Scope

NB/T 20358.13-2018 is the English-translated version of 核电厂建设工程预算定额 第13部分:常规岛电气设备安装工程.

NB/T 20358.13-2018 is the Chinese budget estimation norm for installing the electrical equipment of the conventional island of a nuclear power plant, the thirteenth part of the NB/T 20358 series. Electrical installation is the trade that touches everything: the generator terminals and the main transformer, the medium and low voltage switchgear, the station service supplies, the DC and uninterruptible systems, the cable that runs to every motor and instrument in the turbine hall, the earthing grid and the lighting. It is also the trade whose cost is hardest to estimate from first principles, because it is made of an enormous number of small operations rather than a few large ones. A budget estimation norm solves that by fixing, for each defined unit - a metre of cable of a given size pulled in a given way, a termination, a panel set in place and connected - the labour, material and plant consumption that the state considers necessary. Those quotas are the basis of the estimate, the tender limit and the final account, and they are what an outside party needs in order to read a Chinese nuclear cost estimate rather than guess at it. The eleven chapters cover the generator and transformer installation, the switchgear and distribution equipment, the cable systems and their supports and penetrations, the earthing and lightning protection, the lighting installation, the control and protection panels, the battery and DC systems, and the associated testing and commissioning work. The document is one of the sixteen parts of NB/T 20358 and sits alongside the companion series NB/T 20355 to 20357. It was issued on 10 December 2018 by the National Energy Administration, took effect on 1 April 2019, and replaces the 2015 edition.

