Search NB/T
500 NB/T standards in English, from NB/T 20412-2017 to NB/T 25083-2018, in code order.
- NB/T 20412-2017Specification for structure module assembly and acceptance in PWR nuclear power plant$240.00
- NB/T 20413-2017Technical regulation for structural modules installation and acceptance of PWR nuclear power plant$240.00
- NB/T 20414-2017Technical requirements for post-installed components of nuclear safety related concrete structures in nuclear power plants$435.00
- NB/T 20415-2017Technical specification of secondary design of steel structure in nuclear power plant$195.00
- NB/T 20416-2017Design and manufacture standard for nuclear-grade metal bellows expansion joints for PWR nuclear power plants$420.00
- NB/T 20417-2017Fire dampers for ventilation and smoke exhaust systems of nuclear power plants$300.00
- NB/T 20418-2017Electronic records metadata for nuclear power industry$485.00
- NB/T 20419-2017Design criteria for containment filtration and exhaust system of pressurized water reactor nuclear power plant$120.00
- NB/T 20420-2017Qualification of class 1E electric cables and splices for nuclear power plants$270.00
- NB/T 20421.1-2017The condition monitoring methods of cable important to safety in nuclear power plants - Part 1: General$165.00
- NB/T 20421.2-2017The condition monitoring methods of cable important to safety in nuclear power plants - Part 2: Indenter modulus$210.00
- NB/T 20421.3-2017The condition monitoring methods of cable important to safety in nuclear power plants - Part 3: Elongation at break$255.00
- NB/T 20421.4-2017The condition monitoring methods of cable important to safety in nuclear power plants - Part 4: Oxidation induction techniques$270.00
- NB/T 20421.5-2021Monitoring method for safety important cables in nuclear power plants - Part 5: Optical time domain reflection$420.00
- NB/T 20421.6-2023Condition monitoring method of cables important to safety in nuclear power plants - Part 6: Insulation resistance$270.00
- NB/T 20422-2017Qualification of passive autocatalytic hydrogen recombiner for pressurized water reactor NPP$270.00
- NB/T 20423-2017Commissioning technical guideline of mobile emergency diesel generator system in nuclear power plants$150.00
- NB/T 20424-2017Setting requirements for flow restrictors in nuclear power plant$180.00
- NB/T 20425-2017Methodology for performance of internal flooding probabilistic safety assessment for nuclear power plants$390.00
- NB/T 20426-2017Equipment maintenance requirements of PWR nuclear power plants during commissioning phase$150.00
- NB/T 20427-2017Human error reduction management of nuclear power plant$300.00
- NB/T 20428-2017Requirements for computer security of instrumentation and control systems in nuclear power plants$375.00
- NB/T 20429-2017Requirements for preparation of emergency operating procedures for nuclear power plants$375.00
- NB/T 20430-2017Technical regulations for installation of reactor head structure in passive pressurized water reactor nuclear power plant$255.00
- NB/T 20431-2017Structural integrity test of steel containment vessel for pressurized water reactor nuclear power plants$165.00
- NB/T 20432-2017Equipment for continuous in-line or on-line monitoring of radioactivity in process streams for normal and incident conditions for instrumentation important to safety in nuclear power plants$360.00
- NB/T 20433-2017Requirement of equipment for continuous monitoring of radioactivity in gaseous effluents of nuclear power plant$315.00
- NB/T 20434-2017Initial loading test for pressurized water reactor of nuclear power plant$105.00
- NB/T 20435-2017Core physics tests during reactor commissioning startup of pressurized water reactor nuclear power plants$255.00
- NB/T 20436-2017Water chemistry for pressurized water reactor nuclear power plant$135.00
- NB/T 20437-2017Specification for test of concrete in nuclear power engineering$935.00
- NB/T 20438-2017Technical code for construction of shield building roof structure in passive PWR nuclear power plant$195.00
- NB/T 20439-2017Rules for establishing pressure-temperature limit curves for reactor pressure vessel of pressurized water reactor nuclear power plants$285.00
- NB/T 20440-2017Assessment criteria for preventing fast rupture of reactor pressure vessel of pressurized water reactor nuclear power plants$360.00
- NB/T 20441-2017Technical regulation of hydrostatic test for secondary part of the steam generator of pressurized water reactor nuclear power plants$105.00
- NB/T 20442.1-2024Guidelines for Periodic Safety Assessment of Nuclear Power Plants - Part 1: General Requirements$405.00
- NB/T 20442.10-2017Guideline of periodic safety review for nuclear power plants - Part 10: Human factors$120.00
- NB/T 20442.11-2017Guideline of periodic safety review for nuclear power plant - Part 11: Equipment qualification$105.00
- NB/T 20442.12-2017Guideline of periodic safety review for nuclear power plants - Part 12: Design$120.00
- NB/T 20442.12-2024Guidelines for Periodic Safety Assessment of Nuclear Power Plants - Part 12: Design$344.00
- NB/T 20442.13-2017Guideline of periodic safety review for nuclear power plants - Part 13: Emergency plan$165.00
- NB/T 20442.14-2017Guideline of periodic safety review for nuclear power plant - Part 14: Hazard analysis$105.00
- NB/T 20442.15-2017Guideline of periodic safety review for nuclear power plants - Part 15: Organization and administration$135.00
- NB/T 20442.2-2017Guideline of periodic safety review for nuclear power plants - Part 2: Safety performance$120.00
- NB/T 20442.3-2017Guideline of periodic safety review for nuclear power plants - Part 3: Procedures$105.00
- NB/T 20442.4-2017Guideline of periodic safety review for nuclear power plants - Part 4: Radiological impact on the environment$150.00
- NB/T 20442.5-2017Guideline of periodic safety review for nuclear power plants - Part 5: Probabilistic safety analysis$135.00
- NB/T 20442.6-2017Guideline of periodic safety review for nuclear power plants - Part 6: Actual condition of structures, systems and components$150.00
- NB/T 20442.6-2024Guidelines for Periodic Safety Assessment of Nuclear Power Plants - Part 6: Actual Status of Structures, Systems and Components$384.00
- NB/T 20442.7-2017Guideline of periodic safety review for nuclear power plants - Part 7: Experience feedback$105.00
- NB/T 20442.7-2024Guidelines for Periodic Safety Assessment of Nuclear Power Plants - Part 7: Experience Feedback$304.00
- NB/T 20442.8-2017Guideline of periodic safety review for nuclear power plants - Part 8: Ageing$120.00
- NB/T 20442.9-2017Guideline of periodic safety review for nuclear power plants - Part 9: Deterministic safety analysis$135.00
- NB/T 20443-2017Rules for radiation protection in operational nuclear power plants$285.00
- NB/T 20444-2017Analysis criterion of the design basis accident source terms for pressurized water reactor nuclear power plant$240.00
- NB/T 20445.1-2017Level 2 probabilistic safety assessment for nuclear power plant applications - Part 1: General requirements$180.00
- NB/T 20445.2-2017Level 2 probabilistic safety assessment for nuclear power plant applications - Part 2: Internal events at-power$450.00
- NB/T 20445.3-2021Level 2 probabilistic safety assessment for nuclear power plant applications - Part 3: Internal events at low power and shutdown$465.00
- NB/T 20445.4-2023Level 2 Probabilistic Safety Assessment Applied to Nuclear Power Plants - Part 4: External Events$180.00
- NB/T 20446-2017Main steam system design requirement of pressurized water reactor nuclear power plant$120.00
- NB/T 20447-2017Overpressure protection of low pressure systems connected to the reactor coolant pressure boundary$135.00
