NB/T 20132-2012Design Requirements of Personnel Airlock for Containment in Pressurized Water Reactor Nuclear Power Plants (English PDF)
压水堆核电厂安全壳人员气闸门设计要求
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20132-2012 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
January 6, 2012
Implementation date
April 6, 2012
Scope
NB/T 20132-2012 is the English-translated version of 压水堆核电厂安全壳人员气闸门设计要求.
NB/T 20132-2012 is the Chinese energy industry standard for the personnel airlock that serves the containment of a pressurized water reactor nuclear power plant.
It lays down the technical requirements for the design of that airlock and for its testing. The standard is intended for the design of containment personnel airlocks in domestic PWR plants, and airlocks for the containments of other reactor types may be designed by reference to it.
It is classified F69 in the Chinese scheme and 27.120.10 internationally, and it quotes GB/T 16702-1996, NB/T 20018-2010, EJ/T 926-1995, HAF 102 and HAD 102/06. Issued on 6 January 2012, it has applied since 6 April 2012.
Found what you need?
Document preview — NB/T 20132-2012
National Standard of the People's Republic of China
- ICS
- 27.120.10
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20132-2012 cites the following standards, which apply in full or in part through the references made to them in its clauses.
GB/T 16702-1996
NB/T 20018-2010
EJ/T 926-1995
HAF 102
HAD 102/06
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download NB/T 20132-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
HAF 102-2016 — Safety regulation for design of nuclear power plant
NB/T 20018-2010 — Containment Leak Tightness Test for Nuclear Power Plants
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20132-2012
$105.00