NB/T 20580.5-2021Budget estimation norm of nuclear power plant construction project works - Part 5: Electrical equipment installation engineering for nuclear island (English PDF)

核电厂建设工程概算定额 第5部分:核岛电气设备安装工程

Open the NB/T 20580.5-2021 preview as PDF

Preview — first pages of NB/T 20580.5-2021 (full document: 66 pages)

This is a limited preview

Buy now to download the full PDF (66 pages)

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

January 7, 2021

Implementation date

July 1, 2021

Scope

NB/T 20580.5-2021 is the English-translated version of 核电厂建设工程概算定额 第5部分:核岛电气设备安装工程.

NB/T 20580.5-2021 is Part 5 of the Chinese budget estimation norm for nuclear power plant construction, and it prices the installation of electrical equipment in the nuclear island. A budget estimation norm is the book of unit rates used at the design stage to build a cost estimate, stating for each defined item of work how much labour, machinery and material it consumes. This part covers the electrical scope of the nuclear island: the emergency diesel generator sets across their power ratings and the control rod power supply units, the switchgear and distribution boards up to 10 kV, power equipment and lighting in the plant rooms, lightning protection and earthing, cabling with its trays, conduits and supports, and the electrical penetrations that carry circuits through the containment boundary. Each quota item states the work content it includes, the unit of measurement, the labour hours by trade, the machine-shift consumption by equipment type and the material quantities with their base prices. The volume explanation at the front sets out the scope of the quotas, what each rate already covers, the adjustment coefficients for working conditions such as radiation area and confined space, and the rules for measuring quantities; the chapter notes add the conventions specific to each group. Owners, contractors and cost consultants use it to prepare and to check budget estimates for nuclear power projects in China.

Document preview — NB/T 20580.5-2021

National Standard of the People's Republic of China

ICS
01.040.27
Classification
F 02

Issued by: National Energy Administration of the PRC

Contents

  • Foreword
  • Fascicle Explanation - 1 Scope
  • Fascicle Explanation - 2 General Explanation
  • Fascicle Explanation - 3 Explanation of This Norm
  • Norm Items G5-1-1 and G5-1-2 - Diesel Generator Set Installation
  • Norm Items G5-1-3, G5-1-4 and G5-1-5 - Diesel Generator Set and Rod Power Supply Generator Set Installation
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

This document was issued on 7 January 2021 by the National Energy Administration of the PRC and takes effect on 1 July 2021.

It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

It is classified under ICS 01.040.27, Chinese classification F 02.

This document has been drafted in accordance with the rules given in GB/T 1.1-2020, Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents.

This document is Part 5 of NB/T 20580, Budget estimation norm of nuclear power plant construction project works. The following parts of NB/T 20580 have already been issued:

Part 1: Civil construction engineering for nuclear island;

Part 2: Mechanical equipment installation engineering for nuclear island;

Part 3: Piping installation engineering for nuclear island;

Part 4: Ventilation and air conditioning installation engineering for nuclear island;

Part 5: Electrical installation engineering for nuclear island;

Part 6: Instrumentation, control and communication installation engineering for nuclear island;

Part 7: Building engineering for conventional island;

Part 8: Thermal equipment installation engineering for conventional island;

Part 9: Electrical equipment installation engineering for conventional island.

This document was proposed by the Energy Industry Nuclear Power Standardization Technical Committee.

This document is under the jurisdiction of the Nuclear Industry Standardization Research Institute.

Drafting organizations of this document: China Nuclear Power Engineering Co., Ltd.; China General Nuclear Power Engineering Co., Ltd.; Electric Power Planning and Design General Institute.

Main drafters of this document: Xu Liang, Rong Mei, Hu Jiang, Qu Jun, Chen Xiangting, Yu Rong, Zhang Li, Fang Wei, Yang Wenrong, Li Bo.

Fascicle Explanation - 1 Scope

This norm specifies the norm for nuclear island electrical equipment installation engineering within the budget estimation norm of nuclear power plant construction project works.

