GB/T 41585-2022Specification of draw-up commissioning program for pressurized water reactor nuclear power plants (English PDF)

压水堆核电厂调试大纲编写规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for GB/T 41585-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 11, 2022

Implementation date

February 1, 2023

Scope

GB/T 41585-2022 is the English-translated version of 压水堆核电厂调试大纲编写规范.

GB/T 41585-2022 says what has to go into the commissioning program of a pressurized water reactor nuclear power plant and how it is to be written. It specifies the basic content and the preparation requirements of that program.

The content it prescribes covers the project overview, the purpose of the program, the division of the commissioning stages with the main tests of each stage, the schedule, the organization with its responsibilities and personnel, the commissioning documents, the implementation, the nuclear safety and quality management applied during it, and the commissioning manager.

Informative annexes give an example list of commissioning test projects and a typical chapter layout. It defines commissioning and the first-of-a-kind test, and it cites the commissioning procedure HAD 103/02-1987. It was issued on 11 July 2022 and has applied since 1 February 2023.

Found what you need?

Document preview — GB/T 41585-2022

National Standard of the People's Republic of China

ICS
27.120.20
Classification
F 63

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 The basic content and writing requirements of the debugging outline
  • 4.1 Overview
  • 4.2 Division of commissioning stages and main test contents of each stage
  • 4.3 Commissioning plan
  • 4.4 Commissioning organization, responsibilities and personnel
  • 4.5 Debug files
  • 4.6 Implementation of Debugging
  • 4.7 Nuclear safety management and quality management during commissioning
  • 4.8 Debug Manager
  • 4.9 Appendix
  • 4.10 Typical Commissioning Outline Section
  • Appendix A (Informative) Example of NPP Commissioning Test Project
  • Appendix B (Informative) Typical Commissioning Outline Chapter Example

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.

1 Scope

This document specifies the basic content and preparation requirements of the PWR NPP commissioning program.

This document is applicable to the compilation of the commissioning program for pressurized water reactor nuclear power plants.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.

HAD103/02-1987 Nuclear Power Plant Commissioning Procedure

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Commissioning

The process of operating installed nuclear power plant components and systems and verifying that their performance conforms to design requirements and related criteria.

Note: Commissioning includes tests without nuclear reactions and with nuclear reactions.

3.2 First-of-a-kind test; FOAK test

Brand new, unique or special commissioning trials for structures, systems and equipment with new conceptual design and new design characteristics in the new series of pressurized water reactor nuclear power models.

4 The basic content and writing requirements of the debugging outline

4.1 Overview

4.1.1 Project Overview

The commissioning program shall briefly describe the general situation of the nuclear power plant project, overall technical characteristics, project management and commissioning management mode, etc.

4.1.2 Purpose of preparation

The commissioning outline is used to guide commissioning preparation and implementation, standardize commissioning activities, ensure the safety of commissioning activities, and meet relevant national legal, regulatory and design requirements.

4.1.3 Debugging Purpose

The commissioning program should clearly define the expected purpose that the commissioning activities of the NPP should achieve, mainly including:

a) comprehensive inspection of design, equipment manufacturing and construction and installation quality;

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Referenced standards

Normative references

HAD103/02-1987

Similar standards

How to Download GB/T 41585-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 41585-2022

$360.00