NB/T 20358.9-2018Cost estimation of nuclear power plant construction project - Part 9: Communication equipment installation engineering for nuclear island (English PDF)

核电厂建设工程预算定额 第9部分:核岛通信设备安装工程

Open the NB/T 20358.9-2018 preview as PDF

Preview — first pages of NB/T 20358.9-2018 (full document: 145 pages)

This is a limited preview

Buy now to download the full PDF (145 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

March 22, 2018

Implementation date

September 1, 2018

Scope

NB/T 20358.9-2018 is the English-translated version of 核电厂建设工程预算定额 第9部分:核岛通信设备安装工程.

NB/T 20358.9-2018 is Part 9 of the Chinese budget quota series for nuclear power plant construction, and it prices the installation of communication equipment in the nuclear island. It covers the telephone and intercom systems, the public address and emergency announcement plant, the site radio and paging systems, the industrial television and its cameras and monitors, the clock and timing systems, the fibre optic and copper backbone and its distribution frames, and the racks, cabinets and cable routes that carry them, together with the testing and commissioning that closes the installation. Each quota item states the work content it includes, the unit of measurement, the labour hours by trade, the machine-shift consumption and the material quantities with their waste allowances, so that a price can be built from measured quantities rather than from judgement. The volume explanation at the front gives the scope of the quotas, the general provisions on what each rate already covers, the adjustment coefficients for working conditions such as radiation area and confined space, and the rules for measuring quantities; the chapter notes then add the conventions specific to each group of items. It replaces the 2015 edition. Owners, contractors and cost consultants use it to prepare budget estimates, tender prices and cost control baselines for nuclear power projects in China, and reviewers use it to check that a submitted price is defensible.