- NB/T 20448-2017Verification and validation for system and software in nuclear power plants$2,300.00
- NB/T 20449-2017Design criteria for fuel oil system of the emergency diesel generator of nuclear power plant$225.00
- NB/T 20450.1-2017Alternative welding code for mechanical components of PWR nuclear islands - Part 1: General requirements$85.00
- NB/T 20450.2-2017Alternative welding code for mechanical components of PWR nuclear islands - Part 2: welding filler materials$135.00
- NB/T 20450.3-2017Alternative welding code for mechanical components of PWR nuclear islands - Part 3: Welding procedure qualification$1,070.00
- NB/T 20450.4-2017Alternative welding code for mechanical components of PWR nuclear islands - Part 4: Production welds and heat treatment$375.00
- NB/T 20450.5-2017Alternative welding code for mechanical components of PWR nuclear islands - Part 5: Examination of production welds$420.00
- NB/T 20451-2017General requirements of construction informatization management for nuclear power project$315.00
- NB/T 20452-2017Technical regulations of safety management in nuclear power engineering$740.00
- NB/T 20453-2017Technical regulation for installation of primary reactor coolant piping in passive pressurized water reactor nuclear power plant$195.00
- NB/T 20454-2017Requirements on training system of nuclear power plants$225.00
- NB/T 20455-2017Criteria for operational performance assessment of nuclear power plants$530.00
- NB/T 20456-2017Technical specification for steel-concrete structure construction and acceptance of nuclear power plant$390.00
- NB/T 20457-2017Technical specification for steel containment vessel components manufacturing and acceptance in passive pressurized water reactor nuclear power plant$390.00
- NB/T 20458-2017Cleanliness degree management regulation for buildings during construction period of PWR nuclear power plants$120.00
- NB/T 20459-2017Technical specification for steel containment vessel bottom head grouting in passive PWR nuclear power plant$180.00
- NB/T 20460-2017Technical regulations of safety management in nuclear power engineering$2,210.00
- NB/T 20461-2017Design criteria of spent fuel dry storage installation for pressurized water reactor$360.00
- NB/T 20462-2017Thermal analysis of spent fuel dry storage installation for pressurized water reactor$240.00
- NB/T 20463-2017Classification for the items of spent fuel transportation and dry storage facilities for pressurized water reactor$225.00
- NB/T 20464-2017In-service helium leak testing of steam generator tube for nuclear power plant$135.00
- NB/T 20465-2017Obsolete item management in nuclear power plants$255.00
- NB/T 20466-2017Sludge lancing and televisual inspection for tube sheet in the secondary side of vertical steam generator$120.00
- NB/T 20467-2017Commissioning technical guideline for reactor protection system of PWR nuclear power plant$135.00
- NB/T 20468-2017Load rejection test guideline for pressurized water reactor of nuclear power plant$165.00
- NB/T 20469-2017Technical guideline for loss of offsite power test of PWR nuclear power plant$105.00
- NB/T 20469-2023Technical Guidelines for Testing of Pressurized Water Reactor Nuclear Power Plants Loss of Off-site Power Supply$240.00
- NB/T 20470-2017Analysis criteria for postulated siting accident source term for nuclear power plant$150.00
- NB/T 20471-2017Design criteria for Service Water System of passive pressurized water reactor nuclear power plants$150.00
- NB/T 20472-2017Design criteria for piping layout of nuclear island process systems of pressurized water reactor nuclear power plants$135.00
- NB/T 20473-2017Design criteria for compressed air startup system of the emergency diesel generator of nuclear power plant$150.00
- NB/T 20474-2017Design criteria for control air systems in the nuclear power plant$90.00
- NB/T 20475-2017Qualification and acceptance of boron based metallic neutron absorbers for nuclear criticality control for dry cask storage systems and transportation packaging$105.00
- NB/T 20476.10-2019Nuclear power plant operation permit continuation. Part 10: Pre-stressed concrete containment time aging analysis$135.00
- NB/T 20476.11-2019Nuclear Power Plant Operation Permit Extension Part 11: Supplementary Guide to Final Safety Analysis Report$90.00
- NB/T 20476.12-2019Nuclear Power Plant Operation Permit Renewal Part 12: Guidelines for Compiling Applications$210.00
- NB/T 20476.5-2018Operating license extension of nuclear power plants - Part 5: environmental impact assessment$240.00
- NB/T 20476.6-2019Nuclear Power Plant Operation Permit Continuation Part 6: Analysis of Reactor Pressure Vessel Time Limit Aging$165.00
- NB/T 20476.7-2019Nuclear Power Plant Operation Permit Renewal Part 7: Steam Generator Time Aging Analysis$105.00
- NB/T 20476.8-2019Nuclear Power Plant Operation Permit Extension Part 8: Metal Fatigue Analysis$150.00
- NB/T 20476.9-2019Nuclear Power Plant Operation Permit Renewal Part 9: Time Limitation Analysis of Electrical and Instrument Control Equipment$105.00
- NB/T 20477.1-2018Squib valve for nuclear power plant - Part 1: Valve design$165.00
- NB/T 20477.2-2018Squib valve for nuclear power plant - Part 2: Valve qualification$105.00
- NB/T 20477.3-2018Squib valve for nuclear power plant - Part 3: Cartridge design$105.00
- NB/T 20477.4-2018Squib valve for nuclear power plant - Part 4: Cartridge qualification$180.00
- NB/T 20478.1-2018The technical specification of reactor pressure vessel sealing ring for pressurized water reactor nuclear power plant - Part 1: O-ring$165.00
- NB/T 20478.2-2018The technical specification for reactor pressure vessel sealing ring of pressurized water reactor nuclear power plants - Part 2: C-ring$315.00
- NB/T 20479.1-2018Welds nondestructive testing for nuclear power plant structure modules and mechanical modules - Part 1: Ultrasonic testing$435.00
- NB/T 20479.2-2018Welds nondestructive testing for nuclear power plant structure modules and mechanical modules - Part 2: Radiographic testing$315.00
- NB/T 20479.3-2018Welds nondestructive testing for nuclear power plant structure modules and mechanical modules - Part 3: Penetrant testing$180.00
- NB/T 20479.4-2018Welds nondestructive testing for nuclear power plant structure modules and mechanical modules - Part 4: Magnetic particle testing$195.00
- NB/T 20479.5-2018Welds nondestructive testing for nuclear power plant structure modules and mechanical modules - Part 5: Visual testing$135.00
- NB/T 20480-2018Technical requirement for flushing of primary system in PWR nuclear power plants$70.00
- NB/T 20481-2018Rules for design and fabrication of the primary coolant piping in pressurized water reactor nuclear power plants$195.00
- NB/T 20482-2018Specification for design and construction of steel containment vessel of nuclear power plant of PWR$1,625.00
- NB/T 20483-2018Code of engineering geophysical exploration for nuclear power plants$450.00
- NB/T 20484-2018Nuclear steam supply system heat balance test of pressurized water reactor nuclear power plant$120.00
- NB/T 20485-2018Design and test requirements for emergency diesel generator sets of nuclear power plants$260.00
- NB/T 20486-2018General technical specification for water filter element used in the nuclear power plant$135.00
- NB/T 20487-2018Methodology for performance of internal fire probabilistic safety assessment for nuclear power plants$1,070.00
- NB/T 20488-2018Performance based seismic design method for structures in nuclear facilities$360.00
- NB/T 20489-2018Method of event root cause analysis in nuclear power plants$180.00