This norm applies to the nuclear island works of new construction and expansion projects of pressurized water reactor nuclear power units, and to those sub-items with nuclear safety requirements in BOP works, such as the nuclear island radioactive liquid waste tank building, the conventional island radioactive liquid waste tank building, the auxiliary building for radioactive solid waste treatment, the solid waste interim storage, the radioactive machinery repair shop and the decontamination shop. Other reactor types and nuclear engineering works may use it for reference.

Fascicle Explanation - 2 General Explanation

1. This norm shall be implemented together with the Fee norm for nuclear island building and installation works of nuclear power plant construction projects and the Machine-shift fee norm for machinery of nuclear power plant construction projects.

2. The norm is the basis for preparing the budget estimate of preliminary design works; it is the reference basis for preparing tender control prices and tender quotations at the preliminary design stage; it is the basis for formulating investment control plans, for technical and economic analysis and comparison, and for controlling the construction drawing budget; it is also the basis for preparing budget estimate indexes.

3. The norm has been prepared, under normal natural conditions and environment, on the basis of a construction organization design rational for the construction stage, a rational allocation of construction machinery, rational parallel and cross operations being taken into account, as well as the relevant technical standards of pressurized water reactor nuclear power plants, the construction and acceptance codes, the quality outline and safe operating procedures, and the requirements for civilized construction on site and for environmental protection.

4. The consumption of labour, materials and construction machinery in the norm reflects the technical level and the organizational level of nuclear power plant construction at the present stage. Except where the norm expressly allows adjustment, no adjustment of the norm shall be made on the grounds that the construction organization, the working method or the material wastage of a project differs.

5. The labour cost of the norm is specified as follows:

5.1) The labour input of this norm is expressed in comprehensive labour days, without distinguishing work trade or skill grade, each comprehensive labour day being counted on the basis of an eight-hour working system.

5.2) The comprehensive unit price of this norm is implemented at a labour cost of 135.00 yuan per labour day for production workers, which includes the basic wage, wage-type allowances, auxiliary wages, staff welfare expenses and labour protection expenses.

6. This norm has been prepared under the following normal construction conditions:

6.1) Equipment, materials, finished products, semi-finished products and components are complete and undamaged, comply with the quality standards and the design requirements, and are accompanied by certificates of conformity and test records; the supply of goods satisfies the installation progress requirements.

6.2) Cross operations between the installation works and the civil works are normal, and the civil works do not affect the normal construction of the installation works.

6.3) The installation location, the buildings and structures, the equipment foundations and the embedded holes and openings comply with the design standards and satisfy the installation requirements.

6.4) The site installation conditions comply with the design requirements and satisfy the technical conditions.

6.5) The water supply and the power supply both satisfy the normal use of the installation construction.

6.6) The geographical environment and the climatic conditions do not affect the normal operation and the physical health of the installation workers. For construction in a special environment, the expenses shall be calculated separately in accordance with the relevant provisions.

7. The material cost is specified as follows:

7.1) The materials in this norm include the main materials, the auxiliary materials and the sundry materials directly consumed in the installation work content; the material consumption includes the quantity used directly in the installation work content, the spreading and laying quantity, and the specified wastage quantity.

7.2) The material wastage includes: the transport wastage from the factory warehouse, the site centralized stacking place or the site processing place to the installation place, the construction operation wastage and the site stacking wastage.

7.3) Materials in this norm for which no unit price is indicated are main materials; their price is not included in the base price and shall be calculated on the basis of the quantity used as listed and the actual price.

7.4) Materials used in very small quantities in this norm, sundry materials having very little influence on the base price, are merged into the other material cost and are listed in the material cost calculated with the yuan as the unit.

7.5) For the main material consumption rates of installation works, see the relevant chapters of the norm and of the construction drawing budget norm.

7.6) The material unit prices of this norm are kept consistent with the material prices of the construction drawing budget norm; material unit prices are taken at the material warehouse price, and the material transport and miscellaneous charges are 2.5 percent.

