pressurized water reactor nuclear power plants, to the installation works for substation and distribution equipment of 10 kV and below, workshop power electrical equipment, electrical lighting fixtures, lightning protection and earthing devices, conduit and wiring, and electrical adjustment tests.

2. Besides the work content already described in the individual chapters, the work content of this part also includes: construction technical preparation; preparation of construction quality control documents; construction machinery preparation; calibration preparation of standard instruments and gauges; construction safety protection measures; clearing of the installation position; site handling of equipment, materials, tools and machinery; unpacking inspection; adjustment testing; finishing off; site cleaning; assistance in quality inspection; cross-trade coordination in construction between the trades; and the standing time of the temporarily moved water, power and gas supplies.

3. The following work content is not included in this part:

a) Installation of electrical equipment above 10 kV and of items reserved to specialist trades.

b) Work in which electrical equipment (motors and the like) accompanies mechanical equipment for individual trial running and interlocked trial running.

4. The material loss rates of this part are given in Table 2 Table of main material loss rates.

Table 2, loss rates in per cent, items 1 to 11: power cable 1.0; control cable 1.5; insulated conductor (including rubber-sheathed copper, plastic-sheathed lead, flexible cord) 1.8; bare flexible conductor (including copper, aluminium, steel wire and steel-cored aluminium wire) 1.3; rigid busbar (including steel, aluminium and copper, in strip, tube, rod and channel form) 2.3; guy-wire material (including steel strand and galvanized iron wire) 1.5; pipes and pipe fittings (including seamless and welded steel pipe and electrical conduit) 3.0; plate material (including steel plate and galvanized thin steel plate) 6.0; section steel 6.0; conduit bodies (including conduit hoops, bushings, lock nuts and pipe clips) 3.0; fittings (including tension, suspension, well-hook and strain clamps and yoke plates) 1.0.

Table 2, loss rates in per cent, items 12 to 22: fasteners (including bolts, nuts, washers and spring washers) 2.0; wood screws and round nails 4.0; insulators 2.0; cable trays 0.5; low-voltage electrical porcelain products (including drum insulators, porcelain cleats and porcelain tubes) 3.0; low-voltage fuses, porcelain switch boxes and rubber-covered switches 1.0; plastic products (including plastic trunking board, plastic sheet and plastic pipe) 5.0; wooden pole material (including wooden poles, cross-arms, cross-bars and stakes) 1.0; concrete products (including concrete poles, base plates and anchor blocks) 0.5; asbestos cement board and its products 8.0; high-strength bolts 5.0.

Table 2, loss rates in per cent, items 23 to 33: oils 1.8; brick 4.0; sand 4.0; stone 8.0; cement 4.0; iron-clad switches 1.0; mortar 3.0; timber 5.0; rubber pads 3.0; sulfuric acid 4.0; distilled water 10.0.

Note 1 to Table 2: for insulated conductors, cables, rigid busbars and the bare flexible conductors used for busbars, the loss rate does not include the lengths left for connection to electrical equipment and apparatus, nor the extra length arising from the various bends (including radii); these lengths are all included in the basic length of the quantity of work.

Note 2 to Table 2: for the galvanized iron wire used for guy wires, the loss rate does not include the lengths needed to make the upper, middle and lower grips; when the quantity of wire is calculated, the developed length of the whole guy wire is to be taken as the basis.

4 Chapter 1 Diesel Engines and Generators - Chapter Explanation

1. The work content of equipment hoisting in this chapter comprises: construction preparation; inspection of the hoisting machinery; hoisting mock-up trial; inspection and acceptance of hoisting ropes, slings, tools and machinery; handling of tools, materials and equipment (including unloading from the vehicle into the plant building); unpacking inspection; erection and dismantling of tools and machinery; lifting and shifting of the hoisted assembly into position; levelling; temporary storage; turning over into the upright position; and setting down in the hoisting position.

2. The work content of equipment installation in this chapter comprises: construction preparation; equipment handling and hoisting; unpacking, checking and counting, cleaning; inspection and acceptance of the equipment foundation; re-survey and setting out of the foundation; chipping and roughening of the surface; embedding of the anchor bolts; pre-embedding of the secondary embedded parts; assistance in the secondary grouting; equipment installation; levelling and alignment of the equipment; adjustment and fixing of the equipment; adjustment of equipment clearances, verticality and concentricity; fitting up of the shim plates; fine adjustment and tightening; spot welding of the shim plates; evacuation of the chiller units; charging with refrigerant; measurement of the various parameters; and single-machine trial running.

3. The equipment installation quotas of this chapter do not include the following content: a) fabrication of special lifting gear; b) suction-cup drilling.

Rules for calculating quantities of work: 1. Diesel engines and motors are both measured in units of set or assembly, and the quota items are listed separately according to their different names, weight in t and span.

The chapter is subdivided into 1.1 Diesel engine installation, 1.2 Diesel generator set installation, and 1.3 Motor and motor-generator set installation.