- NB/T 20490-2018Monitoring requirement for deposited source term of activated corrosion product during outage of PWR nuclear power plant$180.00
- NB/T 20491-2018Thermal insulation of auxiliary piping and equipment in PWR nuclear power plant$455.00
- NB/T 20492-2018Storage, drying and use of the welding materials for nuclear power plant$90.00
- NB/T 20493-2018Qualification of thermocouples important to safety in nuclear power plants$255.00
- NB/T 20494-2018Technical specification for deformation monitoring for building and structure of nuclear power plant$255.00
- NB/T 20495-2018Code for design of buildings in nuclear power plants$420.00
- NB/T 20496-2018Management regulation for large hoisting and conveying machinery on nuclear power plant worksite$105.00
- NB/T 20497-2018Technical standards for the design of rainwater drainage of nuclear power plant$255.00
- NB/T 20498-2018Management regulation for large construction facilities on nuclear power engineering worksite$195.00
- NB/T 20499-2018Technical specification for design of window type venting devices in nuclear power plants$285.00
- NB/T 20500-2018Technical specification for erection and acceptance of pipe insulation in PWR nuclear power plants$225.00
- NB/T 20500-2025Technical Specifications for Insulation Installation and Acceptance of Piping in Pressurized Water Reactor Nuclear Power Plants$240.00
- NB/T 20501-2018Nuclear power plant structural module manufacturing and acceptance technical regulations$480.00
- NB/T 20502-2018Technical specification for installation and acceptance of personnel airlock and equipment hatch in PWR nuclear power plant$255.00
- NB/T 20503-2018Technical specification for investigation of concrete aggregate in nuclear power plants$300.00
- NB/T 20504-2018Technical specification for micro-network survey of nuclear island engineering in nuclear power plants$285.00
- NB/T 20505-2018Requirements for inservice inspection of prestressed concrete containment structures in nuclear power plants$180.00
- NB/T 20506-2018Technical requirements for thread inserts used in nuclear island mechanical components of nuclear power plants$165.00
- NB/T 20507-2018Design criteria for startup feedwater system of pressurized water reactor nuclear power plant$105.00
- NB/T 20508-2018Eddy current profilometry of steam generator tubing expansion$195.00
- NB/T 20509-2018Unit load swing test for pressurized water reactor nuclear power plant$85.00
- NB/T 20510-2018Data elements for nuclear fuel assembly management of PWR nuclear power plants$390.00
- NB/T 20511-2018Specification for nuclear power technology readiness assessment$330.00
- NB/T 20512.1-2018Operating licenses extension of nuclear power plant - Part 1: Screening of aging management review and identification of time-limited aging analysis$330.00
- NB/T 20512.1-2023Renewal of Nuclear Power Plant Operating License - Part 1: Selection of Aging Management Review Objects and Identification of Time Limit Aging Analysis$819.00
- NB/T 20512.2-2018Operating license extension of nuclear power plant - Part 2: mechanical components aging management review$255.00
- NB/T 20512.2-2023Renewal of Nuclear Power Plant Operating License - Part 2: Review of Aging Management of Mechanical Equipment$579.00
- NB/T 20512.3-2018Operating license extension of nuclear power plants - Part 3: Aging management review for electrical and instrumentation and control components$210.00
- NB/T 20512.3-2023Nuclear power plant operating license renewal - Part 3: Review of aging management of electrical and instrumentation and control equipment$459.00
- NB/T 20512.4-2018Operating license extension of nuclear power plants - Part 4: Ageing management review for structures and structural components$285.00
- NB/T 20512.4-2023Renewal of Nuclear Power Plant Operating License - Part 4: Review of Aging Management of Structures and Structure Components$699.00
- NB/T 20513.1-2018Guideline of periodic safety review for nuclear power plants - Part 1: General requirements$150.00
- NB/T 20514-2018Specification for design and fabrication of nuclear plate heat exchanger$270.00
- NB/T 20515-2018Analysis criteria for spent fuel assembly storage criticality safety of pressurized water reactor nuclear power plants$105.00
- NB/T 20516-2018Design basis for protection of light water reactor nuclear power plants against the effects of postulated pipe rupture$725.00
- NB/T 20517-2018Performance objectives and assessment criterion on training area of nuclear power plant$210.00
- NB/T 20518-2018Ageing management guideline of steel containment vessel in nuclear power plants$210.00
- NB/T 20519-2018Technical requirements for ageing mechanisms analysis of nuclear power plant equipment$150.00
- NB/T 20520-2018General requirements for metal hose assemblies in nuclear power plant$420.00
- NB/T 20521-2018Screening and classification guidelines for ageing and life management of nuclear power plants equipment$210.00
- NB/T 20522-2018Eddy current examination for in-core neutron flux thimble tubes of nuclear power plant$150.00
- NB/T 20523-2018Requirements for management of nuclear power document and records$500.00
- NB/T 20524-2018Design criteria for safe shutdown of pressurized water reactor nuclear power plants$165.00
- NB/T 20525-2018Evaluation test requirement of low alloy steel heat affected zone at cladding overlap areas$135.00
- NB/T 20526-2018Hydrostatic shop test requirement for steam generator of pressurized water reactor$105.00
- NB/T 20527-2018Flow accelerated corrosion management guideline for primary loop piping of pressurized heavy water reactor nuclear power plants$265.00
- NB/T 20528-2018Leak-before-break acoustic emission monitoring of pressure piping in PWR nuclear power plants$150.00
- NB/T 20529-2018Radiation protection design criterion for pressurized water reactor nuclear power plants$345.00
- NB/T 20530-2018Design basis source term analysis criteria of pressurized water reactor nuclear power plants for operation states$150.00
- NB/T 20531-2018Atmospheric dispersion factor analysis method for main control room radiological habitability assessments at nuclear power plants$265.00
- NB/T 20532-2018Commissioning technical guidelines for fire protection system of nuclear power plant$465.00
- NB/T 20533-2018Technical guideline for commissioning steam bypass system of nuclear power plant$135.00
- NB/T 20534-2018Commissioning technical guideline for fuel handling and storage system of pressurized water reactor nuclear power plant$270.00
- NB/T 20535-2018Technical guideline for the passivation of the primary circuit of nuclear power plants$105.00
- NB/T 20536-2018Boron based metallic neutron absorbers for nuclear criticality control for storage and transportation of spent fuel$210.00
- NB/T 20537-2018Critical heat flux experiment requirements for fuel assemblies of PWR nuclear power plants$105.00
- NB/T 20538-2018Zirconium alloy tubes used as fuel cladding for pressurized water reactor nuclear power plants$240.00
- NB/T 20539-2018Technical specification for installation of precast concrete irregular shape volute in nuclear power plants$150.00
- NB/T 20542-2019Criteria for design of spent fuel wet storage facilities in pressurized water reactor nuclear power plants$240.00
- NB/T 20543-2019Guidelines for corrosion management of nuclear power plants$285.00
- NB/T 20544-2019Nuclear power engineering project energy-saving evaluation methods and parameters$180.00
- NB/T 20545-2019Technical requirements for transfer devices in radioactive wet waste sites of nuclear power plants$180.00