Document preview — NB/T 20358.9-2018

National Standard of the People's Republic of China

ICS
01.040.27
Classification
F02
Replacing
NB/T 20358.9-2015

Issued by: National Energy Administration of the PRC

Contents

  • Volume Description1
  • Chapter 1 Structured Cabling System Engineering5
  • Chapter Explanations6
  • 1.1 Laying of Twisted-Pair Cables7
  • 1.1.1 Pulling-in and Laying of Twisted-Pair Cables7
  • 1.1.2 Fabrication and Punch-Down Termination of Jumper Cables11
  • 1.1.3 Installation of Jumper Frames and Distribution Frames12
  • 1.1.4 Installation of Pull Boxes (Draw Boxes), Information Outlet Back Boxes (Junction Boxes)15
  • 1.1.5 Testing of Twisted-Pair Cables17
  • 1.2 Laying of Optical Cables18
  • 1.2.1 Optical Cable Laying18
  • 1.2.2 Laying of Optical Cable Sheathing21
  • 1.2.3 Installation of Optical Fibre Information Outlets22
  • 1.2.4 Laying of Pigtails23
  • 1.2.5 Installation and Testing of Optical Cable Termination Boxes24
  • 1.2.6 Outdoor Laying of Buried Optical Cables26
  • 1.2.7 Outdoor Laying of Duct Optical Cables27
  • 1.2.8 Optical Fibre Testing28
  • 1.3 Laying of Coaxial Cables29
  • 1.3.1 Coaxial Cable Laying29
  • 1.3.2 Laying of Leaky Coaxial Cables30
  • 1.3.3 Installation of Leaky Coaxial Cable Connectors32
  • 1.4 Laying of Telephone Lines and Broadcast Lines34
  • 1.4.1 Pulling-in and Laying of Telephone Lines34
  • 1.4.2 Installation of Packaged Telephone Terminal Boxes39
  • 1.4.3 Telephone Outlets and Intermediate Boxes41
  • 1.4.4 Pulling-in and Laying of Broadcast Lines42
  • 1.5 Laying of Special-Purpose Cables46
  • 1.6 Placing of Cabinets, Racks and Anti-Seismic Bases53
  • Chapter 2 Communication System Equipment Installation Engineering54
  • Chapter Explanations55
  • 2.1 Installation and Commissioning of Plant Communication Equipment56
  • 2.1.1 Installation and Commissioning of Automatic Command Call, Telephone and Conference Television Equipment56
  • 2.1.2 Installation and Commissioning of Stored-Program Control Exchanges67
  • 2.1.3 Installation and Commissioning of Optical Fibre Digital Transmission Equipment73
  • 2.2 Installation of Master-Slave Clocks89
  • Chapter 3 Installation of Automatic Fire Alarm Systems91
  • Chapter Explanations92
  • 3.1 Installation of Detectors94
  • 3.1.1 Point-Type Detectors94
  • 3.1.2 Line-Type Detectors98
  • 3.2 Installation of Manual Call Points99
  • 3.3 Installation of Modules (Interfaces)100
  • 3.4 Installation of Alarm Controllers101
  • 3.5 Installation of Interlock Controllers107
  • 3.6 Installation of Integrated Alarm and Interlock Units113
  • 3.7 Installation of Repeat Displays, Alarm Devices and Remote Controllers117
  • 3.8 Installation of Fire Emergency Broadcast Systems119
  • 3.9 Installation of Fire Communication and Alarm Standby Power Supplies122
  • Chapter 4 Installation of Security Protection Equipment124
  • Chapter Explanations125
  • 4.1 Installation of Intrusion Detection Equipment126
  • 4.1.1 Installation of Intrusion Detectors126
  • 4.1.2 Installation of Intrusion Alarm Controllers134
  • 4.1.3 Installation of Alarm Signal Transmission Equipment137
  • 4.2 Installation of Access Control Equipment140
  • 4.2.1 Installation of Front-End Equipment140
  • 4.2.2 Installation of Control Equipment143
  • 4.3 Installation of Security Inspection Equipment144
  • 4.3.1 Installation of Security Inspection Equipment144
  • 4.3.2 Installation of Metal Weapon Detection Gates146
  • 4.4 Installation of Television Surveillance Equipment147
  • 4.4.1 Installation of Camera Equipment147
  • 4.4.2 Installation of Monitors149
  • 4.4.3 Installation of Lenses153
  • 4.4.4 Installation of Mechanical Equipment155
  • 4.4.5 Installation of Video Control Equipment161
  • 4.4.6 Installation of Audio, Video and Pulse Distributors164
  • 4.4.7 Installation of Video Compensators165
  • 4.4.8 Video Transmission Equipment and Chinese Character Generating Equipment166
  • 4.4.9 Installation of Video Recording and Audio Recording Equipment169
  • 4.4.10 Installation of Power Supplies171
  • 4.4.11 Installation and Soldering of Plugs and Sockets174
  • 4.4.12 Installation of Protection System Equipment178
  • 4.5 Installation of Terminal Display Equipment180
  • 4.5.1 Installation of Display Devices180
  • 4.5.2 Installation of Mimic Panels181
  • 4.6 Commissioning of Security Protection Systems182
  • 4.6.1 Commissioning of Intrusion Alarm Systems182
  • 4.6.2 Commissioning of Television Surveillance Systems184
  • Chapter 5 Commissioning of Fire Protection Systems186
  • Chapter Explanations187
  • 5.1 Commissioning of Automatic Alarm System Devices188
  • 5.2 Commissioning of Water Fire-Extinguishing System Control Devices190
  • 5.3 Commissioning of Fire Emergency Broadcast, Fire Communication and Fire Lift System Devices191
  • 5.4 Commissioning of Control System Devices for Electric Fire Doors, Fire Roller Shutters, Positive-Pressure Air Supply Dampers, Smoke Exhaust Dampers and Fire Dampers192
  • 5.5 Commissioning of Gaseous Fire-Extinguishing System Devices193

Foreword

This document was issued on 22 March 2018 by the National Energy Administration of the PRC and takes effect on 1 September 2018.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 01.040.27, Chinese classification F02.

It replaces NB/T 20358.9-2015, which is superseded.

NB/T 20358 Cost Estimation of Nuclear Power Plant Construction Project, together with NB/T 20355 Cost Quota for Nuclear Island Building and Installation Works of Nuclear Power Plant Construction Projects, NB/T 20356 Cost Quota for Conventional Island Building and Installation Works of Nuclear Power Plant Construction Projects and NB/T 20357 Cost Quota for Construction Machinery Shifts of Nuclear Power Plant Construction Projects, jointly constitutes the series of nuclear power quota standards that support the budgeting and pricing of nuclear power construction projects.

NB/T 20358 Cost Estimation of Nuclear Power Plant Construction Project currently comprises 16 parts, composed as follows:

Part 1: Nuclear Island Building Works.

Part 2: Nuclear Island Decoration Works.

Part 3: Nuclear Island Steel Structure Works.

Part 4: Nuclear Process Equipment Installation Works.

Part 5: Nuclear Island Process Piping Installation Works.