8. The construction machinery use fee is specified as follows:

8.1) The construction machinery use fee in the norm is expressed by the machine-shift usage of the machinery.

8.2) The construction machinery of the norm has been determined comprehensively on the basis of a rational machinery allocation for normal construction and of the mechanization equipment level of the construction enterprise; where the actual situation does not agree with the norm, no adjustment shall be made unless otherwise stated in the individual chapters.

8.3) In the norm sub-items only the consumption of the main equipment, machines, tools, instruments and meters is listed; machinery used in very small quantities and having very little influence on the base price is merged into the other machinery cost and is listed in the machinery cost calculated with the yuan as the unit.

8.4) Tools and appliances whose unit value is within 2000 yuan and whose service life is within two years, which do not constitute fixed assets, do not enter the norm; they are taken into account in the Fee norm for nuclear island building and installation works of nuclear power plant construction projects.

9. Concerning horizontal and vertical transport, the following is specified:

9.1) Equipment: the horizontal and vertical transport from the designated stacking place on the installation site to the installation place is included; the horizontal and vertical transport of large equipment is not included.

9.2) Materials, finished products and semi-finished products: the horizontal and vertical transport from the site warehouse of the construction unit or from the designated stacking place to the installation place is included.

9.3) Datum plane for vertical transport: indoors the indoor floor level is taken as the datum plane; outdoors the ground level of the installation site is taken as the datum plane.

10. Under this norm the following expenses are calculated with the coefficients specified in Table 1, Fee coefficients.

Table 1 item 1: Scaffolding erection and dismantling fee, broken down by specialty in items 1.1 to 1.7 below.

Table 1 item 1.1: Nuclear island mechanical equipment installation works; calculation base: norm labour cost; coefficient 15 percent; of which labour cost 35 percent.

Table 1 item 1.2: Nuclear island piping installation works; calculation base: norm labour cost; coefficient 10 percent; of which labour cost 55 percent.

Table 1 item 1.3: Nuclear island ventilation and air conditioning works; calculation base: norm labour cost; coefficient 10 percent; of which labour cost 55 percent.

Table 1 item 1.4: Nuclear island electrical equipment installation works; calculation base: norm labour cost; coefficient 15 percent; of which labour cost 35 percent.

Table 1 item 1.5: Nuclear island automation control instrumentation installation works; calculation base: norm labour cost; coefficient 15 percent; of which labour cost 35 percent.

Table 1 item 1.6: Nuclear island communication equipment installation works; calculation base: norm labour cost; coefficient 15 percent; of which labour cost 35 percent.

Table 1 item 1.7: Nuclear island sandblasting, anticorrosion and thermal insulation works; calculation base: norm labour cost; coefficient 20 percent; of which labour cost 25 percent.

Table 1 item 2: Surcharge for loss of efficiency when construction is carried out simultaneously with production; calculation base: norm labour cost; coefficient 10 percent; of which labour cost 100 percent.

Table 1 item 3: Surcharge for loss of efficiency when construction is carried out in an environment harmful to physical health; calculation base: norm labour cost; coefficient 10 percent; of which labour cost 100 percent.

11. Except where separately stated in the individual parts, this norm does not include the following items:

11.1) The cost of assisting the single-machine commissioning and the linked commissioning of key equipment.

11.2) The cost of single-machine functional tests.

11.3) The electricity, steam, industrial water, circulating water, demineralized water, compressed air, nitrogen, lubricating oil (grease), feedstock and similar consumables required for single-machine commissioning.

11.4) The off-site transport of equipment, materials, finished products and semi-finished products.

11.5) The labour, materials and machinery costs added by requirements exceeding the codes.

11.6) The work caused by equipment and components not complying with the design requirements.

11.7) The entry and exit fee, the use fee and the standby machine-shift fee of large machinery.

11.8) The cost of special labour protection articles required by the special nature of the project.

11.9) The cost of special health protection required by the special nature of the project.