- NB/T 20546-2019Technical Regulations for Manufacturing and Acceptance of Mechanical Modules for PWR Nuclear Power Plant$300.00
- NB/T 20547-2019Technical Regulations for Nuclear Power Engineering Blasting Safety Monitoring$270.00
- NB/T 20548-2019Technical specification for design of anchor bolts in nuclear power plants$420.00
- NB/T 20549-2019Design code for durability of concrete structures related to nuclear safety$465.00
- NB/T 20550-2019Technical guidelines for debugging of digital control system of safety level for PWR nuclear power plant$165.00
- NB/T 20551-2019Nuclear power plant pipeline ice plug freezing isolation$225.00
- NB/T 20552-2019Supervision of critical boron concentration in the core of PWR nuclear power plant$150.00
- NB/T 20553-2019Old internal components of PWR nuclear power plant$240.00
- NB/T 20554-2019Qualification requirements for nuclear fuel operation personnel in nuclear power plants$240.00
- NB/T 20555-2019Nuclear Power Plant Aging and Life Management Terminology$420.00
- NB/T 20556-2019Calculation method for excess reactivity of heavy water reactor core$105.00
- NB/T 20557-2019Guidelines for probabilistic safety evaluation data analysis of nuclear power plants$330.00
- NB/T 20558-2019Guidelines for fault tree analysis of nuclear power plants$390.00
- NB/T 20559-2019Guidelines for sequence analysis of nuclear power plant events$240.00
- NB/T 20560.1-2021Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant - Part 1: General technical requirements$255.00
- NB/T 20560.2-2021Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plants - Part 2: Technical requirements for debris source walkdown$180.00
- NB/T 20560.3-2021Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plants - Part 3: Technical requirements for upstream effects analysis$300.00
- NB/T 20560.4-2021Design and Performance Evaluation of Filters for Emergency Core Cooling System of PWR Nuclear Power Plant - Part 4: Technical Requirements for Equipment Design$90.00
- NB/T 20560.5-2021Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plants - Part 5: Technical requirements for debris head loss test$180.00
- NB/T 20560.6-2019Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant-Part 6: Technical requirements for chemical effects testing$195.00
- NB/T 20560.7-2021Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant - Part 7: Technical requirements for downstream (in-vessel) effects test$315.00
- NB/T 20560.8-2023Filter Design and Performance Evaluation for Emergency Core Cooling System of Pressurized Water Reactor Nuclear Power Plant - Part 8: Technical Requirements for Analysis of Downstream Effects (External Core)$120.00
- NB/T 20561-2019Test method for beta irradiation of non-metallic material parts of nuclear power plants$180.00
- NB/T 20562-2019Non-destructive testing of sealed welding seam of pressure shell of control rod drive mechanism$210.00
- NB/T 20563-2019Eddy current detection of anti-vibration strip of heat transfer tube of steam generator$165.00
- NB/T 20564-2019Poolside inspection of irradiated fuel assemblies for PWR nuclear power plants$135.00
- NB/T 20565-2019Zirconium alloy bar and wire for fuel assembly of PWR nuclear power plant$195.00
- NB/T 20566-2019Code for seismic design of pressurized water reactor fuel components and related components$180.00
- NB/T 20567-2019Technical specification for construction and statistical analysis of meteorological observation system of nuclear power plants$465.00
- NB/T 20568-2019Residual leakage test in nuclear power plant main control room$300.00
- NB/T 20569-2019Guideline for debugging of passive core cooling system of PWR nuclear power plant$300.00
- NB/T 20570-2019Guideline for debugging of passive containment cooling system of PWR nuclear power plant$165.00
- NB/T 20571-2019Commissioning technical guideline for variable frequency canned-motor reactor coolant pump of PWR nuclear power plant$150.00
- NB/T 20572-2019Technical guidelines for debugging of current-limiting orifice plates in nuclear power plants$165.00
- NB/T 20573-2019Technical guidelines for debugging of main steam isolation valve in PWR nuclear power plant$150.00
- NB/T 20574-2019Terminology for debugging of PWR nuclear power plant$465.00
- NB/T 20575-2019Technical requirements for the repair of welded seams of the tube and tube sheets of the heat exchangers of the 2nd and 3rd stage heat exchangers of PWR nuclear power plants$150.00
- NB/T 20576-2019Analysis of neutron fluence rate in reactor pressure vessel of PWR nuclear power plant$285.00
- NB/T 20577-2019Technical specification for installation and acceptance of shielded main coolant pump for PWR nuclear power plant$530.00
- NB/T 20578-2019Zirconium alloy strip for fuel assembly of PWR nuclear power plant$150.00
- NB/T 20579-2021Reference index for commissioning of nuclear power plant construction project$830.00
- NB/T 20580.1-2021Estimated quota of nuclear power plant construction project - Part 1: Civil engineering of nuclear island$4,250.00
- NB/T 20580.2-2021Budget estimation norm of nuclear power plant construction project works - Part 2: Mechanical equipment installation engineering for nuclear island$2,510.00
- NB/T 20580.3-2021Estimated quota of nuclear power plant construction project - Part 3: Nuclear island pipeline installation project$9,500.00
- NB/T 20580.4-2021Budget estimation norm of nuclear power plant construction project works - Part 4: Ventilation and air-conditioning installation engineering for nuclear island$1,070.00
- NB/T 20580.5-2021Budget estimation norm of nuclear power plant construction project works - Part 5: Electrical equipment installation engineering for nuclear island$1,100.00
- NB/T 20580.6-2021Budget estimation norm of nuclear power plant construction project works - Part 6: Automation control instrument and communication equipment installation engineering for nuclear island$2,375.00
- NB/T 20580.7-2021Estimated quota of nuclear power plant construction project - Part 7: Conventional island construction project$5,150.00
- NB/T 20580.8-2021Budget estimation norm of nuclear power plant construction project works - Part 8: Thermal equipment installation engineering for conventional island$2,525.00
- NB/T 20580.9-2021Budget estimation norm of nuclear power plant construction project works - Part 9: Electrical equipment installation engineering for conventional island$4,835.00
- NB/T 20581-2021Technical guidelines for commissioning of steam generator blowdown systems in pressurized water reactor nuclear power plants$120.00
- NB/T 20582-2021Commissioning technical guideline for reactor boron and water makeup system of PWR nuclear power plants$195.00
- NB/T 20583-2021Technical guideline for loss of control power test of PWR nuclear power plants$105.00
- NB/T 20584-2021Technical guideline for secondary circuit vacuum tightness test of PWR nuclear power plants$90.00
- NB/T 20585-2021Guideline for trend analysis of operating events in nuclear power plants$195.00
- NB/T 20586-2021Technical guideline of hydrostatic testing for nuclear pressure vessels in pressurized water reactor plants$255.00
- NB/T 20587-2021Design criteria for passive containment heat removal system of pressurized water reactor nuclear power plants$135.00
- NB/T 20588-2021Code for design and manufacture of sump valves for nuclear power plants$360.00
- NB/T 20589-2021Design and manufacturing specification of pressurizer dedicated depressurization valve under severe accident$270.00
- NB/T 20590-2021Technical specification for PWR nuclear hydraulic snubber$300.00
- NB/T 20591-2021Design criteria for protection against the effects of compartment flooding in light water reactor plants$255.00
