NB/T 20426-2017Equipment maintenance requirements of PWR nuclear power plants during commissioning phase (English PDF)
压水堆核电厂调试阶段设备的保养要求
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20426-2017 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
April 1, 2017
Implementation date
October 1, 2017
Scope
NB/T 20426-2017 is the English-translated version of 压水堆核电厂调试阶段设备的保养要求.
NB/T 20426-2017 is the recommended Chinese energy industry standard setting the maintenance requirements for the equipment of a pressurized water reactor nuclear power plant during the commissioning phase.
It specifies the maintenance documentation required, the general maintenance requirements, the maintenance methods and the technical requirements that go with them.
It applies to equipment maintenance during the commissioning phase of pressurized water reactor plants, and nuclear power plants with other reactors may apply it according to their actual conditions.
DL/T 956 is the document it quotes. It is classified F65 in the Chinese system and 27.120.99 internationally. Issued on 1 April 2017, it has applied since 1 October 2017.
Found what you need?
Document preview — NB/T 20426-2017
National Standard of the People's Republic of China
- ICS
- 27.120.99
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20426-2017 cites the following standards, which apply in full or in part through the references made to them in its clauses.
DL/T 956
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download NB/T 20426-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 956-2017 — Guideline for lay-up of thermal power equipment in fossil plants
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20426-2017
$150.00