Document preview — NB/T 20358.13-2018

National Standard of the People's Republic of China

ICS
01.040.27
Classification
F 02
Replacing
NB/T 20358.13-2015

Issued by: National Energy Administration of the PRC

Contents

  • Explanation of the volume1
  • Chapter 1 Transformers4
  • Chapter explanation5
  • 1.1 Installation of three-phase power transformers6
  • 1.2 Installation of single-phase transformers15
  • 1.3 Installation of arc-suppression coils18
  • 1.4 Transformer oil filtering20
  • Chapter 2 Distribution devices21
  • Chapter explanation22
  • 2.1 Installation of circuit breakers24
  • 2.2 Installation of disconnecting switches34
  • 2.3 Installation of voltage transformers53
  • 2.4 Installation of current transformers54
  • 2.5 Installation of surge arresters58
  • 2.6 Installation of power capacitors61
  • 2.7 Installation of fuses and reactors63
  • 2.8 Installation of line traps69
  • 2.9 Installation of assembled shunt capacitors71
  • 2.10 Installation of complete high-voltage distribution cabinets73
  • 2.11 Box-type transformers76
  • Chapter 3 Insulators and busbars79
  • Chapter explanation80
  • 3.1 Installation of suspension insulators82
  • 3.2 Installation of indoor post insulators84
  • 3.3 Installation of outdoor post insulators85
  • 3.4 Installation of wall bushings86
  • 3.5 Installation of flexible busbars88
  • 3.6 Installation of down leads, jumpers and equipment connecting wires92
  • 3.7 Installation of bundled flexible busbars95
  • 3.8 Installation of strip aluminium busbars97
  • 3.9 Installation of aluminium conductor expansion joints100
  • 3.10 Installation of channel-type busbars102
  • 3.11 Installation of tubular busbars104
  • 3.12 Installation of isolated-phase enclosed busbars108
  • 3.13 Installation of 10kV common-enclosure busbars109
  • 3.14 Installation of cable busbars111
  • 3.15 Installation of generator outlet boxes114
  • 3.16 Installation of GIL gas-insulated busbars115
  • 3.17 Installation of low-voltage enclosed plug-in busways116
  • Chapter 4 Control and relay protection panels and low-voltage apparatus119
  • Chapter explanation120
  • 4.1 Installation of control and relay protection panels121
  • 4.2 Installation of excitation, de-excitation and charging feeder panels126
  • 4.3 Installation of terminal boxes and panel sides128
  • 4.4 Installation of panel accessories and secondary wiring131
  • 4.5 Fabrication and installation of penetration plates133
  • 4.6 Installation of low-voltage electrical equipment134
  • 4.7 Fabrication and installation of steel members and secondary painting of equipment140
  • Chapter 5 Storage batteries and UPS power supplies143
  • Chapter explanation144
  • 5.1 Installation of battery racks145
  • 5.2 Installation of maintenance-free lead-acid storage batteries146
  • 5.3 Installation of alkaline storage batteries149
  • 5.4 Installation of sealed lead-acid storage batteries151
  • 5.5 Installation of solar storage batteries154
  • 5.6 Charging and discharging of storage battery banks156
  • 5.7 Installation of UPS uninterruptible power supplies160
  • Chapter 6 Motors and synchronous condensers161
  • Chapter explanation162
  • 6.1 Checking and wiring of generators and synchronous condensers163
  • 6.2 Checking and wiring of direct current generators164
  • 6.3 Checking and wiring of direct current motors166
  • 6.4 Checking and wiring of alternating current motors168
  • 6.5 Checking and wiring of alternating current vertical motors172
  • 6.6 Installation of generator excitation rheostats175
  • Chapter 7 Electrical devices of lifting equipment176
  • Chapter explanation177
  • 7.1 Electrical installation of bridge cranes178
  • 7.2 Electrical installation of grab cranes179
  • 7.3 Electrical installation of monorail cranes180
  • 7.4 Electrical installation of electric hoists181
  • 7.5 Installation of trolley lines182
  • 7.6 Installation of mobile flexible cables186
  • 7.7 Installation of trolley line supports188
  • Chapter 8 Cables190
  • Chapter explanation191
  • 8.1 Manual excavation of road surfaces193
  • 8.2 Excavation and backfilling of direct-buried cable trenches and removal of trench covers195
  • 8.3 Sand bedding, brick covering or protective plates for direct-buried cables197
  • 8.4 Cable ladders, trays and trunking198
  • 8.5 Laying of cable protection conduits201
  • 8.6 Cable laying207
  • 8.7 Fabrication and installation of indoor cable terminations210
  • 8.8 Fabrication and installation of outdoor power cable terminations218
  • 8.9 Fabrication and installation of power cable intermediate joints220
  • 8.10 Fabrication and installation of control cable heads223
  • 8.11 Installation of cable fire protection facilities226
  • Chapter 9 Lighting and earthing229
  • Chapter explanation230
  • 9.1 Installation of equipment lighting231
  • 9.2 Installation of street lighting232
  • 9.3 Lighting of the plant area and inside the plant buildings233
  • 9.4 Installation of overhead conductors274
  • 9.5 Fabrication and installation of earth electrodes275
  • 9.6 Laying of outdoor earthing busbars276
  • 9.7 Laying of indoor earthing busbars278
  • 9.8 Installation of lightning rod earthing down conductors279
  • 9.9 Installation of lightning protection meshes283
  • 9.10 Installation of cathodic protection wells285
  • 9.11 Installation of cathodic protection well electrodes286
  • 9.12 Application of chemical resistance-reducing agents287
  • Chapter 10 Thermal instruments and control devices288
  • Chapter explanation289
  • 10.1 Installation of thermal control panels (cabinets)291
  • 10.2 Installation of common instruments295
  • 10.3 Installation of process control instruments306
  • 10.4 Installation of intelligent instruments, analytical instruments, industrial television and computers317
  • 10.5 Installation of mechanical quantity instruments332
  • 10.6 Laying of tubing and heat tracing cables336
  • 10.7 Installation of valves and accessories340
  • 10.8 Laying of conductors346
  • Chapter 11 Communication engineering347
  • Chapter explanation348
  • 11.1 Installation of communication power supply equipment352
  • 11.2 Installation of auxiliary equipment and other equipment370
  • 11.3 Laying, binding and welding (clamping) of equipment cables383
  • 11.4 Installation of program-controlled telephone exchange equipment388
  • 11.5 Optical fibre communication digital equipment397

Foreword

This document was issued on 10 December 2018 by the National Energy Administration of the PRC and takes effect on 1 April 2019.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 01.040.27, Chinese classification F 02.

