Valid

NB/T 20469-2023Technical Guidelines for Testing of Pressurized Water Reactor Nuclear Power Plants Loss of Off-site Power Supply (English PDF)

压水堆核电厂失去厂外电源试验技术导则

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for NB/T 20469-2023 in 30 minutes.

Issued by

National Energy Administration

Level / Type

Industry · Recommended

Issue date

October 11, 2023

Implementation date

April 11, 2024

Scope

NB/T 20469-2023 is the English-translated version of 压水堆核电厂失去厂外电源试验技术导则.

NB/T 20469-2023 is the Chinese industry standard "Technical Guidelines for Testing of Pressurized Water Reactor Nuclear Power Plants Loss of Off-site Power Supply".

It was issued on October 11, 2023 by the National Energy Administration, and took effect on April 11, 2024. It is in force and replaces NB/T 20469-2017.

Found what you need?

Document preview — NB/T 20469-2023

National Standard of the People's Republic of China

Issued by: National Energy Administration

Contents

  • Document data
1 Document data

Sector: Energy Industry (industry standard).

Issuing body: National Energy Administration.

Date of issue: 2023-10-11.

Date of implementation: 2024-04-11.

Status: valid, replaces NB/T 20469-2017.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Editions of NB/T 20469

EditionTitleRevisionStatus
NB/T 20469-2023Technical Guidelines for Testing of Pressurized Water Reactor Nuclear Power Plants Loss of Off-site Power Supply—Valid
NB/T 20469-2017Technical Guidelines for Loss of Power Supply Tests in PWR Nuclear Power Plants—Obsolete

This page sells the current edition, NB/T 20469-2023. Earlier editions are listed for reference only.

How to Download NB/T 20469-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 20469-2023

$240.00