NB/T 20575-2019Technical requirements for the repair of welded seams of the tube and tube sheets of the heat exchangers of the 2nd and 3rd stage heat exchangers of PWR nuclear power plants (English PDF)
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20575-2019 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
January 1, 2019
Implementation date
January 1, 2019
Scope
NB/T 20575-2019 (Technical requirements for the repair of welded seams of the tube and tube sheets of the heat exchangers of the 2nd and 3rd stage heat exchangers of PWR nuclear power plants) is available as an English-translated PDF.
NB/T 20575-2019 is the Chinese standard "Technical requirements for the repair of welded seams of the tube and tube sheets of the heat exchangers of the 2nd and 3rd stage heat exchangers of PWR nuclear power plants".
Found what you need?
Document preview — NB/T 20575-2019
Contents
- Document data
- Standards quoted by this standard
1 Document data
Sector: Energy Industry.
Standard type: recommended.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
How to Download NB/T 20575-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
NB/T 10116-2025 — Recommended Practices for Reducing the Impact of Hydraulic Fracturing Operations on the Surface Environment
Secure payment via Stripe
Payments accepted
NB/T 20575-2019
$150.00