11.10) The cost of special technical measures required by the special nature of the project.

12. Where the wording XX or less or within XX appears in this norm, XX itself is included; where the wording beyond XX or above XX appears, XX itself is not included.

13. For the various specialised norm sub-items not covered by this norm, the relevant norms may be referred to in application.

14. For matters not covered by this norm, see in detail the explanation of each part and of each chapter.

Fascicle Explanation - 3 Explanation of This Norm

1. This norm applies to the installation works of power distribution equipment of 10 kV and below, the workshop power electrical equipment and electrical lighting fittings, the lightning protection and earthing devices, the wiring and conduit laying, and the electrical penetration installation works of new construction and expansion projects of pressurized water reactor nuclear power plants.

2. In addition to the working procedures already described in the individual chapters, the work content of this norm also includes: construction technical preparation, construction quality control document preparation, construction machinery preparation, standard instrument and meter preparation, construction safety protection measures, cleaning of the installation position, site handling of equipment, materials, tools and appliances, unpacking inspection, installation, adjustment and testing, finishing works, site cleaning, cooperation in quality inspection, cross-trade construction coordination, and the temporary interruption times of the mobile water, power and air supplies.

3. This norm does not include the following work content:

3.1) The installation of electrical equipment above 10 kV and of items reserved for specialised disciplines.

3.2) The work of electrical equipment (such as electric motors) taking part, together with the mechanical equipment, in single-body test running and in combined test running.

Norm Items G5-1-1 and G5-1-2 - Diesel Generator Set Installation

Work content: complete-set installation of the equipment, wiring and testing.

Unit of measurement: set (group).

Norm code G5-1-1, Diesel generator set installation (2500 kW and below): base price 46083.96 yuan, of which labour cost 28265.49 yuan, material cost 2549.66 yuan and machinery cost 15268.81 yuan.

Norm code G5-1-2, Diesel generator set installation (4000 kW and below): base price 63955.95 yuan, of which labour cost 40277.93 yuan, material cost 3544.00 yuan and machinery cost 20134.02 yuan.

Labour: comprehensive labour day, installation; unit labour day; unit price 135.00 yuan; quantity 209.374 for G5-1-1 and 298.355 for G5-1-2.

Priced materials (name, unit, unit price in yuan, quantity for G5-1-1, quantity for G5-1-2): galvanized iron wire, comprehensive, kg, 4.29, 5.500, 7.700; plastic sheeting, kg, 9.21, 2.720, 2.340; cotton yarn, kg, 5.39, 1.670, 2.230; white cloth, m, 3.83, 0.760, 0.990.

Priced materials (continued): abrasive cloth, sheet, 0.73, 3.300, 3.300; polytetrafluoroethylene tape 1 by 30, kg, 21.37, 0.300, 0.400; polyester foamed plastic, kg, 22.22, 0.330, 0.350; welding rod J422 (comprehensive), kg, 3.72, 0.630, 0.620.

Priced materials (continued): soldering paste, bottled 50 g, kg, 56.92, 0.080, 0.090; solder wire, kg, 11.97, 0.400, 0.450; squared timber, cubic metre, 1398.23, 0.040, 0.070; sleeper timber, cubic metre, 2478.63, 0.080, 0.090.

Priced materials (continued): insulating varnish, kg, 8.55, 0.500, 0.500; diesel oil, kg, 5.62, 90.290, 138.380; kerosene, kg, 3.08, 6.950, 9.020; machine oil, kg, 10.34, 1.360, 1.520.

Priced materials (continued): yellow grease, kg, 8.12, 0.440, 0.440; red lead oil, kg, 7.44, 0.120, 0.120; new standard clean gasoline No. 90, kg, 7.69, 0.500, 0.500; white paint, kg, 6.86, 0.200, 0.220.

Priced materials (continued): mixed paint, kg, 12.44, 0.500, 0.500; electric power compound grease, grade one, kg, 7.79, 0.300, 0.400; asbestos paper, kg, 5.35, 0.350, 0.450; blue shell paper, thickness 0.1 to 1 mm, kg, 10.24, 0.300, 0.500.

