NB/T 20442.10-2017Guideline of periodic safety review for nuclear power plants - Part 10: Human factors (English PDF)
核电厂定期安全审查指南 第10部分:人因
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20442.10-2017 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
April 1, 2017
Implementation date
October 1, 2017
Scope
NB/T 20442.10-2017 is the English-translated version of 核电厂定期安全审查指南 第10部分:人因.
NB/T 20442.10-2017 takes human factors as the safety element of the recommended Chinese energy industry guideline on the periodic safety review of nuclear power plants, of which it is part 10.
For that element it specifies the purpose, the scope, the content, the methods and the processes of the review. It applies to the examination of human factors when a nuclear power plant undergoes its periodic safety review.
The nuclear safety guide HAD 103/11 is the document it quotes. Classified F65 in the Chinese system and 27.120.99 in the international one, it sits with the other parts of the series among the nuclear plant safety standards. Issued on 1 April 2017, it has applied since 1 October 2017.
Found what you need?
Document preview — NB/T 20442.10-2017
National Standard of the People's Republic of China
- ICS
- 27.120.99
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20442.10-2017 cites the following standards, which apply in full or in part through the references made to them in its clauses.
HAD 103/11
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
HAD 103/11
Similar standards
How to Download NB/T 20442.10-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20442.11-2017 — Guideline of periodic safety review for nuclear power plant - Part 11: Equipment qualification
NB/T 20442.9-2017 — Guideline of periodic safety review for nuclear power plants - Part 9: Deterministic safety analysis
NB/T 20442.12-2024 — Guidelines for Periodic Safety Assessment of Nuclear Power Plants - Part 12: Design
Secure payment via Stripe
Payments accepted
NB/T 20442.10-2017
$120.00