5 Structure of the Quota Tables (worked example, Clause 1.1)

Each quota table gives the quota number, the item designation, the base price in yuan and its breakdown into labour cost, material cost and machinery cost, followed by the itemized consumption of labour, priced materials and construction machinery with their units and unit prices.

Clause 1.1 Diesel engine installation is measured in units of set. Quota number 7-1-1 covers (DX) diesel engine hoisting, 85 t, with a base price of 91828.00 yuan, made up of labour cost 28318.82 yuan, material cost 57694.79 yuan and machinery cost 5814.39 yuan.

Quota number 7-1-2 covers (DX) generator hoisting, 42 t, with a base price of 43044.13 yuan, made up of labour cost 17228.97 yuan, material cost 23422.78 yuan and machinery cost 2392.38 yuan.

Labour is entered as composite man-days for installation at a unit price of 135.00 yuan per man-day, the consumption being 209.769 man-days for quota 7-1-1 and 127.622 man-days for quota 7-1-2.

The priced materials of these two quotas include section steel (composite) at 2.70 yuan/kg, galvanized iron wire (composite) at 4.29 yuan/kg, steel wire rope (composite) at 16.07 yuan/kg, wire brush of 2 in at 8.55 yuan each, cotton yarn at 5.39 yuan/kg, coir rope at 8.60 yuan/kg, emery cloth at 0.73 yuan per sheet, rubber pad of 2 mm thickness at 7.25 yuan/kg, grinding wheel disc (composite) at 3.27 yuan each, welding electrode J427 (composite) at 9.83 yuan/kg, squared timber at 1398.23 yuan per cubic metre, sleeper timber at 2478.63 yuan per cubic metre, anti-rust paint C53-1 at 14.10 yuan/kg, petrol at 6.45 yuan/kg, oxygen (industrial) at 27.40 yuan per cylinder, mixed paint at 12.44 yuan/kg, bristle brush of 3 in at 2.56 yuan each and shackles of 10 t at 49.57 yuan each and of 30 t at 291.45 yuan each, plus other material cost in yuan.

The construction machinery of these two quotas is entered in machine-shifts and includes the far-infrared drying oven YZHZ-100 at 37.12 yuan per shift, truck cranes of 16 t lifting capacity at 1015.43 yuan per shift, of 50 t at 3159.06 yuan per shift and of 5 t at 462.83 yuan per shift, a flat-bed lorry of 5 t payload at 410.15 yuan per shift, an electric winch of 20 kN fast single-drum pull at 209.11 yuan per shift and an imported inverter arc welding rectifier of 27.8 kVA capacity at 123.40 yuan per shift, plus other machinery cost in yuan.

6 Chapters of the Quota (Structure of This Part)

Chapter 1 Diesel engines and generators, page 6: diesel engine installation, diesel generator set installation, motor and motor-generator set installation.

Chapter 2 Transformers, page 18: oil-immersed power transformer installation, dry-type transformer installation, arc-suppression coil installation, power transformer drying, transformer oil filtering.

Chapter 3 Distribution equipment, page 30: oil circuit breakers, vacuum and SF6 circuit breakers, large air circuit breakers and vacuum contactors, isolating and load switches, instrument transformers, fuses and surge arresters, reactors and reactor drying, power capacitors, shunt compensation capacitor racks and a.c. filter devices, high-voltage packaged distribution cabinets, combined packaged box-type substations.

Chapter 4 Busbars and insulators, page 53: insulators, wall bushings, flexible busbars and their down-leads, jumpers and equipment connections, combined flexible busbars, strip copper and strip aluminium busbars and their down-leads, expansion joints and copper transition plates, channel-type busbars and their connection to generators, transformers, circuit breakers and isolating switches, common-enclosure busbars, low-voltage enclosed plug-in busbar trunking and its incoming and outgoing distribution boxes, heavy-duty busbars, heavy-duty busbar expansion units and guide plates, machining of heavy-duty aluminium busbar contact faces.

Chapter 5 Control equipment and low-voltage apparatus, page 95: control, relay, simulation and distribution panels, silicon rectifier cabinets, thyristor cabinets, d.c. panels and other electrical panels and cabinets, control consoles and control boxes, packaged distribution boxes, uninterruptible power supplies, control switches, fuses and limit switches, controllers, contactors, starters, electromagnets and fast automatic switches, resistors and rheostats, push-buttons, horns and bells, instruments, apparatus and small busbars, shunts, panel and cabinet wiring, terminal boxes and terminal boards and their external check wiring, soldered and crimped copper terminals, crimped aluminium terminals, through-plates, foundation channel and angle steel, steel component fabrication and installation and box and case fabrication.

Chapter 6 Storage batteries, page 137: alkaline battery installation, fixed sealed lead-acid battery installation, maintenance-free lead-acid battery installation, battery charging and discharging.

Chapter 7 Motors, page 150: check and wiring of generators and phase modifiers, of small d.c. motors, of small a.c. asynchronous and synchronous motors, of small explosion-proof and small vertical motors, of large and medium motors, of miniature motors and variable-frequency sets and of electromagnetic variable-speed motors, plus drying of small motors and of large and medium motors.