Priced materials (continued): rubber insulated wire BLX-35, m, 25.60, 10.000, 10.000; flat shim iron (comprehensive), kg, 4.20, 22.660, 23.830; water, cubic metre, 3.40, 11.190, 15.240; electricity, kWh, 0.84, 330.000, 669.000.

Priced materials (continued): calibration material cost, yuan, 0.86, 1080.872, 1459.553; self-adhesive rubber tape 20 mm by 20 m, roll, 6.15, 0.500, 0.750; white gauze tape 20 mm by 20 m, roll, 4.84, 0.700, 0.900; other material cost, yuan, 1.00, 40.800, 44.270.

Machinery (name, unit, unit price in yuan, quantity for G5-1-1, quantity for G5-1-2): precision electric bridge YY2814, machine-shift, 60.95, 10.000, 12.000; voltmeter and ammeter, various ranges, machine-shift, 21.00, 25.000, 30.000; digital multimeter F-87, machine-shift, 15.36, 24.000, 27.000; digital high-voltage meter GYB-II, machine-shift, 143.64, 10.000, 12.000.

Machinery (continued): electric energy calibrator ST9040, machine-shift, 141.71, 7.000, 9.000; digital tachometer, machine-shift, 60.20, 13.000, 16.000; inductance and capacitance tester, machine-shift, 24.55, 4.000, 6.000; digital storage oscilloscope HP-54603B, machine-shift, 90.11, 12.000, 14.000.

Machinery (continued): phase and frequency meter 704-3, machine-shift, 30.10, 11.000, 13.000; high-voltage switch tester CGK-890 II, machine-shift, 18.02, 9.000, 13.000; high-voltage insulation resistance tester 3124, machine-shift, 84.07, 7.000, 8.000; high-voltage rectifier silicon stack and filter, machine-shift, 31.50, 9.000, 10.000.

Machinery (continued): relay protection tester JBC, machine-shift, 94.62, 22.000, 25.000; other instruments and meters of various kinds, machine-shift, 27.49, 5.000, 5.000; light-duty test transformer TSB, machine-shift, 171.10, 6.000, 10.000; dual-channel on-line recorder 8203-01, machine-shift, 105.37, 10.000, 12.000.

Machinery (continued): direct current high-voltage generator ZGF-200, machine-shift, 66.25, 10.000, 12.000; digital millisecond meter DM3-802H, machine-shift, 13.82, 13.000, 15.000; forklift crane, lifting capacity 5 t, machine-shift, 520.84, 0.660, 0.440; portal crane, lifting capacity 60 t, machine-shift, 1984.31, 1.000, 1.500.

Machinery (continued): truck crane, lifting capacity 16 t, machine-shift, 1015.43, not used for G5-1-1, 0.330 for G5-1-2; truck crane, lifting capacity 8 t, machine-shift, 720.11, 0.550, 0.990; load truck, loading capacity 8 t, machine-shift, 482.28, not used for G5-1-1, 0.880 for G5-1-2.

Machinery (continued): inverter arc welding rectifier welder (imported), capacity 27.8 kVA, machine-shift, 123.40, 0.220, 0.660; electric air compressor 0.6 cubic metre per minute, machine-shift, 177.24, 0.500, 0.500; other machinery cost, yuan, 1.00, 28.630, 45.080.

Norm Items G5-1-3, G5-1-4 and G5-1-5 - Diesel Generator Set and Rod Power Supply Generator Set Installation

Work content: complete-set installation of the equipment, wiring and testing.

Unit of measurement: set (group).

Norm code G5-1-3, Diesel generator set installation (6000 kW and below): base price 160170.20 yuan, of which labour cost 70259.00 yuan, material cost 62546.90 yuan and machinery cost 27364.30 yuan.

Norm code G5-1-4, Diesel generator set installation (8000 kW and below): base price 334244.42 yuan, of which labour cost 199508.27 yuan, material cost 90973.85 yuan and machinery cost 43762.30 yuan.