Part 6: Nuclear Island Ventilation and Air Conditioning Installation Works.

Part 7: Nuclear Island Electrical Equipment Installation Works.

Part 8: Nuclear Island Automation and Control Instrumentation Installation Works.

Part 9: Nuclear Island Communication Equipment Installation Works.

Part 10: Nuclear Island Anticorrosion and Thermal Insulation Works.

Part 11: Conventional Island Building Works.

Part 12: Conventional Island Thermal Equipment Installation Works.

Part 13: Conventional Island Electrical Equipment Installation Works.

Part 14: Commissioning Works.

Part 15: Fabrication of Modules and Steel Containment Vessels.

Part 16: Assembly and Erection of Modules and Steel Containment Vessels.

This part is Part 9, Nuclear Island Communication Equipment Installation Works, of NB/T 20358.9-2018 Cost Estimation of Nuclear Power Plant Construction Project (hereinafter referred to as this part). It was released by Announcement No. 2 of 2018 of the National Energy Administration, with approval date 22 March 2018 and implementation date 1 September 2018.

This part was proposed by the Nuclear Power Standardization Technical Committee of the Energy Industry.

This part is under the jurisdiction of the Nuclear Industry Standardization Research Institute.

Chief drafting organizations of this part: China Nuclear Power Engineering Co., Ltd.; CGN Engineering Co., Ltd.; Electric Power Planning and Engineering Institute; China Nuclear Industry 23 Construction Co., Ltd.; China Nuclear Industry Huaxing Construction Co., Ltd.; China Nuclear Industry No. 22 Construction Co., Ltd.

Chief drafters of this part: Liu Bin, Qu Jun, Chen Xiangting, Rong Mei, Hu Jiang, Wang Yi, Fu Yi, Lai Xiaofeng, Lan Xiaohong, Xu Liang, Li Qingmei, He Zhe, Kong Liang, Fang Wei, Yang Nan, Han Tongbing, Zhang Liming, Wang Yuntang, Wang Guangming.

Cover registration number: Record No. 62791-2018. This part replaces NB/T 20358.9-2015.

Volume Description - Scope of Application

This part specifies the quotas for nuclear island communication equipment installation works within the cost estimation quotas for nuclear power plant construction projects.

This part is applicable to the nuclear island works of newly built and extended pressurized water reactor nuclear power units, and to those sub-items of BOP works that carry nuclear safety requirements, such as the nuclear island waste liquid storage tank building, the conventional island waste liquid storage tank building, the radioactive solid waste treatment auxiliary building, the solid waste interim storage, the radioactive machinery repair shop and the decontamination workshop. Other reactor types and nuclear projects may refer to it for guidance.

This part is to be applied in conjunction with NB/T 20355 Cost Quota for Nuclear Island Building and Installation Works of Nuclear Power Plant Construction Projects and NB/T 20357 Cost Quota for Construction Machinery Shifts of Nuclear Power Plant Construction Projects.

Volume Description - General Provisions

This part is the basis for preparing construction drawing budgets, for making project payments and final settlements, for tendering and bidding, and for pricing bills of quantities; it is also the basis on which preliminary estimate quotas are compiled.

This part has been compiled under normal natural and environmental conditions, on the basis of construction organization designs and construction machinery allocations that are rational at the present stage, taking account of reasonable overlapping of work, and in accordance with the relevant technical standards for pressurized water reactor nuclear power plants, the construction and acceptance codes, the quality assurance outline and safe operating procedures, and the requirements for civilized and safe construction on site and for environmental protection.

The consumption of labour, materials and construction machinery given in this part reflects the technical and organizational level of nuclear power plant construction at the present stage. Except where adjustment is expressly permitted within the quota, no quota may be adjusted on account of differences in construction organization, working method or material loss on a particular project.

Labour cost is stipulated as follows. The labour day is expressed as a composite workday, without distinction of trade or skill grade, each composite workday being reckoned on an eight-hour working system.

The composite unit rate for production workers is applied at 135.00 yuan per workday, which covers basic wages, wage-type allowances, auxiliary wages, employee welfare and labour protection expenses.

This part has been compiled for the following normal construction conditions. Equipment, materials, finished and semi-finished products and structural components are complete and undamaged, conform to the quality standards and design requirements, and are accompanied by certificates of conformity and test records, with supply meeting the installation schedule.

Overlapping between installation works and civil works is normal, and the civil works do not disturb the normal execution of the installation works.

