NB/T 20512.2-2018Operating license extension of nuclear power plant - Part 2: mechanical components aging management review (English PDF)
核电厂运行许可证延续 第2部分:机械设备老化管理审查
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20512.2-2018 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
December 10, 2018
Implementation date
April 1, 2019
Scope
NB/T 20512.2-2018 is the English-translated version of 核电厂运行许可证延续 第2部分:机械设备老化管理审查.
NB/T 20512.2-2018 is the Chinese energy industry standard covering operating license extension of nuclear power plant, Part 2: mechanical components aging management review.
It was issued on 10 December 2018 and has been in force since 1 April 2019, as a first edition. The document is under the responsibility of the National Energy Administration.
This page is published from the official record of the 2018 edition. The figures, limits and tables the standard contains are those of the document itself, delivered in full with the English translation.
Found what you need?
Document preview — NB/T 20512.2-2018
National Standard of the People's Republic of China
Issued by: National Energy Administration of the People's Republic of China
Contents
- [Preview only]
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 General requirements
- 4.1 Environmental conditions
- 4.2 Basic principles
- 4.3 Basic process
- 5 Technical Requirements
- 6 Test methods
- 7 Inspection Rules
- 8 Marking, packaging, transportation and storage
- 9 Evaluation indicators
1 Foreword
NB/T 20512.2-2018 was issued by National Energy Administration of the People's Republic of China on 10 December 2018 and has been in force since 1 April 2019.
It is one of 7 parts of the NB/T 20512 series.
The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
2 Scope Preview
NB/T 20512.2-2018 carries no ICS number and no Chinese Standard Classification code.
This catalogue holds 4,537 other NB/T standards.
Of the 1,959 NB/T standards that do carry an ICS number, 1,265 (65%) fall under ICS 27, in the field of energy and heat transfer engineering.
3 About this standard
Issued by: National Energy Administration of the People's Republic of China
English translation: about 15 pages
4 Related standards
Other parts of this standard:
NB/T 20512.1-2018 — Operating licenses extension of nuclear power plant - Part 1: Screening of aging management review and identification of time-limited aging analysis
NB/T 20512.1-2023 — Renewal of Nuclear Power Plant Operating License - Part 1: Selection of Aging Management Review Objects and Identification of Time Limit Aging Analysis
NB/T 20512.3-2018 — Operating license extension of nuclear power plants - Part 3: Aging management review for electrical and instrumentation and control components
NB/T 20512.3-2023 — Nuclear power plant operating license renewal - Part 3: Review of aging management of electrical and instrumentation and control equipment
NB/T 20512.4-2018 — Operating license extension of nuclear power plants - Part 4: Ageing management review for structures and structural components
NB/T 20512.4-2023 — Renewal of Nuclear Power Plant Operating License - Part 4: Review of Aging Management of Structures and Structure Components
Other editions:
NB/T 20512.2-2023 (later edition)
Standards on related subjects:
NB/T 20015-2021 — Nuclear power plant simulators for use in operator training and examination
EJ/T 350-1994 — 740-liter UF6 containers
EJ/T 424-1994 — 3 cubic-meter UF6 containers
5 Classification and status
Prefix NB/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download NB/T 20512.2-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20512.3-2023 — Nuclear power plant operating license renewal - Part 3: Review of aging management of electrical and instrumentation and control equipment
NB/T 20512.1-2018 — Operating licenses extension of nuclear power plant - Part 1: Screening of aging management review and identification of time-limited aging analysis
NB/T 20512.3-2018 — Operating license extension of nuclear power plants - Part 3: Aging management review for electrical and instrumentation and control components
NB/T 20512.2-2018
$255.00