It replaces NB/T 20358.13-2015, which is superseded.

NB/T 20358 Cost estimation of nuclear power plant construction project, together with NB/T 20355 Cost quota for civil and installation works of the nuclear island of nuclear power plant construction projects, NB/T 20356 Cost quota for civil and installation works of the conventional island of nuclear power plant construction projects and NB/T 20357 Cost quota for machine-shift expenses of nuclear power plant construction projects, forms the series of nuclear power quota standards that support the budgeting and pricing of nuclear power construction projects.

NB/T 20358 Cost estimation of nuclear power plant construction project currently consists of 16 parts, made up as follows.

Part 1: Nuclear island civil engineering.

Part 2: Nuclear island decoration engineering.

Part 3: Nuclear island steel structure engineering.

Part 4: Nuclear island process equipment installation engineering.

Part 5: Nuclear island process piping installation engineering.

Part 6: Nuclear island ventilation and air conditioning installation engineering.

Part 7: Nuclear island electrical equipment installation engineering.

Part 8: Nuclear island automation control instrument installation engineering.

Part 9: Nuclear island communication equipment installation engineering.

Part 10: Nuclear island anticorrosion and thermal insulation engineering.

Part 11: Conventional island civil engineering.

Part 12: Conventional island thermal equipment installation engineering.

Part 13: Conventional island electrical equipment installation engineering.

Part 14: Commissioning engineering.

Part 15: Fabrication of modules and steel containment vessel.

Part 16: Assembly and installation of modules and steel containment vessel.

This part is Part 13 of NB/T 20358.13-2018 Cost estimation of nuclear power plant construction project: Electrical equipment installation engineering for conventional island (hereinafter referred to as this quota). It was issued by Announcement No. 14 of 2018 of the National Energy Administration. The date of approval is 10 December 2018 and the date of implementation is 1 April 2019.

This part replaces NB/T 20358.13-2015.

This part was proposed by the Nuclear Power Standardization Technical Committee of the energy industry.

This part is under the centralized administration of the Nuclear Industry Standardization Research Institute.

The main drafting organizations of this part are: CGN Power Engineering Co., Ltd., China Nuclear Power Engineering Co., Ltd., Electric Power Planning and Engineering Institute, China International Engineering Consulting Corporation, China Energy Engineering Group Co., Ltd. and China Electric Power Construction Group Co., Ltd.

The main drafters of this part are: Fu Jungui, Zhou Yunsheng, Zhang Xiaoliang, Yang Wenrong, Zhang Jian, Zhang Li, Dong Ruilin, Yang Lirong, Qu Jun, Jiang Renjun, Zhu Daguang, Ji Kai, Fang Wei, Wei Yuchao, Yao Fuyong and Liu Kai.

This quota is published under ICS 01.040.27 and Chinese standard classification code F 02, as an energy industry standard of the People's Republic of China issued by the National Energy Administration.

Explanation of the volume

The volume opens with an explanation of the volume, placed on page 1 of the quota, which sets out the scope covered by this part and the rules for applying the quota items that follow.

Each chapter of the quota is in turn introduced by its own chapter explanation, which precedes the quota tables of that chapter and states what the work items of the chapter include and how they are measured.

The quota items of this part cover the installation of electrical equipment of the conventional island of a nuclear power plant, arranged in eleven chapters from transformers through to communication engineering.

The body of the quota is organised as tables of consumption norms for labour, materials and machine shifts, presented chapter by chapter over 425 pages.