The installation location, the buildings and structures, the equipment foundations and the embedded openings all conform to the design standards and satisfy the installation requirements.

Site installation conditions conform to the design requirements and satisfy the technical conditions.

Water and electricity supplies are sufficient for normal installation work.

Geographical environment and climatic conditions do not affect the normal work or the physical health of the installation workers. Where construction takes place in a special environment, the expenses are to be calculated separately in accordance with the relevant provisions.

Material cost is stipulated as follows. Materials comprise the main materials, auxiliary materials and sundry materials directly consumed in the installation work; material consumption comprises the quantity used directly in the installation work, the amortized quantity and the stipulated loss quantity.

Material loss comprises transport loss from the site warehouse, the central stacking area or the on-site processing point to the installation location, loss during construction operations, and loss in stacking on the construction site.

Materials for which no unit price is stated are main materials; their price is not included in the base price and shall be calculated from the actual price applied to the quantity listed.

Sundry materials used in very small quantities and having very little effect on the base price are combined into other material cost and entered in the material cost in yuan.

For the consumption rates of the main materials of the installation works, see the individual quotas of Part 4 to Part 10 of NB/T 20358 Cost Estimation of Nuclear Power Plant Construction Project.

Material unit prices are taken at the material depot price; the sum of the rates for material transport miscellaneous charges, transport loss and procurement and custody is 2.5%.

Construction machinery usage cost is stipulated as follows. The construction machinery usage cost in the quota is expressed by the machinery shift consumption.

The construction machinery in the quota has been determined on a composite basis in accordance with rational machinery allocation and the mechanization level of construction enterprises; where the actual situation differs from the quota, no adjustment is made unless otherwise stated in the individual chapters.

The quota sub-items list only the consumption of the principal equipment, appliances, instruments and meters. Sundry machinery used in very small quantities and having very little effect on the base price is combined into other machinery cost and entered in the machinery cost in yuan.

Tools and appliances whose unit value is within 2000 yuan or whose service life is within two years do not constitute fixed assets and are not included in the quota; they are considered in NB/T 20355 Cost Quota for Nuclear Island Building and Installation Works of Nuclear Power Plant Construction Projects.

Horizontal and vertical transport is stipulated as follows. For equipment, the quota covers horizontal and vertical transport from the designated stacking place on the installation site to the installation location, but does not include the horizontal and vertical transport of large equipment.

For materials, finished products and semi-finished products, the quota covers horizontal and vertical transport from the site warehouse of the construction organization or from the designated stacking place to the installation location.

The datum plane for vertical transport is the indoor floor level for indoor work and the ground level of the installation site for outdoor work.

The following expenses of this part are calculated with the coefficients stipulated in Table 1 Charging Coefficients.

Table 1, item 1, scaffolding erection and dismantling: for nuclear island mechanical equipment installation works, 15% of the quota labour cost, of which labour cost accounts for 35%.

Table 1, item 1.2, nuclear island piping installation works: 10% of the quota labour cost, of which labour cost accounts for 55%.

Table 1, item 1.3, nuclear island ventilation and air conditioning works: 10% of the quota labour cost, of which labour cost accounts for 55%.

Table 1, item 1.4, nuclear island electrical equipment installation works: 15% of the quota labour cost, of which labour cost accounts for 35%.

Table 1, item 1.5, nuclear island automation and control instrumentation installation works: 15% of the quota labour cost, of which labour cost accounts for 35%.

Table 1, item 1.6, nuclear island communication equipment installation works: 15% of the quota labour cost, of which labour cost accounts for 35%.

Table 1, item 1.7, nuclear island sandblasting, anticorrosion and thermal insulation works: 20% of the quota labour cost, of which labour cost accounts for 25%.

Table 1, item 2, surcharge for loss of efficiency where construction is carried out simultaneously with production: 10% of the quota labour cost, of which labour cost accounts for 100%.

Table 1, item 3, surcharge for loss of efficiency where construction is carried out in an environment harmful to human health: 10% of the quota labour cost, of which labour cost accounts for 100%.

Except where otherwise stated in the individual parts or chapters, the following items are not included: the cost of assisting in the single-machine test running and in the interlocked test running of key equipment.

Single-machine functional acceptance tests are not included.

The electricity, steam, industrial water, circulating water, demineralized water, compressed air, nitrogen, lubricating oil or grease, feed materials and the like required for single-machine test running are not included.

Off-site transport of equipment, materials, finished products and semi-finished products is not included.