- NB/T 20592-2021Experiment standard for flow-induced vibration of PWR internals model$285.00
- NB/T 20593-2021Design criteria of electrical interlocking for important safety functions of nuclear power plants$180.00
- NB/T 20594-2021Function analysis and allocation criteria of nuclear power plant control room$240.00
- NB/T 20595-2021Criteria for thermal tests on control rod drive line of PWR nuclear power plants$180.00
- NB/T 20596-2021Radiation protection seal criterion of holes in the wall of controlled area for PWR nuclear power plant$120.00
- NB/T 20597-2021Regulation for format, content and depth of fire hazard analysis report of nuclear power plants$285.00
- NB/T 20599-2021Qualification of safety class instrument valves for nuclear power plants$210.00
- NB/T 20600-2021Design and fabrication specification for fuel assembly and associated core components in HPR1000 nuclear power plants$1,385.00
- NB/T 20601-2021Design and evaluation of isolation devices for important safety instruments and control systems in nuclear power plants$195.00
- NB/T 20602-2021Design requirements for industrial television systems in nuclear power plants$240.00
- NB/T 20603-2021Specification for installation of air deflector in the steel passive containment cooling system of pressurized-water reactor of nuclear power plant$360.00
- NB/T 20604-2021Technical code for aquatic organism radiological impact assessment of nuclear power plant under normal operational state$255.00
- NB/T 20605-2021Quality assurance general requirements for suppliers of nuclear power plant$240.00
- NB/T 20606-2021Specifications of underwater maintenance for reactor vessel internals of PWR nuclear power plant$455.00
- NB/T 20607-2021Quality assurance supervision for maintenance in nuclear power plant$315.00
- NB/T 20608-2021Technical specification for automatic voltage control of nuclear power plant$240.00
- NB/T 20609-2021Management requirements of welding in nuclear power plants$345.00
- NB/T 20610-2021Sludge height measurement for the secondary side of steam generator tube sheet in nuclear power plant based on eddy current testing technique$120.00
- NB/T 20611-2021Eddy current testing for expansion transition section of steam generator tube in nuclear power plant$240.00
- NB/T 20612-2021The testing and evaluation of small branch piping vibration in nuclear power plant$345.00
- NB/T 20613-2021Technical guidelines for commissioning chilled water system of PWR nuclear power plant$195.00
- NB/T 20614-2021Technical guideline for commissioning of ventilation system of PWR nuclear power plant$135.00
- NB/T 20615-2021Implementation guideline for technology readiness assessment in the research and development of nuclear power$485.00
- NB/T 20616-2021Guidelines for the nuclear safety culture development of nuclear power plants$285.00
- NB/T 20618-2021The development criteria of emergency operating guidelines for pressurized water reactor nuclear power plant$345.00
- NB/T 20619-2021Design criteria for liquid radioactive waste processing system of pressurized water reactor nuclear power plants$315.00
- NB/T 20620-2021Design criteria for gaseous radioactive waste processing system of pressurized water reactor nuclear power plants$465.00
- NB/T 20621-2021Design criteria for solid radioactive waste processing system of pressurized water reactor nuclear power plants$470.00
- NB/T 20622-2021Technical specification of formwork construction for nuclear power project$330.00
- NB/T 20623-2021Technical specification of reinforcement bar construction for nuclear power project$240.00
- NB/T 20624-2021Technical specification for underground waterproofing of pressurized water reactor nuclear power plant$270.00
- NB/T 20626-2021Selection and use of industrial digital equipment for limited functions of safety-important instrumentation and control systems in nuclear power plants$455.00
- NB/T 20627-2021Technical code for seismic isolation design of nuclear power plant structure$300.00
- NB/T 20628-2021Evaluation criteria for nuclear power plants against malicious collisions of large commercial aircraft$240.00
- NB/T 20629-2021Risk-Informed Approach to Optimization of Completion Time for Nuclear Power Plant Technical Specifications$180.00
- NB/T 20630-2021Process and requirements of risk-informed method for in-service inspection optimization of nuclear power plant pipeline welds$210.00
- NB/T 20631-2021Development and implementation of extensive damage mitigation guidelines for nuclear power plants$195.00
- NB/T 20632-2023The process and requirements of risk-informed method for periodic test cycle optimization of nuclear power plants$180.00
- NB/T 20633-2023Development method for secondary probabilistic safety assessment of nuclear power plants$270.00
- NB/T 20634-2023Nuclear Power Plant Fire Barrier Management$255.00
- NB/T 20635-2023Guidelines for Preventing Foreign Objects in Nuclear Power Plants$465.00
- NB/T 20636-2023Safety assessment method for extra core nuclear criticality in pressurized water reactor nuclear power plants$165.00
- NB/T 20637-2023Seismic Margin Evaluation Method Based on Probabilistic Safety Evaluation for Nuclear Power Plant$575.00
- NB/T 20638-2023Guidelines for condition-based maintenance management in nuclear power plants$135.00
- NB/T 20639-2023Nature of Expenses and Project Division Guidelines for Nuclear Power Plant Construction Projects$515.00
- NB/T 20640-2023Nuclear Power Plant Reliability, Availability, Maintainability and Safety Management Code$875.00
- NB/T 20641-2023Guidelines for Boric Acid Corrosion Management in Nuclear Power Plants$180.00
- NB/T 20642-2023Guidelines for Reliability Analysis of Nuclear Power Plant Personnel$240.00
- NB/T 20643-2023Nuclear power plant equipment management classification technical guideline$240.00
- NB/T 20644-2023Guidelines for the Analysis of Initiating Events in Nuclear Power Plants$270.00
- NB/T 20645-2023Guidelines for the preparation of decommissioning plans for nuclear power plants$255.00
- NB/T 20646-2023Investigation of decommissioned source items in nuclear power plants and estimation of radioactive material storage$135.00
- NB/T 20647-2023General Requirements for Decommissioning of Nuclear Power Plants$135.00
- NB/T 20648-2023Guidelines for Failure Modes, Effects and Hazard Analysis of Nuclear Power Plant Systems$650.00
- NB/T 20649-2023Guidelines for Reliability-Centric Maintenance Analysis of Nuclear Power Plants$210.00
- NB/T 20650-2023Nuclear power plant operating production data management requirements$500.00
- NB/T 20651-2023Nuclear Power Plant Master Data Management Guidelines$225.00
- NB/T 20652-2023Provisions on division of nuclear power projects by subsection$545.00
- NB/T 20653-2023Code for design and manufacture of containment mechanical penetrations for pressurized water reactor nuclear power plants$165.00
- NB/T 20654-2023Technical guidelines for commissioning of containment sprinkler system in pressurized water reactor nuclear power plant$120.00
- NB/T 20655-2023Commissioning Guidelines for Safety Injection System of Pressurized Water Reactor Nuclear Power Plant$165.00
- NB/T 20656-2023Technical guidelines for rod control and rod position system commissioning in pressurized water reactor nuclear power plants$120.00
- NB/T 20657-2023Technical requirements for core power distribution measurement test of pressurized water reactor nuclear power plant$135.00
- NB/T 20658-2023Technical requirements for on-line core monitoring system of pressurized water reactor nuclear power plant$165.00