1 Scope

NB/T 20358.13-2018 is the Chinese budget estimation norm for installing the electrical equipment of the conventional island of a nuclear power plant, the thirteenth part of the NB/T 20358 series. Electrical installation is the trade that touches everything: the generator terminals and the main transformer, the medium and low voltage switchgear, the station service supplies, the DC and uninterruptible systems, the cable that runs to every motor and instrument in the turbine hall, the earthing grid and the lighting. It is also the trade whose cost is hardest to estimate from first principles, because it is made of an enormous number of small operations rather than a few large ones. A budget estimation norm solves that by fixing, for each defined unit - a metre of cable of a given size pulled in a given way, a termination, a panel set in place and connected - the labour, material and plant consumption that the state considers necessary. Those quotas are the basis of the estimate, the tender limit and the final account, and they are what an outside party needs in order to read a Chinese nuclear cost estimate rather than guess at it. The eleven chapters cover the generator and transformer installation, the switchgear and distribution equipment, the cable systems and their supports and penetrations, the earthing and lightning protection, the lighting installation, the control and protection panels, the battery and DC systems, and the associated testing and commissioning work. The document is one of the sixteen parts of NB/T 20358 and sits alongside the companion series NB/T 20355 to 20357. It was issued on 10 December 2018 by the National Energy Administration, took effect on 1 April 2019, and replaces the 2015 edition.

Chapter 1 covers transformers and begins on page 4, with its chapter explanation on page 5.

1.1 Installation of three-phase power transformers.

1.1.1 Installation of 10kV transformers.

1.1.2 Installation of 35kV transformers.

1.1.3 Installation of 110kV double-winding transformers.

1.1.4 Installation of 220kV double-winding transformers.

1.1.5 Installation of 500kV double-winding transformers.

1.2 Installation of single-phase transformers.

1.2.1 Installation of 220kV single-phase transformers.

1.2.2 Installation of 500kV single-phase transformers.

1.3 Installation of arc-suppression coils.

1.4 Transformer oil filtering.

2 Distribution devices

Chapter 2 covers distribution devices and begins on page 21, with its chapter explanation on page 22.

2.1 Installation of circuit breakers.

2.1.1 Installation of vacuum circuit breakers.

2.1.2 Installation of minimum-oil circuit breakers.

2.1.3 Installation of SF6 circuit breakers.

2.1.4 Installation of SF6 gas-insulated metal-enclosed switchgear (GIS).

2.1.5 Installation of hybrid gas-insulated switchgear (HGIS) and air-insulated compact high-voltage switchgear (COMPASS).

2.2 Installation of disconnecting switches.

2.2.1 Installation of indoor disconnecting switches.

2.2.2 Installation of outdoor double-column disconnecting switches.

2.2.3 Installation of outdoor three-column disconnecting switches.

2.2.4 Installation of outdoor single-column (GW6) disconnecting switches.

2.2.5 Installation of open-type combined switchgear.

2.2.6 Installation of single-phase earthing switches.

2.3 Installation of voltage transformers.

2.4 Installation of current transformers.

2.4.1 Installation of indoor-type current transformers.

2.4.2 Installation of outdoor-type current transformers.

2.5 Installation of surge arresters.

2.6 Installation of power capacitors.

2.7 Installation of fuses and reactors.

2.7.1 Installation of fuses.

2.7.2 Installation of neutral-point small reactors.

2.7.3 Installation of 500kV high-voltage reactors.

2.8 Installation of line traps.

2.9 Installation of assembled shunt capacitors.

2.9.1 Installation of 35kV assembled shunt capacitors.

2.9.2 Installation of 10kV assembled shunt capacitors.

2.10 Installation of complete high-voltage distribution cabinets.

2.11 Box-type transformers.

3 Insulators and busbars

Chapter 3 covers insulators and busbars and begins on page 79, with its chapter explanation on page 80.