Additional labour, material and machinery costs arising from work in excess of the codes are not included.

Work on equipment or structural components that do not conform to the design requirements is not included.

Mobilization and demobilization charges, usage charges and idle-shift charges of large machinery are not included.

The cost of special labour protection articles required by the particular nature of the project is not included.

The cost of special health protection required by the particular nature of the project is not included.

The cost of special technical measures required by the particular nature of the project is not included.

Where the wording XX or less or XX or under appears in this part, XX itself is included; where the wording more than XX or above XX appears, XX itself is not included.

Matters not covered in this part are dealt with in the descriptions of the individual parts and chapters.

Volume Description - Provisions Specific to This Part

This part applies to the installation and commissioning of structured cabling systems, communication system equipment, automatic fire alarm systems and security protection equipment, and to fire protection system commissioning works, in new construction, extension and reconstruction projects of nuclear power plants or of other nuclear-related projects.

In addition to the operations already described in the individual chapters, the work content of this part also includes construction technical preparation, preparation of construction quality control documents, preparation of construction machinery, calibration of standard instruments and meters, construction safety protection measures, clearing of the installation location, site handling of equipment materials and tools, unpacking inspection, installation, adjustment and testing, finishing off, site clearance, cooperation with quality inspection, cross-trade coordination during construction, and the shutdown time for temporary relocation of water, electricity and gas supplies.

The calibration material cost of this part includes the consumable materials used for calibration and the loss of the verification materials.

The following items are executed under the corresponding items of other parts. Control cable laying, electrical conduit installation, fabrication and installation of supports, cable tray installation, and fabrication and installation of the foundations of panels and cabinets are executed under the corresponding items of Cost Estimation of Nuclear Power Plant Construction Project - Part 7: Nuclear Island Electrical Equipment Installation Works.

Earthing and earth resistance testing are executed under the corresponding quotas of Part 7: Nuclear Island Electrical Equipment Installation Works.

Oil painting, thermal insulation, sandblasting, anticorrosion and touch-up painting are executed under the corresponding items of Part 10: Nuclear Island Anticorrosion and Thermal Insulation Works.

Cable trays, brackets, columns, partition plates and cover plates procured as finished products are installed under the quota for metal ironwork installation of Part 7: Nuclear Island Electrical Equipment Installation Works; where fabrication is required, the quota for metal ironwork fabrication of Part 7 is applied.

Concrete foundations are executed under the corresponding items of the civil works quota; high-strength bolts are executed under the corresponding items of Part 7: Nuclear Island Electrical Equipment Installation Works.

Other provisions. Special instruments and meters for calibration brought in by the contractor with the equipment shall be provided free of charge by the owner for the use of the construction organization.

Super-height surcharge: for the installation of communication equipment where the operating object is at a height of more than 5 m and not more than 20 m above the floor level, 33% of the labour cost of the portion in excess is calculated, of which labour cost accounts for 100%.

The material loss rates of this part are given in Table 2 Table of Material Loss Rates.

Table 2: cables of all types 2.00%; compensating conductors 4.00%; guy-wire materials, including steel strand and galvanized iron wire, 2.00%.

Table 2: plastic bushings 1.00%; jumper connectors 1.00%; pull boxes 1.00%; information outlet back boxes or junction boxes 1.00%.

Table 2: optical fibre sheathing 1.00%; optical cable joint boxes 1.00%; joint box protective sleeves 1.00%; subscriber concealed boxes 1.00%; plugs and sockets of all types 1.00%.

Table 2: fasteners, including bolts, nuts, washers and spring washers, 2.00%; wood screws and rivets 4.00%.

Table 2: plate materials, including steel plate and galvanized thin steel plate, 5.00%; pipes and fittings, including seamless pipe, welded steel pipe, plastic pipe and electrical conduit, 3.00%.

Table 2: position number plates, marking plates and wire number sleeves 5.00%; cable clips, cable hooks and cable support plates 1.00%.

1 Scope

NB/T 20358.9-2018 is Part 9 of the Chinese budget quota series for nuclear power plant construction, and it prices the installation of communication equipment in the nuclear island. It covers the telephone and intercom systems, the public address and emergency announcement plant, the site radio and paging systems, the industrial television and its cameras and monitors, the clock and timing systems, the fibre optic and copper backbone and its distribution frames, and the racks, cabinets and cable routes that carry them, together with the testing and commissioning that closes the installation. Each quota item states the work content it includes, the unit of measurement, the labour hours by trade, the machine-shift consumption and the material quantities with their waste allowances, so that a price can be built from measured quantities rather than from judgement. The volume explanation at the front gives the scope of the quotas, the general provisions on what each rate already covers, the adjustment coefficients for working conditions such as radiation area and confined space, and the rules for measuring quantities; the chapter notes then add the conventions specific to each group of items. It replaces the 2015 edition. Owners, contractors and cost consultants use it to prepare budget estimates, tender prices and cost control baselines for nuclear power projects in China, and reviewers use it to check that a submitted price is defensible.