Norm code G5-1-5, Rod power supply generator set installation: base price 31347.22 yuan, of which labour cost 20195.87 yuan, material cost 2228.83 yuan and machinery cost 8922.52 yuan.

Labour: comprehensive labour day, installation; unit labour day; unit price 135.00 yuan; quantity 520.437 for G5-1-3, 1477.839 for G5-1-4 and 149.599 for G5-1-5.

Priced materials (name, unit, unit price in yuan, then quantities for G5-1-3, G5-1-4 and G5-1-5; a dash means the item is not used): section steel (comprehensive), kg, 2.70, 312.000, 3529.500, dash; steel wire rope, diameter 21.5, kg, 5.82, dash, 3.200, dash; chequered steel plate, thickness 3 mm, kg, 3.31, dash, 247.500, dash; galvanized iron wire, comprehensive, kg, 4.29, 19.600, 39.840, 6.340.

Priced materials (continued): steel wire rope (comprehensive), kg, 16.07, 1939.680, 1939.680, dash; steel wire brush 2 inch, piece, 8.55, 1.350, 1.350, dash; plastic sheeting, kg, 9.21, 2.340, 9.740, 1.050; cotton yarn, kg, 5.39, 3.380, 12.570, 1.650.

Priced materials (continued): white cloth, m, 3.83, 1.150, 10.480, 0.860; hemp fibre, kg, 7.44, dash, 0.120, dash; palm rope, kg, 8.60, 10.800, 10.800, dash; abrasive cloth, sheet, 0.73, 7.800, 9.120, dash.

Priced materials (continued): lead powder asbestos rope, diameter 6, for 250 degrees Celsius, kg, 19.66, dash, 0.300, dash; polytetrafluoroethylene tape 1 by 30, kg, 21.37, 0.500, 0.600, 0.300; polyester foamed plastic, kg, 22.22, 0.370, 0.270, 0.290; acid-resistant rubber sheet, kg, 7.09, dash, 33.000, dash.

Priced materials (continued): asbestos rubber sheet, low pressure (comprehensive), kg, 5.66, dash, 16.500, dash; rubber pad, thickness 2 mm, kg, 7.25, 27.000, 43.620, dash; grinding wheel disc (comprehensive), piece, 3.27, 27.000, 27.000, dash; stainless steel welding rod A022, diameter 2.5 to 4.0, kg, 60.53, dash, 8.250, dash.

Priced materials (continued): welding rod J422 (comprehensive), kg, 3.72, 0.710, 2.720, 0.660; welding rod J427 (comprehensive), kg, 9.83, 65.700, 135.000, dash; soldering paste, bottled 50 g, kg, 56.92, 0.100, 0.120, 0.080; solder wire, kg, 11.97, 0.500, 0.600, 0.400.

Priced materials (continued): Datong coal briquette, t, 350.43, dash, 0.100, dash; squared timber, cubic metre, 1398.23, 0.260, 0.740, 0.070; sleeper timber, cubic metre, 2478.63, 9.120, 12.740, 0.110; insulating varnish, kg, 8.55, 0.500, 0.500, 0.500.

Priced materials (continued): antirust paint C53-1, kg, 14.10, 6.300, 14.550, dash; turbine oil, kg, 12.36, dash, 330.000, dash; diesel oil, kg, 5.62, 160.160, 119.190, 103.590; kerosene, kg, 3.08, 9.590, 18.520, 6.680.

Priced materials (continued): gasoline, kg, 6.45, 7.200, 23.700, dash; machine oil, kg, 10.34, 1.590, 28.660, 1.120; oxygen (industrial), bottle, 27.40, 6.760, 13.920, dash; yellow grease, kg, 8.12, 0.550, 1.610, 0.530.

Priced materials (continued): red lead oil, kg, 7.44, 0.120, 0.060, 0.080; new standard clean gasoline No. 90, kg, 7.69, 0.500, 0.750, 0.260; white paint, kg, 6.86, 0.220, 1.350, 0.260; mixed paint, kg, 12.44, 9.500, 26.000, 0.500.