3.1 Installation of suspension insulators.

3.1.1 Installation of single strings of suspension insulators.

3.1.2 Installation of double strings of suspension insulators.

3.2 Installation of indoor post insulators.

3.3 Installation of outdoor post insulators.

3.4 Installation of wall bushings.

3.5 Installation of flexible busbars.

3.6 Installation of down leads, jumpers and equipment connecting wires.

3.7 Installation of bundled flexible busbars.

3.8 Installation of strip aluminium busbars.

3.8.1 Installation of strip aluminium busbars with one strip per phase.

3.8.2 Installation of strip aluminium busbars with several strips per phase.

3.9 Installation of aluminium conductor expansion joints.

3.10 Installation of channel-type busbars.

3.10.1 Installation of channel-type busbars.

3.10.2 Installation of channel-type busbars with equipment.

3.11 Installation of tubular busbars.

3.11.1 Installation of supported tubular busbars.

3.11.2 Installation of suspended tubular busbars.

3.11.3 Installation of down-lead arrangements for tubular busbars.

3.12 Installation of isolated-phase enclosed busbars.

3.13 Installation of 10kV common-enclosure busbars.

3.14 Installation of cable busbars.

3.15 Installation of generator outlet boxes.

3.16 Installation of GIL gas-insulated busbars.

3.17 Installation of low-voltage enclosed plug-in busways.

3.17.1 Installation of low-voltage enclosed plug-in busways.

3.17.2 Installation of tap-off boxes for enclosed busways.

4 Control and relay protection panels and low-voltage apparatus

Chapter 4 covers control and relay protection panels and low-voltage apparatus and begins on page 119, with its chapter explanation on page 120.

4.1 Installation of control and relay protection panels.

4.2 Installation of excitation, de-excitation and charging feeder panels.

4.3 Installation of terminal boxes and panel sides.

4.4 Installation of panel accessories and secondary wiring.

4.5 Fabrication and installation of penetration plates.

4.6 Installation of low-voltage electrical equipment.

4.7 Fabrication and installation of steel members and secondary painting of equipment.

5 Storage batteries and UPS power supplies

Chapter 5 covers storage batteries and UPS power supplies and begins on page 143, with its chapter explanation on page 144.

5.1 Installation of battery racks.

5.2 Installation of maintenance-free lead-acid storage batteries.

5.3 Installation of alkaline storage batteries.

5.4 Installation of sealed lead-acid storage batteries.

5.5 Installation of solar storage batteries.

5.6 Charging and discharging of storage battery banks.

5.7 Installation of UPS uninterruptible power supplies.

6 Motors and synchronous condensers

Chapter 6 covers motors and synchronous condensers and begins on page 161, with its chapter explanation on page 162.

6.1 Checking and wiring of generators and synchronous condensers.

6.2 Checking and wiring of direct current generators.

6.3 Checking and wiring of direct current motors.

6.4 Checking and wiring of alternating current motors.

6.5 Checking and wiring of alternating current vertical motors.

6.6 Installation of generator excitation rheostats.

7 Electrical devices of lifting equipment

Chapter 7 covers the electrical devices of lifting equipment and begins on page 176, with its chapter explanation on page 177.

7.1 Electrical installation of bridge cranes.

7.2 Electrical installation of grab cranes.

7.3 Electrical installation of monorail cranes.

7.4 Electrical installation of electric hoists.

7.5 Installation of trolley lines.

7.5.1 Installation of angle-steel trolley lines.

7.5.2 Installation of flat-steel trolley lines.

7.5.3 Installation of channel-steel trolley lines.

7.5.4 Installation of safety trolley lines.

7.6 Installation of mobile flexible cables.

7.7 Installation of trolley line supports.

8 Cables

Chapter 8 covers cables and begins on page 190, with its chapter explanation on page 191.