This chapter comprises the following items: laying of twisted-pair cables, laying of optical cables, laying of coaxial cables, laying of telephone lines and broadcast lines, laying of special-purpose cables, and placing of cabinets, racks and anti-seismic bases.

The work content of this chapter is: preparation, laying, fixing, insulation checking, testing, wire checking, sealing of connection points and marking. In addition, it also includes the following items.

Laying of system cables with plugs, lifting and replacing floor panels, and hanging of labels.

Fabrication of shielded cable heads: welding of AC and DC earth wires, earth resistance testing, and fitting of wire number sleeves.

Optical cable joint testing, fusion splicing, jointing, joint box installation, earthing device installation, installation of packaged accessories, re-measurement of attenuation, installation of loading coils, wrapping of the outer sheath, and pressurization tests.

Optical cable termination joints: fabrication of live connectors, fixing, attenuation testing, and fixing of the optical cable terminal head.

Optical cable plugging: preparation of the plugging compound, sealing and insulation testing.

Repeater section testing: optical fibre characteristic testing, electrical performance testing of copper conductors, sheath-to-earth testing, and fault handling.

This chapter does not include the following work content: burial of optical repeaters.

Earthwork and backfilling and road surface excavation are not included; where they occur they are executed separately.

Other provisions. The cables laid under this chapter are cables dedicated to communication and to instrumentation and control; control cables, power cables, protective conduits and earthing systems are executed under the relevant budget quota items of Cost Estimation of Nuclear Power Plant Construction Project - Part 7: Nuclear Island Electrical Equipment Installation Works.

The twisted-pair cable laying quotas of this chapter are compiled for systems of Category 6 and below, including Category 6. For cabling system works above Category 6, the composite workday consumption of the quota sub-items used is calculated with an increase of 20%.

Where cables are laid inside an already built canopy structure, the composite workday consumption of the quota sub-items used is calculated with an increase of 80%.

Rules for calculating quantities. The laying, pulling-in and open laying of twisted-pair cables, optical cables, leaky coaxial cables, telephone lines and broadcast lines are calculated in m. Cable laying is calculated by the extended length of a single run: for example, if three cables each 100 m long are laid on one rack, 300 m is calculated, and so on. The additional and reserved lengths are a constituent part of the cable laying length and shall be counted within the cable length quantity. The reserved length where a cable enters a building is 2 m; the reserved length where a cable is led up or down into a trench or onto a cable tray is 1.5 m; at an intermediate cable joint box, 2 m is reserved at each of the two ends.

Fabrication of jumpers is calculated per piece; punch-down termination of twisted-pair cables is calculated per pair; installation of jumper frames and distribution frames is calculated per unit.

Installation of information outlets of all types, pull boxes, information outlet back boxes or junction boxes, optical cable termination boxes and punch-down blocks is calculated per piece.

Twisted-pair cable testing is calculated by link or by information point; optical fibre testing is calculated by link or by fibre core.

Laying of pigtails is calculated per length.

Outdoor erection of aerial optical cable is calculated in m.

Fabrication of optical cable termination joints is calculated per fibre core.

Installation of leaky coaxial cable connectors is calculated per piece.

Installation of packaged telephone terminal boxes, cabinets, racks and anti-seismic bases is calculated per set.

Installation of telephone outlets, intermediate boxes and telephone cable aerial lead-in devices is calculated per piece.

1.1 1.1 Laying of Twisted-Pair Cables - Quota Sub-Items

Sub-clause 1.1.1 Pulling-in and laying of twisted-pair cables. Work content: inspection, sample testing of the cable, cleaning of the conduit or concealed trough, fabrication of the pulling head or hook, pulling in of the draw wire, pulling in of the cable, marking, and sealing of the outlet. Unit of the quota: 100 m.

