NB/T 20201-2013Technical Specifications of Social Environment Investigations Adjacent to the Site of Nuclear Power Plants (English PDF)
核电厂厂址区域社会环境调查技术规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20201-2013 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
June 8, 2013
Implementation date
October 1, 2013
Scope
NB/T 20201-2013 is the English-translated version of 核电厂厂址区域社会环境调查技术规范.
NB/T 20201-2013 is a recommended Chinese energy industry standard giving the technical specification for surveying the social environment around the site of a nuclear power plant.
It belongs to the siting group of nuclear power documents, with Chinese classification F63 and international classification 27.120.99, and was issued by the National Energy Administration.
As a specification it governs how such a survey of the surroundings adjacent to the site is planned, carried out and set down, rather than the design of any plant system.
It quotes HAD 101/03. Issued on 8 June 2013, it has applied since 1 October 2013.
Found what you need?
Document preview — NB/T 20201-2013
National Standard of the People's Republic of China
- ICS
- 27.120.99
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20201-2013 cites the following standards, which apply in full or in part through the references made to them in its clauses.
HAD 101/03
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
HAD 101/03
Similar standards
How to Download NB/T 20201-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
NB/T 10116-2025 — Recommended Practices for Reducing the Impact of Hydraulic Fracturing Operations on the Surface Environment
Secure payment via Stripe
Payments accepted
NB/T 20201-2013
$319.00