Chapter 8 Trolley wire devices, page 164: light-duty trolley wire, safety-section type trolley wire, angle-steel and flat-steel trolley wire, round-steel and I-beam trolley wire, trolley wire brackets, trolley wire tensioning devices and suspension supports, mobile flexible cable.

Chapter 9 Cables, page 178: cable trench excavation and backfill and manual road breaking, sand bedding, cover bricks and movable cover slabs, cable protection conduit laying and pipe jacking, steel, glass-fibre-reinforced plastic, aluminium alloy and combined cable trays and their supports, plastic cable trunking, steel-mesh wire-collecting trays, cable tray identification, cable fireproof coating, hole sealing, barriers and flame-retardant trunking boxes, laying of aluminium-core, copper-core and fire-resistant power cables and of cables on suspended trays, fabrication and installation of indoor dry-type, indoor heat-shrinkable and outdoor power cable terminations, nuclear-grade indoor heat-shrinkable power cable terminations, control cable laying and control cable termination fabrication, nuclear-grade control cable terminations, copper-sheathed copper-core fire-resistant cable terminations, cable colour identification, suction-cup drilling, cable tray fire protection.

Chapter 10 Lightning protection and earthing devices, page 240: earthing electrode (plate) fabrication and installation, earthing busbar laying, earthing bonding jumpers, lightning rod fabrication and installation, independent lightning rods, semiconductor short-needle lightning eliminators, lightning down-conductor laying, lightning protection mesh installation, thermite welded joints for conductors and flat strip.

Chapter 11 Electrical adjustment tests, page 276: commissioning of generator and phase modifier systems, power transformer systems, transmission and distribution device systems, special protection devices, automatic switch-in devices, central signalling devices, emergency lighting transfer devices and uninterruptible power supplies, busbars, surge arresters, capacitors and earthing devices, reactors, arc-suppression coils and electrostatic precipitators, silicon rectifier equipment and thyristor rectifier devices, ordinary small d.c. motors, thyristor variable-speed d.c. motor systems, ordinary a.c. synchronous motors, low-voltage and high-voltage a.c. asynchronous motors, a.c. variable-frequency variable-speed motors of the a.c.-a.c. and a.c.-d.c.-a.c. systems, miniature motors and electric heaters, motor-set interlock devices, insulator, bushing, insulating oil and cable tests, steel component fabrication and installation and box and case fabrication.

Chapter 12 Conduit and wiring, page 322: electrical conduit laying in brick and concrete structures, exposed and concealed, and on steel structure brackets and steel wire ropes; steel conduit laying exposed and concealed in brick and concrete structures, concealed in steel formwork, on steel structure brackets and on steel wire ropes; explosion-proof steel conduit laying including tower lighting conduit; plastic conduit laying in rigid polyvinyl chloride, rigid flame-retardant, semi-rigid flame-retardant concealed and semi-rigid flame-retardant buried forms; stainless steel flexible metal conduit laying; flexible metal conduit installation; wire pulling in conduit; exposed laying of plastic-sheathed wire on brick and concrete structures and along steel wire ropes; trunking wiring; steel wire rope suspension; fabrication and installation of busbar tensioning devices and steel wire rope tensioning devices; workshop strip busbar installation along and across roof trusses, beams and columns; grooving of concrete floors for power conduit; junction box installation; connection box installation.

Chapter 13 Lighting fixtures, page 405: ordinary luminaires including ceiling-mounted types; decorative luminaires including combined fluorescent light bands and sign and guidance luminaires; fluorescent luminaires of packaged type; factory luminaires and waterproof and dustproof luminaires; other factory luminaires including iodine-tungsten lamps and floodlights, mixed-light lamps, chimney, water tower and free-standing tower marker lights and sealed luminaires; street lighting; switch, push-button and socket installation including explosion-proof sockets; safety transformer, electric bell, door bell and fan installation; coil fan switches and do-not-disturb lights.

Chapter 14 Electrical penetration assembly installation, page 455: installation of control and measurement electrical penetration assemblies, of medium-voltage electrical penetration assemblies and of personnel airlock electrical penetration assemblies.

Each chapter is preceded by a chapter explanation setting out the work content included, the content excluded and the rules for calculating the quantities of work, after which the quota tables give, for every quota number, the base price and its breakdown into labour, material and machinery cost together with the itemized consumptions.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 368 pages — is available in the English PDF.

Similar standards

Editions of NB/T 20358.7

EditionTitleRevisionStatus
NB/T 20358.7-2018Cost estimation of nuclear power plant construction project - Part 7: Electrical equipment installation engineering for nuclear islandcurrent editionCurrent
NB/T 20358.7-2015Cost estimation of nuclear power plant construction project - Part 7: Electrical equipment installation engineering for nuclear islandprevious editionIn force until 2018-09-01

This page sells the current edition, NB/T 20358.7-2018. Earlier editions are listed for reference only.

How to Buy NB/T 20358.7-2018

  1. 1Add to cart. Click the "Buy NB/T 20358.7-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
368 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20358.7-2018

$6,620.00

$5,625.00for partners