Quota number 9-1-1, pulling-in and laying of twisted-pair cable inside conduit or concealed trough, 4 pairs or less: base price 226.10 yuan, of which labour cost 213.71 yuan, material cost 1.00 yuan and machinery cost 11.39 yuan; composite workday for installation 1.583 workdays at 135.00 yuan per workday.

Quota number 9-1-2, pulling-in and laying of twisted-pair cable inside conduit or concealed trough, 25 pairs or less: base price 280.80 yuan, of which labour cost 263.12 yuan, material cost 1.08 yuan and machinery cost 16.60 yuan; composite workday for installation 1.949 workdays.

For sub-items 9-1-1 and 9-1-2 the unpriced material is the twisted-pair cable itself, 102.000 m per 100 m of quota unit, that is 4-pair cable for 9-1-1 and 25-pair cable for 9-1-2.

Priced materials for 9-1-1 and 9-1-2: composite galvanized iron wire, 0.200 kg at 4.29 yuan per kg; plastic bushing 15, 4.040 pieces at 0.04 yuan each for 9-1-1; plastic bushing 32, 4.040 pieces at 0.05 yuan each for 9-1-2.

Machinery for 9-1-1 and 9-1-2: digital multimeter PF 56, at 10.96 yuan per shift, 0.100 shift for 9-1-1 and 0.200 shift for 9-1-2; walkie-talkie C15, at 10.29 yuan per shift, 1.000 shift for 9-1-1 and 1.400 shifts for 9-1-2.

Quota number 9-1-3, pulling-in and laying of twisted-pair cable inside conduit or concealed trough, 50 pairs or less: base price 388.17 yuan, of which labour cost 361.80 yuan, material cost 1.41 yuan and machinery cost 24.96 yuan; composite workday for installation 2.680 workdays.

Quota number 9-1-4, pulling-in and laying of twisted-pair cable inside conduit or concealed trough, 100 pairs or less: base price 568.74 yuan, of which labour cost 526.23 yuan, material cost 2.87 yuan and machinery cost 39.64 yuan; composite workday for installation 3.898 workdays.

Quota number 9-1-5, pulling-in and laying of twisted-pair cable inside conduit or concealed trough, 200 pairs or less: base price 803.15 yuan, of which labour cost 739.94 yuan, material cost 4.52 yuan and machinery cost 58.69 yuan; composite workday for installation 5.481 workdays.

For sub-items 9-1-3 to 9-1-5 the unpriced material is the corresponding 50-pair, 100-pair or 200-pair twisted-pair cable, 102.000 m per 100 m of quota unit.

Priced materials for 9-1-3 to 9-1-5: composite galvanized iron wire, 0.200 kg in each case; plastic bushing 50, 4.040 pieces at 0.14 yuan each for 9-1-3; plastic bushing 70, 4.040 pieces at 0.50 yuan each for 9-1-4; plastic bushing 100, 4.040 pieces at 0.91 yuan each for 9-1-5.

Machinery for 9-1-3 to 9-1-5: digital multimeter PF-56, 0.400, 0.800 and 1.600 shifts respectively; walkie-talkie C15, 2.000, 3.000 and 4.000 shifts respectively.

Open laying of twisted-pair cables. Work content: inspection, sample testing of the cable, cleaning of the trunking or duct, laying, binding of the cable, marking, and sealing of the outlet. Unit of the quota: 100 m.

Quota number 9-1-6, open laying of twisted-pair cable in trunking, cable tray, support or raised floor, 4 pairs or less: base price 335.73 yuan, of which labour cost 246.65 yuan, material cost 77.69 yuan and machinery cost 11.39 yuan; composite workday for installation 1.827 workdays.

Quota number 9-1-7, open laying of twisted-pair cable in trunking, cable tray, support or raised floor, 25 pairs or less: base price 419.63 yuan, of which labour cost 312.39 yuan, material cost 90.64 yuan and machinery cost 16.60 yuan; composite workday for installation 2.314 workdays.

Quota number 9-1-8, open laying of twisted-pair cable in trunking, cable tray, support or raised floor, 50 pairs or less: base price 523.16 yuan, of which labour cost 394.61 yuan, material cost 103.59 yuan and machinery cost 24.96 yuan; composite workday for installation 2.923 workdays.

For sub-items 9-1-6 to 9-1-8 the unpriced material is the corresponding 4-pair, 25-pair or 50-pair twisted-pair cable, 102.000 m per 100 m of quota unit; the priced material is composite cable clips at 2.56 yuan each, 30.300, 35.350 and 40.400 pieces respectively.

