Scope
NB/T 20183-2012 is the English-translated version of 核电厂可靠性保证大纲编写指南.
NB/T 20183-2012 is a recommended Chinese energy industry standard that serves as a guideline for compiling the reliability assurance programme of a nuclear power plant.
It states the basic principles to follow when that programme is drawn up, together with the requirements bearing on the reliability of the plant and on its assurance, and it is meant as a guiding document for the people who write the programme.
Its field of application is the preparation of the reliability assurance programme itself rather than the running of the plant. It is used with GB/T 7827-1987, GB/T 7828-1987, NB/T 20096-2012 and the military standard GJB 813-1990. Issued on 19 October 2012, it has applied since 1 March 2013.
Found what you need?
Document preview — NB/T 20183-2012
National Standard of the People's Republic of China
- ICS
- 27.120.20
Issued by: National Energy Administration of the People's Republic of China
Contents
- [Preview only]
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Technical requirements
- 4.1 Environmental conditions
- 4.2 Operating conditions during on-grid operation
- 4.3 Wind turbine conditions during off-grid power supply
- 4.4 Bearing current
- 4.5 Isolation insulation resistance
- 4.6 Performance requirements
- 4.7 Sensors
- 4.8 Electromagnetic compatibility requirements
- 4.9 Human-machine interaction
- 5 Test methods
- 5.1 Test requirements
- 5.2 Test principles and methods
- 6.1 Samples and interfaces
- 6.2 Technical requirements for test items
- 7 Inspection rules
- 7.1 Basic function test
- 7.2 Touch current test
- 7.3 Loading test
- 7.4 Braking test
- 7.5 Machine-side differential mode voltage dU/dt value
- 7.6 Temperature rise test
- 7.7 Converter module current sharing test
- 7.8 Filter capacitor switching current test
- 7.9 Filter capacitor operating current test
- 8 Product nameplate, marking, packaging, transportation and storage
- 9 Assembly alignment of weldments
1 Foreword
NB/T 20183-2012 was issued by National Energy Administration of the People's Republic of China on 19 October 2012 and has been in force since 1 March 2013.
The NB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
The document runs to 15 pages in English translation.
2 Scope Preview
This standard is a recommended Chinese energy industry standard that serves as a guideline for compiling the reliability assurance programme of a nuclear power plant. It states the basic principles to follow when that programme is drawn up, together with the requirements bearing on the reliability of the plant and on its assurance, and it is meant as a guiding document for the people who write the programme. Its field of application is the preparation of the reliability assurance programme itself rather than the running of the plant. It is used with GB/T 7827-1987, GB/T 7828-1987, NB/T 20096-2012 and the military standard GJB 813-1990.
NB/T 20183-2012 falls under ICS 27.120.20, in the field of energy and heat transfer engineering.
This catalogue holds 1,264 other NB/T standards in that field.
In this catalogue, NB/T standards carry edition years from 2009 to 2026.
3 Normative references
GB/T 7827-1987 — Reliability prediction procedure
GB/T 7828-1987 — Reliability design reviews
NB/T 20096-2012 — Failure Mode and Effects Analysis for System of Nuclear Power Plants
GJB 813-1990
4 About this standard
Issued by: National Energy Administration of the People's Republic of China
English translation: about 15 pages
5 Related standards
Standards on related subjects:
NB/T 20015-2021 — Nuclear power plant simulators for use in operator training and examination
NB/T 20332-2015 — Construction requirements for prestressed concrete containments for pressurized water reactor nuclear power plants
NB/T 20325.1-2014 — Prestressing technology specification for safety containment of PWR nuclear power plants - Part 1: Material
NB/T 20190-2023 — Noise control in nuclear power plant production buildings
NB/T 20177-2012 — Design Criteria for Component Cooling Water System of Pressurized Water Reactor Nuclear Power Plants
NB/T 20176-2012 — Design requirements for hydrogen, nitrogen, oxygen and carbon dioxide supply systems of PWR nuclear power plant
6 Classification and status
International classification (ICS): 27.120.20
Prefix NB/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download NB/T 20183-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20183-2012
$135.00