- NB/T 20659-2023Technical regulations for installation of shaft-sealed reactor coolant pumps in pressurized water reactor nuclear power plants$165.00
- NB/T 20660-2023Technical Guidelines for Commissioning of Reactor Coolant System in Pressurized Water Reactor Nuclear Power Plant$270.00
- NB/T 20661-2023Technical Regulations for Installation of Reactor Pressure Vessels in Pressurized Water Reactor Nuclear Power Plants$315.00
- NB/T 20662-2023Classification of working conditions in pressurized water reactor nuclear power plants$165.00
- NB/T 20663-2023Technical specification for installation of ventilation system for nuclear island of pressurized water reactor nuclear power plant$270.00
- NB/T 20664-2023Technical guidelines for commissioning cold source system of pressurized water reactor nuclear power plant nuclear island$150.00
- NB/T 20665-2023Design criteria for interface between nuclear steam supply system and steam turbine building in pressurized water reactor nuclear power plant$120.00
- NB/T 20666-2023Design criteria for nuclear sampling system in pressurized water reactor nuclear power plant$135.00
- NB/T 20667-2023General Rules for Internal Disaster Protection Design of PWR Nuclear Power Plant$390.00
- NB/T 20668-2023General Rules for Design of External Disaster Protection in Pressurized Water Reactor Nuclear Power Plants$360.00
- NB/T 20669-2023Design criteria for emergency core cooling system of pressurized water reactor nuclear power plant$210.00
- NB/T 20670-2023Technical guidelines for commissioning of emergency water supply system in pressurized water reactor nuclear power plants$120.00
- NB/T 20671-2023Design criteria for emergency boronization system in pressurized water reactor nuclear power plant$135.00
- NB/T 20672-2023Technical regulations for installation of steam generators in pressurized water reactor nuclear power plants$255.00
- NB/T 20673-2023Design criteria for steam generator blowdown system of pressurized water reactor nuclear power plant$135.00
- NB/T 20674-2023Technical regulations for the installation of main piping, surge pipes and their supports in pressurized water reactor nuclear power plants$195.00
- NB/T 20675-2023Design criteria for leakage monitoring system of main steam piping in pressurized water reactor nuclear power plant$120.00
- NB/T 20676-2023Design criteria for automatic pressure relief system in pressurized water reactor nuclear power plant$135.00
- NB/T 20677-2023Nuclear power plant lighting design specifications$405.00
- NB/T 20678-2023Qualification of optical cables, connectors and splices for nuclear power plant safety systems$210.00
- NB/T 20679-2023Ultrasonic and eddy current inspection of J-shaped welds of reactor pressure vessel top cover penetration parts$165.00
- NB/T 20680-2023Technical Guidelines for Commissioning of Passive Waste Heat Removal Systems on the Secondary Side of Pressurized Water Reactor Nuclear Power Plants$165.00
- NB/T 20681-2023Technical Guidelines for Commissioning of Shaft Seal Main Pumps in Pressurized Water Reactor Nuclear Power Plants$135.00
- NB/T 20682-2023Technical Guidelines for Debugging Radiation Monitoring Systems of Pressurized Water Reactor Nuclear Power Plants$180.00
- NB/T 20683-2023Technical Guidelines for Debugging Seismic Instrumentation Systems of Pressurized Water Reactor Nuclear Power Plants$120.00
- NB/T 20684.1-2023Regulations on the management of anti-corrosion construction in nuclear power plants - Part 1: Quality assurance of anti-corrosion construction$165.00
- NB/T 20684.2-2023Regulations on the management of anti-corrosion construction in nuclear power plants - Part 2: Requirements for anti-corrosion personnel$180.00
- NB/T 20685-2023Management Guidelines for Critical and Sensitive Equipment in Nuclear Power Plants$135.00
- NB/T 20686-2023Technical requirements for chemical composition control of consumables in pressurized water reactor nuclear power plants$90.00
- NB/T 20687-2023Requirements for measures to retain molten core in pressure vessels after severe accidents in pressurized water reactor nuclear power plants$315.00
- NB/T 20688-2023Transient analysis requirements for reactor coolant system design in pressurized water reactor nuclear power plants$120.00
- NB/T 20689-2023Design criteria for the overall layout of nuclear islands in pressurized water reactor nuclear power plants$195.00
- NB/T 20690-2023Design criteria for cooling and purification systems of spent fuel pools in pressurized water reactor nuclear power plants$150.00
- NB/T 20691-2023Content and in-depth provisions of the special chapter on the design of occupational disease protection facilities in nuclear power plants$150.00
- NB/T 20692-2023Guidelines for the establishment and application of maintenance rules for nuclear power plants$270.00
- NB/T 20693-2023Format, content and in-depth provisions of the special article on nuclear power plant safety facility design$210.00
- NB/T 20694-2023Analysis requirements for main steam pipeline breakage accidents in pressurized water reactor nuclear power plants$150.00
- NB/T 20695-2023Identification of external neutron detectors in nuclear power plants$270.00
- NB/T 20696-2023Regular inspection and testing of catalytic plate passive hydrogen recombiners in nuclear power plants$150.00
- NB/T 20697-2023Design specifications for on-site emergency facilities in nuclear power plants$405.00
- NB/T 20698-2023Technical requirements for reactive control rod compensation in pressurized water reactor nuclear power plants$120.00
- NB/T 20699-2023Evaluation method for flow stability of pressurized water reactor nuclear power plant reactors$210.00
- NB/T 20700-2023Guidelines for application of fuel burnup credit system for pressurized water reactor nuclear power plants$195.00
- NB/T 20701-2023Specification for preparation of in-service inspection program for nuclear power plants$210.00
- NB/T 20702-2023Guidelines for the use of industrial safety signs in nuclear power plants$530.00
- NB/T 20703-2023Chemical control performance indicators of pressurized water reactor nuclear power plants$390.00
- NB/T 20704-2023Guidelines for long-term asset management of operating nuclear power plants$390.00
- NB/T 20705-2023Radiation protection and monitoring requirements for nuclear power plant decommissioning$255.00
- NB/T 20706-2023Nuclear power plant unit performance index management guidelines$330.00
- NB/T 20707-2023Phased array ultrasonic testing of ferritic steel welds in nuclear power plants$375.00
- NB/T 20708-2023Fuel rod performance analysis methods and model requirements for pressurized water reactor nuclear power plants$150.00
- NB/T 20709-2023Technical specification for digitization of radiographic films of nuclear power plants$210.00
- NB/T 20710-2023Nuclear power plant decommissioning cost compilation method$420.00
- NB/T 20711-2023Technical Guidelines for Commissioning of Reactor Refueling Pools and Spent Fuel Pool Cooling and Treatment Systems of Pressurized Water Reactor Nuclear Power Plants$90.00
- NB/T 20712-2023Guidelines for Adding Zinc to the Primary Circuit Coolant of Pressurized Water Reactor Nuclear Power Plants$240.00
- NB/T 20713-2024Guidelines for Corrosion Control of Nuclear Power Plant Equipment$315.00
- NB/T 20714-2024Management of radioactive waste from nuclear power plant decommissioning$150.00
- NB/T 20715-2024Decontamination requirements for radioactive items in decommissioned nuclear power plants$165.00
- NB/T 20716-2024Requirements for the removal of radioactive items from decommissioned nuclear power plants$85.00
- NB/T 20717-2024Information collection and management of nuclear power plant decommissioning projects$105.00