Machinery for 9-1-6 to 9-1-8: digital multimeter PF-56, 0.100, 0.200 and 0.400 shifts respectively; walkie-talkie C15, 1.000, 1.400 and 2.000 shifts respectively.

Quota number 9-1-9, open laying of twisted-pair cable in trunking, cable tray, support or raised floor, 100 pairs or less: base price 715.21 yuan, of which labour cost 559.04 yuan, material cost 116.53 yuan and machinery cost 39.64 yuan; composite workday for installation 4.141 workdays.

Quota number 9-1-10, open laying of twisted-pair cable in trunking, cable tray, support or raised floor, 200 pairs or less: base price 977.38 yuan, of which labour cost 789.21 yuan, material cost 129.48 yuan and machinery cost 58.69 yuan; composite workday for installation 5.846 workdays.

For sub-items 9-1-9 and 9-1-10 the unpriced material is 100-pair or 200-pair twisted-pair cable, 102.000 m per 100 m of quota unit; the priced material is composite cable clips, 45.450 and 50.500 pieces respectively.

Machinery for 9-1-9 and 9-1-10: digital multimeter PF-56, 0.800 and 1.600 shifts; walkie-talkie C15, 3.000 and 4.000 shifts.

Sub-clause 1.1.2 Fabrication and punch-down termination of jumper cables. Work content for jumper fabrication: measuring and cutting the cable, installation and punch-down termination of the cable to the jumper connector, shielding, and inspection and testing. Work content for punch-down termination of twisted-pair cable: binding and fixing the cable, punching down the wires, checking the wiring sequence, installing and fixing the termination module or jumper block, and marking.

Quota number 9-1-11, fabrication of jumpers, per piece: base price 19.71 yuan, of which labour cost 9.45 yuan and machinery cost 10.26 yuan; composite workday for installation 0.070 workday. Unpriced material: jumper connectors, 2.020 pieces.

Machinery for 9-1-11: continuity tester TEXE.ALL.IV at 170.00 yuan per shift, 0.040 shift; twisted-pair cable crimping tool R345 at 115.46 yuan per shift, 0.030 shift.

Quota number 9-1-12, punch-down termination of jumpers, per pair: base price 1.89 yuan, consisting entirely of labour cost 1.89 yuan, with no material cost and no machinery cost; composite workday for installation 0.014 workday.

Sub-clause 1.1.3 Installation of jumper frames and distribution frames. Work content: installation of the punch-down jumper frame, the distribution frame and the punch-down twisted-pair cable, binding and fixing of the twisted-pair conductors, punching down of the wires, shielding, checking of the wiring sequence, and marking. Unit of the quota: per unit.

Quota number 9-1-13, installation and punch-down of jumper frame, 100 pairs: base price 249.93 yuan, of which labour cost 189.41 yuan, material cost 2.79 yuan and machinery cost 57.73 yuan; composite workday for installation 1.403 workdays.

Quota number 9-1-14, installation and punch-down of jumper frame, 200 pairs: base price 478.16 yuan, of which labour cost 359.91 yuan, material cost 2.79 yuan and machinery cost 115.46 yuan; composite workday for installation 2.666 workdays.

Quota number 9-1-15, installation and punch-down of jumper frame, 400 pairs: base price 944.07 yuan, of which labour cost 710.37 yuan, material cost 2.79 yuan and machinery cost 230.91 yuan; composite workday for installation 5.262 workdays.

Priced material for 9-1-13 to 9-1-15: bolt M5, 4.080 sets at 0.68 yuan per set in each case.

Machinery for 9-1-13 to 9-1-15: twisted-pair cable crimping tool 788J1/788M1 at 115.46 yuan per shift, 0.500, 1.000 and 2.000 shifts respectively.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 145 pages — is available in the English PDF.

Similar standards

Editions of NB/T 20358.9

EditionTitleRevisionStatus
NB/T 20358.9-2018Cost estimation of nuclear power plant construction project - Part 9: Communication equipment installation engineering for nuclear islandcurrent editionCurrent
NB/T 20358.9-2015Cost estimation of nuclear power plant construction project - Part 9: Communication equipment installation engineering for nuclear islandprevious editionIn force until 2018-09-01

This page sells the current edition, NB/T 20358.9-2018. Earlier editions are listed for reference only.

How to Buy NB/T 20358.9-2018

  1. 1Add to cart. Click the "Buy NB/T 20358.9-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
145 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20358.9-2018

$2,615.00

$2,225.00for partners