NB/T 20317-2014Management of operating experience feedback in nuclear power plant (English PDF)
核电厂运行经验反馈管理
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20317-2014 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
October 15, 2014
Implementation date
March 1, 2015
Scope
NB/T 20317-2014 is the English-translated version of 核电厂运行经验反馈管理.
Operating experience feedback is what NB/T 20317-2014 addresses, as a recommended standard of the Chinese energy industry written for nuclear power plants. The standard identifies the basic elements of that field, beginning with the way the feedback process is organized and managed.
It goes on to the screening of reports and the gathering of operating experience, and then to the use that is made of that experience. It cites the nuclear safety regulation HAF 001/02/01.
The National Energy Administration issued it under the Chinese classification F69 and the international classification 27.120.20. Issued on 15 October 2014, it has applied since 1 March 2015.
Found what you need?
Document preview — NB/T 20317-2014
National Standard of the People's Republic of China
- ICS
- 27.120.20
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20317-2014 cites the following standards, which apply in full or in part through the references made to them in its clauses.
HAF 001/02/01
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
HAF 001/02/01
Similar standards
How to Download NB/T 20317-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
NB/T 10116-2025 — Recommended Practices for Reducing the Impact of Hydraulic Fracturing Operations on the Surface Environment
Secure payment via Stripe
Payments accepted
NB/T 20317-2014
$319.00