8.1 Manual excavation of road surfaces.

8.2 Excavation and backfilling of direct-buried cable trenches and removal of trench covers.

8.3 Sand bedding, brick covering or protective plates for direct-buried cables.

8.4 Cable ladders, trays and trunking.

8.5 Laying of cable protection conduits.

8.5.1 Laying of flexible metal conduits.

8.5.2 Laying of steel conduits.

8.5.3 Laying of rigid plastic conduits (PVC conduits).

8.5.4 Installation of pipe jacking.

8.6 Cable laying.

8.7 Fabrication and installation of indoor cable terminations.

8.7.1 Fabrication and installation of indoor epoxy resin cast cable terminations.

8.7.2 Fabrication and installation of indoor dry-wrapped power cable terminations.

8.7.3 Fabrication and installation of indoor irradiation cross-linked heat-shrink (cold-shrink) power cable terminations.

8.8 Fabrication and installation of outdoor power cable terminations.

8.8.1 Fabrication and installation of outdoor epoxy resin cast cable terminations.

8.8.2 Fabrication and installation of outdoor irradiation cross-linked heat-shrink (cold-shrink) power cable terminations.

8.9 Fabrication and installation of power cable intermediate joints.

8.9.1 Fabrication and installation of epoxy resin cast power cable intermediate joints.

8.9.2 Fabrication and installation of irradiation cross-linked heat-shrink power cable intermediate joints.

8.10 Fabrication and installation of control cable heads.

8.10.1 Fabrication and installation of control cable terminations.

8.10.2 Fabrication and installation of screened cable terminations.

8.11 Installation of cable fire protection facilities.

9 Lighting and earthing

Chapter 9 covers lighting and earthing and begins on page 229, with its chapter explanation on page 230.

9.1 Installation of equipment lighting.

9.2 Installation of street lighting.

9.3 Lighting of the plant area and inside the plant buildings.

9.3.1 Wiring and conduit work.

9.3.1.1 Laying of steel conduits (brick and concrete structures).

9.3.1.2 Laying of steel conduits (conduits on steel structure supports).

9.3.1.3 Laying of rigid plastic conduits (brick and concrete structures).

9.3.1.4 Laying of flexible metal conduits.

9.3.1.5 Drawing conductors into conduits.

9.3.1.6 Grooving of concrete floors.

9.3.2 Installation of distribution boxes, switch boxes and junction boxes.

9.3.2.1 Installation of distribution boxes.

9.3.2.2 Installation of junction boxes.

9.3.3 Installation of luminaires.

9.3.3.1 Installation of ordinary luminaires.

9.3.3.2 Installation of fluorescent luminaires.

9.3.3.3 Installation of industrial dome luminaires.

9.3.3.4 Installation of waterproof and dustproof luminaires.

9.3.3.5 Installation of other industrial luminaires.

9.3.3.6 Marker lights for stacks, water towers and free-standing towers.

9.3.3.7 Sealed luminaires.

9.3.3.8 Installation of street lamps.

9.3.4 Installation of switches and socket outlets.

9.3.4.1 Installation of switches.

9.3.4.2 Installation of socket outlets.

9.3.5 Installation of fans.

9.4 Installation of overhead conductors.

9.5 Fabrication and installation of earth electrodes.

9.6 Laying of outdoor earthing busbars.

9.7 Laying of indoor earthing busbars.

9.8 Installation of lightning rod earthing down conductors.

9.9 Installation of lightning protection meshes.

9.10 Installation of cathodic protection wells.

9.11 Installation of cathodic protection well electrodes.

9.12 Application of chemical resistance-reducing agents.

10 Thermal instruments and control devices

Chapter 10 covers thermal instruments and control devices and begins on page 288, with its chapter explanation on page 289.