- NB/T 20718-2024Guidelines for maintenance and repair of burst valves for nuclear power plants$240.00
- NB/T 20719-2024Guidelines for monitoring and defect handling of important structures in nuclear power plants$465.00
- NB/T 20720-2024Design specification for power supply system of control rod drive mechanism of pressurized water reactor nuclear power plant$195.00
- NB/T 20721-2024Unified Standards for the Service Life of Nuclear Power Plant Structural Design$105.00
- NB/T 20722-2024Nuclear Safety Level 3 High Density Polyethylene Pipe Design Specifications$710.00
- NB/T 20723-2024Guidelines for maintenance support operations at nuclear power plants$180.00
- NB/T 20724-2024Criteria for Classification of Availability of Nuclear Power Plant Equipment$180.00
- NB/T 20725-2024Probabilistic fracture mechanics evaluation method for pressure equipment in nuclear power plants$255.00
- NB/T 20726-2024Technical Guidelines for Commissioning Loose Parts and Vibration Monitoring Systems in Nuclear Power Plants$90.00
- NB/T 20727-2024Guidelines for commissioning emergency habitable systems in nuclear power plant main control rooms$105.00
- NB/T 20728-2024Guidelines for trend analysis of low-level and near miss incidents in nuclear power plants$210.00
- NB/T 20729-2024Guidelines for Risk Management in Nuclear Power Plant Operations$300.00
- NB/T 20733-2025Dynamic rod worth measurement test method of pressurized water reactor nuclear power plants$105.00
- NB/T 20739-2025Technology for Thermal Aging Condition Detection and Evaluation of Cast Stainless Steel in Nuclear Power Plants$285.00
- NB/T 20740-2025Phase-Array Ultrasonic Inspection of Welds in Austenitic Stainless Steel Pipes$285.00
- NB/T 20741-2025Inspection of Penetrating Components in Reactor Pressure Vessel Bottom Heads$240.00
- NB/T 20743-2025Depleted Zinc Acetate for Pressurized Water Reactor Nuclear Power Plants$240.00
- NB/T 25001-2011Quality Assurance in Siting for Nuclear Power Plants$465.00
- NB/T 25002-2011Design Code for Marine Construction in Nuclear Power Plant$2,600.00
- NB/T 25003-2011Regulations for Environmental Impact Assessment Report in Siting Phases of Nuclear Power Plants$405.00
- NB/T 25004-2011Performance test code for moisture separator reheaters$720.00
- NB/T 25005-2011The Code of Welding Repair of Steam Turbine Cylinder in Nuclear Power Plant$135.00
- NB/T 25006-2011The Code of Welding Repair of Turbine Blades for Nuclear Power Plant$165.00
- NB/T 25007-2011The Requirements on Documentation System for Nuclear Power Plant Commissioning$165.00
- NB/T 25008-2011Anticorrosion and Antifouling of Seawater Cooling System in Nuclear Power Plant$255.00
- NB/T 25009-2012Energy statistics procedure for pressurized water reactor nuclear power plants$165.00
- NB/T 25010-2013Outage Maintenance Supervision Specification for the Conventional Equipment in Nuclear Power Plant$315.00
- NB/T 25011-2013Commissioning Guideline for Water Chemical Treatment System of Nuclear Power Plant$165.00
- NB/T 25012-2013Commissioning Guidelines for Moisture Separator Reheater System of Nuclear Power Plant$165.00
- NB/T 25013-2013Test Requirements for Generator Unit First Synchronization of Nuclear Power Plant$165.00
- NB/T 25014-2013Guide for first run-up of the steam turbine with nuclear steam in nuclear power plants$165.00
- NB/T 25015-2013Guideline for Turbine-generator Commissioning of Nuclear Power Plant$165.00
- NB/T 25016-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants (Parts 1 to 12)$260.00
- NB/T 25016.1-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 1: General$149.00
- NB/T 25016.10-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 10: Water pumps$169.00
- NB/T 25016.11-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 11: Power transmission and distribution equipment$269.00
- NB/T 25016.12-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 12: Lifting appliances$129.00
- NB/T 25016.13-2016Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 13: High voltage motors$120.00
- NB/T 25016.2-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 2: Turbine$229.00
- NB/T 25016.3-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 3: Generator$389.00
- NB/T 25016.4-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 4: Condenser$149.00
- NB/T 25016.5-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 5: Moisture separator reheater$189.00
- NB/T 25016.6-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 6: Feedwater heater$149.00
- NB/T 25016.7-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 7: Deaerator$149.00
- NB/T 25016.8-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 8: Piping$169.00
- NB/T 25016.9-2013Technical guide for manufacturing supervision of conventional island equipment in nuclear power plants - Part 9: Valves$149.00
- NB/T 25017-2013Technical supervision code for metal in conventional island of nuclear power plants$375.00
- NB/T 25018-2014Guide for reliability data management of nuclear power plant conventional island and auxiliary equipment$269.00
- NB/T 25018-2023Guidelines for Reliability Data Management of Conventional Islands and Auxiliary Facilities of Nuclear Power Plants$330.00
- NB/T 25019-2014Technical specification for turbine instrument and control of nuclear power plant$219.00
- NB/T 25020-2014Specification for design and production of concrete volute circulating water pump of nuclear power plant$279.00
- NB/T 25021-2014Technical specification for condensate polishing equipment of nuclear power plant$239.00
- NB/T 25022-2014Technical specification for whole plant electrical equipment mechanical interlocking of nuclear power plant$269.00
- NB/T 25023-2014Rules for welding material evaluation and acceptance of nuclear power plant conventional island$180.00
- NB/T 25024-2014Inspection regulation for safety performance of conventional island and auxiliary pressure-bearing equipment of nuclear power plant$249.00
- NB/T 25025-2014Inspection guidance for water leakage or hydrogen leakage of steam-turbine generator$135.00
- NB/T 25026-2014Commissioning guidance for online chemical instruments of nuclear power plant$240.00
- NB/T 25027-2014Technical guidance for aging condition and lifetime assessment of passive mechanical equipment in conventional island of nuclear power plant$229.00
- NB/T 25028-2014Technical guidance for repair welding of turbine rotor of nuclear power plant$159.00
- NB/T 25029-2014Guidance for operation and maintenance of turbine of nuclear power plant$229.00
- NB/T 25030-2014Guideline of life assessment for steam turbine rotor of units in nuclear power plant$195.00
- NB/T 25031-2014Guidance for operation and maintenance of moisture separator reheater of nuclear power plant$169.00
- NB/T 25032-2014Guidance for lay-up maintenance of secondary circuit pressure vessels of nuclear power plant$229.00
- NB/T 25033-2014Guidance for screening lines susceptible to flow-accelerated corrosion in conventional island of PWR nuclear power plant$209.00
- NB/T 25034-2014Guidance for operation and maintenance of deaerators of nuclear power plants$219.00
- NB/T 25035-2014Technical specification for common enclosure bus for power plant$219.00
- NB/T 25036-2014Technical specification of isolated-phase bus for power plant$299.00
- NB/T 25037-2014Commissioning guideline for main feedwater system of PWR nuclear power plant$129.00
- NB/T 25038-2014Commissioning guideline for circulating water system of PWR nuclear power plant$129.00
- NB/T 25039-2014Recommended practices for the prevention of water damage to steam turbines used for light water nuclear power plant$445.00