Priced materials (continued): electric power compound grease, grade one, kg, 7.79, 0.450, 0.500, 0.300; potassium dichromate 98 percent, kg, 21.11, dash, 6.350, dash; asbestos paper, kg, 5.35, 0.450, 0.550, 0.350; blue shell paper, thickness 0.1 to 1 mm, kg, 10.24, 0.500, 0.600, 0.300.

Priced materials (continued): rubber insulated wire BLX-120, m, 72.65, 10.000, 10.000, dash; rubber insulated wire BLX-35, m, 25.60, dash, dash, 10.000; flat shim iron (comprehensive), kg, 4.20, 41.690, 195.430, 25.820; water, cubic metre, 3.40, 17.840, 27.050, 11.440.

Priced materials (continued): electricity, kWh, 0.84, 1315.000, 3310.000, 330.000; calibration material cost, yuan, 0.86, 1459.553, 1459.553, 509.405; bristle brush 3 inch, piece, 2.56, 1.800, 1.800, dash; self-adhesive rubber tape 20 mm by 20 m, roll, 6.15, 1.000, 1.250, 0.500.

Priced materials (continued): shackle 30 t, piece, 291.45, 5.400, 5.400, dash; white gauze tape 20 mm by 20 m, roll, 4.84, 0.900, 1.000, 0.700; other material cost, yuan, 1.00, 56.010, 88.380, 20.600.

Machinery (name, unit, unit price in yuan, then quantities for G5-1-3, G5-1-4 and G5-1-5): precision electric bridge YY2814, machine-shift, 60.95, 12.000, 12.000, 3.600; voltmeter and ammeter, various ranges, machine-shift, 21.00, 30.000, 30.000, 10.000; digital multimeter F-87, machine-shift, 15.36, 27.000, 27.000, 12.000; digital high-voltage meter GYB-II, machine-shift, 143.64, 12.000, 12.000, 3.600.

Machinery (continued): electric energy calibrator ST9040, machine-shift, 141.71, 9.000, 9.000, 4.000; digital tachometer, machine-shift, 60.20, 16.000, 16.000, 3.000; inductance and capacitance tester, machine-shift, 24.55, 6.000, 6.000, 1.500; digital storage oscilloscope HP-54603B, machine-shift, 90.11, 14.000, 14.000, 6.000.

Machinery (continued): phase and frequency meter 704-3, machine-shift, 30.10, 13.000, 13.000, 3.600; high-voltage switch tester CGK-890 II, machine-shift, 18.02, 13.000, 13.000, 3.600; high-voltage insulation resistance tester 3124, machine-shift, 84.07, 8.000, 8.000, 3.600; high-voltage rectifier silicon stack and filter, machine-shift, 31.50, 10.000, 10.000, 3.000.

Machinery (continued): relay protection tester JBC, machine-shift, 94.62, 25.000, 25.000, 12.000; theodolite 010B, machine-shift, 95.56, dash, 4.950, dash; other instruments and meters of various kinds, machine-shift, 27.49, 5.000, 5.000, dash; light-duty test transformer TSB, machine-shift, 171.10, 10.000, 10.000, 2.000.

Machinery (continued): dual-channel on-line recorder 8203-01, machine-shift, 105.37, 12.000, 12.000, 3.000; direct current high-voltage generator ZGF-200, machine-shift, 66.25, 12.000, 12.000, 3.600; digital millisecond meter DM3-802H, machine-shift, 13.82, 15.000, 15.000, 8.000; far infrared drying oven YZHZ-100, machine-shift, 37.12, 2.880, 6.840, dash.

Machinery (continued): portal crane, lifting capacity 60 t, machine-shift, 1984.31, 2.000, 3.000, 1.000; truck crane, lifting capacity 16 t, machine-shift, 1015.43, 1.770, 1.000, 0.660; truck crane, lifting capacity 25 t, machine-shift, 1225.56, dash, 0.610, dash; truck crane, lifting capacity 50 t, machine-shift, 3159.06, dash, 1.540, dash.