10.1 Installation of thermal control panels (cabinets).

10.1.1 Installation of panels, cabinets and operating consoles.

10.1.2 Installation of panels (cabinets) with assembled equipment.

10.1.3 Installation of junction boxes.

10.2 Installation of common instruments.

10.2.1 Installation of temperature measuring instruments.

10.2.2 Installation of pressure measuring instruments.

10.2.3 Flow measuring instruments.

10.2.4 Installation of throttling devices.

10.2.5 Installation of level measuring instruments.

10.2.6 Installation of displays.

10.3 Installation of process control instruments.

10.3.1 Installation of electric unit combination instruments.

10.3.1.1 Installation of variable-speed unit instruments.

10.3.1.2 Installation of regulating and computing unit instruments.

10.3.1.3 Installation of set-point and auxiliary unit instruments.

10.3.2 Installation of assembled integrated control instruments.

10.3.3 Installation of actuators.

10.3.4 Installation of regulating devices.

10.3.5 Installation of field-mounted regulators.

10.4 Installation of intelligent instruments, analytical instruments, industrial television and computers.

10.4.1 Installation of scanning inspection devices.

10.4.2 Installation of signal alarm devices.

10.4.3 Installation of safety monitoring devices.

10.4.4 Installation of analytical instruments.

10.4.5 Installation of industrial television.

10.4.6 Installation of plant-wide closed-circuit television surveillance systems.

10.4.7 Installation of computer equipment.

10.5 Installation of mechanical quantity instruments.

10.5.1 Installation of protection devices.

10.5.2 Installation of weighing devices and belt protection devices.

10.6 Laying of tubing and heat tracing cables.

10.6.1 Laying of tubing.

10.6.2 Laying of heat tracing cables.

10.7 Installation of valves and accessories.

10.7.1 Installation of instrument valves.

10.7.2 Installation of tapping components.

10.7.3 Installation of accessories.

10.8 Laying of conductors.

11 Communication engineering

Chapter 11 covers communication engineering and begins on page 347, with its chapter explanation on page 348.

11.1 Installation of communication power supply equipment.

11.1.1 Installation of battery cabinets (racks) and storage batteries.

11.1.2 Supplementary charging and capacity testing of valve-regulated sealed lead-acid storage batteries.

11.1.3 Installation and joint commissioning of battery on-line monitoring equipment.

11.1.4 Installation of switching power supplies.

11.1.5 Installation of distribution equipment.

11.1.6 Installation of rectifying equipment, other distribution equipment and equipment surge protective devices.

11.2 Installation of auxiliary equipment and other equipment.

11.2.1 Installation of cable troughs, cable runways, power distribution frames and equipment bases.

11.2.2 Installation of racks and distribution frames.

11.2.3 Installation of audio distribution frames.

11.2.4 Installation of line-splitting equipment.

11.2.5 Installation of other auxiliary equipment.

11.3 Laying, binding and welding (clamping) of equipment cables.

11.4 Installation of program-controlled telephone exchange equipment.

11.5 Optical fibre communication digital equipment.

11.5.1 Installation and commissioning of optical fibre plesiochronous digital (PDH) transmission equipment.

11.5.2 Installation and commissioning of optical fibre plesiochronous digital (SDH) transmission equipment.

11.5.3 Installation and commissioning of interface boards of optical fibre synchronous digital (SDH) transmission equipment.

11.5.4 Installation and commissioning of the network management system of SDH systems and the monitoring of PDH systems.

11.5.5 Commissioning of digital communication channels.

11.5.6 Installation and testing of wavelength division multiplexing (DWDM) equipment.

11.5.7 Channel commissioning of wavelength division multiplexing (DWDM) systems.

11.5.8 Installation and commissioning of synchronous network equipment.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 555 pages — is available in the English PDF.

Similar standards

Editions of NB/T 20358.13

EditionTitleRevisionStatus
NB/T 20358.13-2018Cost estimation of nuclear power plant construction project - Part 13: Electrical equipment installation engineering for conventional islandcurrent editionCurrent
NB/T 20358.13-2015Cost estimation of nuclear power plant construction project - Part 13: Electrical equipment installation engineering for conventional islandprevious editionIn force until 2019-04-01

This page sells the current edition, NB/T 20358.13-2018. Earlier editions are listed for reference only.

How to Buy NB/T 20358.13-2018

  1. 1Add to cart. Click the "Buy NB/T 20358.13-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
555 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20358.13-2018

$7,865.00

$6,685.00for partners