- NB/T 25040-2014Specification for factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) of non-safety digital control systems in nuclear power plants$520.00
- NB/T 25041-2014Functional safety requirements of automatic fire alarm system in conventional island of nuclear power plants$395.00
- NB/T 25042-2014The specification of welding safety management for conventional island of nuclear power plants$299.00
- NB/T 25043.1-2014Construction technology code for conventional island and BOP of nuclear power plant - Part 1: Civil work$1,090.00
- NB/T 25043.2-2019Technical specification for construction of nuclear power conventional island and balance of plant - Part 2: Turbine generator unit$1,100.00
- NB/T 25043.3-2014Specification for erection of nuclear power conventional island and balance of plant - Part 3: Circulating water system equipments$299.00
- NB/T 25043.4-2016Specification for erection of nuclear power conventional island and balance of plant - Part 4: Instrumentation and control$465.00
- NB/T 25043.5-2016Technical specification for construction of nuclear power conventional island and balance of plant - Part 5: Water treatment and hydrogen generation systems$465.00
- NB/T 25043.6-2016Technical specification for construction of nuclear power conventional island and balance of plant - Part 6: Piping$345.00
- NB/T 25043.7-2016Technical specification for construction of nuclear power conventional island and balance of plant - Part 7: Heating, ventilation and air conditioning$560.00
- NB/T 25043.8-2016Specification for erection of nuclear power conventional island and balance of plant - Part 8: Thermal insulation and painting$210.00
- NB/T 25043.9-2019Technical specification for construction of nuclear power conventional island and balance of plant - Part 9: Processing and prefabrication$360.00
- NB/T 25044.1-2014Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 1: Civil work$8,100.00
- NB/T 25044.3-2014Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 3: Circulating water system equipments$630.00
- NB/T 25044.4-2016Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 4: Instrumentation and control$790.00
- NB/T 25044.5-2016Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 5: Water treatment and hydrogen generation systems$1,200.00
- NB/T 25044.6-2016Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 6: Piping$979.00
- NB/T 25044.7-2016Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 7: Heating, ventilation and air conditioning$890.00
- NB/T 25044.8-2016Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 8: Thermal insulation and painting$465.00
- NB/T 25044.9-2019Code for construction quality acceptance of nuclear power conventional island and balance of plant - Part 9: Processing and prefabrication$650.00
- NB/T 25045-2015Performance assessment and management guideline of fire protection features for nuclear power plant$1,000.00
- NB/T 25046-2015Code for hydraulic design of nuclear power plants$3,500.00
- NB/T 25047-2016Generator operation and maintenance guideline of nuclear power plant$435.00
- NB/T 25048-2016Commissioning technical guidelines for turbine simulation of nuclear power plant$169.00
- NB/T 25049-2016Technical specification for selection of condensate pump for PWR nuclear power plant$225.00
- NB/T 25050-2016Technical specification for selection of feedwater pump for PWR nuclear power plant$249.00
- NB/T 25051-2016Technical specification for selection of conventional island drain recovery pump for PWR nuclear power plant$195.00
- NB/T 25052-2016Thermal performance test guideline for nuclear power plant conventional island$165.00
- NB/T 25053-2016Technical specification of generator circuit-breaker for nuclear power plants$159.00
- NB/T 25054-2016Technical specification of high voltage motor in PWR nuclear power plants$405.00
- NB/T 25055-2016The inspection code for welding of turbine shaft in nuclear power plants$189.00
- NB/T 25055-2021Inspection code for welded rotors of steam turbines in nuclear power plants$90.00
- NB/T 25056-2016The code of welding repair of the conventional pressure vessel in nuclear power plant$205.00
- NB/T 25057-2016The code of welding procedure for non-ferrous metals in conventional island of nuclear power plant$315.00
- NB/T 25058-2016The code of welding repair for valves in conventional island in nuclear power plant$165.00
- NB/T 25059-2016The code of welding heat treatment for conventional island of nuclear power plant$235.00
- NB/T 25060-2016Technical specification of cold workshops for PWR nuclear power plant$90.00
- NB/T 25061-2016Specification for steam turbines of PWR nuclear power plants$149.00
- NB/T 25062-2016Specification requirement for deaerator of nuclear power plant$150.00
- NB/T 25063-2016Installation specifications for engineering of security and protection systems of nuclear power plant$195.00
- NB/T 25064-2016Guide for construction quality evaluation of conventional island and BOP of nuclear power plant$2,300.00
- NB/T 25065-2016Technical code for geological drilling core preservation of nuclear power plants$265.00
- NB/T 25066-2017Management requirement for maintenance of non-nuclear safety equipment in nuclear power plant$385.00
- NB/T 25067-2017Specification of instrumentation and control for turbine-generator in nuclear power plant$135.00
- NB/T 25068-2017Technical specifications for hydrogen, oil and water systems of generators in nuclear power plants$150.00
- NB/T 25069-2017Technical regulation for inverter of conventional island and balance of plant(BOP) in pressurized water reactor nuclear power plants$330.00
- NB/T 25070-2017Steels for steam turbine blades in nuclear power plants$210.00
- NB/T 25071-2017Guidelines for equipment corrosion management of conventional island and BOP of nuclear power plants in construction phase$135.00
- NB/T 25072-2017Specification for conventional island and BOP coating technology for nuclear power plants$165.00
- NB/T 25073-2017Guide for the acceptance of explosion proof safety for generator hydrogen gas supply system$165.00
- NB/T 25074-2017Specification for impeller of concrete volute circulating water pump of nuclear power plant$165.00
- NB/T 25075-2017Code for construction and acceptance of power transformers, oil-immersed reactors and instrument transformers of nuclear power plant$240.00
- NB/T 25076-2017Technical specification of medium voltage cast-resin insulated bus for conventional island of PWR nuclear power plant$270.00
- NB/T 25077-2017Technical requirement of selection of vacuum pump in nuclear power plant$150.00
- NB/T 25078-2018Selection guidelines for the metallic materials of the conventional island in pressurized water reactor nuclear power plants$240.00
- NB/T 25079-2018Code for acceptance of anticorrosive engineering quality of equipment and pipeline in conventional island of nuclear power plants$390.00
- NB/T 25080-2018Rules for periodic tests of pumps in nuclear power plant$195.00
- NB/T 25081-2018Testing and evaluation of piping system vibration in nuclear power plant$510.00
- NB/T 25082-2018The specification for HVOF repairing of the components in nuclear power plant$150.00
- NB/T 25083-2018Technical guidelines for vibration isolated foundation test of turbo-generator set in nuclear power plant$225.00
All NB/T ranges
- NB/T 1001-2011 – NB/T 10473-2020
- NB/T 10474-2020 – NB/T 10962-2022
- NB/T 10963-2022 – NB/T 11437-2023
- NB/T 11438-2023 – NB/T 11916-2025
- NB/T 11917-2025 – NB/T 20039.11-2011
- NB/T 20039.11-2023 – NB/T 20411-2017
- NB/T 20412-2017 – NB/T 25083-2018
- NB/T 25084-2018 – NB/T 35039-2014
- NB/T 35039-2024 – NB/T 51042-2015
- NB/T 51043-2015 – NB/T 51080-2017