Machinery (continued): truck crane, lifting capacity 5 t, machine-shift, 462.83, 2.250, 5.550, dash; truck crane, lifting capacity 8 t, machine-shift, 720.11, 0.550, 0.880, dash; load truck, loading capacity 5 t, machine-shift, 410.15, 2.250, 5.550, dash; load truck, loading capacity 8 t, machine-shift, 482.28, 1.100, 2.150, 0.790.

Machinery (continued): electric winch, single drum fast, traction force 20 kN, machine-shift, 209.11, 4.500, 4.500, dash; electric winch, double drum slow, traction force 50 kN, machine-shift, 214.60, 1.650, 9.190, 2.380; inverter arc welding rectifier welder (imported), capacity 27.8 kVA, machine-shift, 123.40, 15.500, 37.890, 0.790.

Machinery (continued): electric air compressor 0.6 cubic metre per minute, machine-shift, 177.24, 0.500, 0.500, 0.500; electric air compressor 3 cubic metres per minute, machine-shift, 267.15, dash, 3.300, dash; welding rod holding oven 2.5 kg, machine-shift, 3.82, dash, 19.800, dash; other machinery cost, yuan, 1.00, 63.380, 63.280, 21.250.

1 Scope

NB/T 20580.5-2021 is Part 5 of the Chinese budget estimation norm for nuclear power plant construction, and it prices the installation of electrical equipment in the nuclear island. A budget estimation norm is the book of unit rates used at the design stage to build a cost estimate, stating for each defined item of work how much labour, machinery and material it consumes. This part covers the electrical scope of the nuclear island: the emergency diesel generator sets across their power ratings and the control rod power supply units, the switchgear and distribution boards up to 10 kV, power equipment and lighting in the plant rooms, lightning protection and earthing, cabling with its trays, conduits and supports, and the electrical penetrations that carry circuits through the containment boundary. Each quota item states the work content it includes, the unit of measurement, the labour hours by trade, the machine-shift consumption by equipment type and the material quantities with their base prices. The volume explanation at the front sets out the scope of the quotas, what each rate already covers, the adjustment coefficients for working conditions such as radiation area and confined space, and the rules for measuring quantities; the chapter notes add the conventions specific to each group. Owners, contractors and cost consultants use it to prepare and to check budget estimates for nuclear power projects in China.

Chapter 1 of this norm is headed Diesel engines, generators.

1 Explanation. The equipment installation work content of this chapter is: construction preparation, equipment handling and hoisting, unpacking inspection, counting and cleaning, inspection and acceptance of the equipment foundation, re-measurement and setting-out of the foundation, chiselling of the rough surface, embedding of the foundation anchor bolts, pre-embedding of the secondary embedded parts, cooperation in the secondary grouting, equipment installation, levelling and alignment of the equipment, adjustment and fixing of the equipment, adjustment of the equipment clearances, verticality and concentricity, preparation of the shim irons, fine alignment and tightening, spot welding of the shim irons, evacuation of the chiller unit, charging of the refrigerant, measurement of the various parameters, and single-machine test running.

2 Quantity measurement rules. Diesel engines and generator sets are both measured with the set (group) as the unit of measurement.

Remaining clauses in the full document

  • 2 Normative references
  • 3 Terms and definitions

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 66 pages — is available in the English PDF.

Similar standards

NB/T 20580.1-2021|NB/T 20580.2-2021|NB/T 20580.3-2021|NB/T 20580.4-2021|NB/T 20580.6-2021|NB/T 20580.7-2021|NB/T 20580.8-2021|NB/T 20580.9-2021

How to Buy NB/T 20580.5-2021

  1. 1Add to cart. Click the "Buy NB/T 20580.5-2021" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
66 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20580.5-2021

$1,190.00

$1,010.00for partners