NB/T 20371-2016Specification for pressurizer installation in PWR nuclear power plant (English PDF)
压水堆核电厂稳压器安装技术规程
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 20371-2016 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
February 5, 2016
Implementation date
July 1, 2016
Scope
NB/T 20371-2016 is the English-translated version of 压水堆核电厂稳压器安装技术规程.
NB/T 20371-2016 is the Chinese energy industry standard covering the installation of the pressurizer in a pressurized water reactor nuclear power plant. It lays down the technical and acceptance requirements for fitting the reactor coolant system pressurizer during construction of the plant.
The requirements are addressed to pressurized water reactor units of the 600,000-kilowatt class, and the work is accepted on that basis. NB/T 20233, HAD 003/04 and HAD 003/07 are cited as companion documents.
Classified F65 in the Chinese system and 27.120.20 internationally, it is a recommended standard published by the National Energy Administration. Issued on 5 February 2016, it has applied since 1 July 2016.
Found what you need?
Document preview — NB/T 20371-2016
National Standard of the People's Republic of China
- ICS
- 27.120.20
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 20371-2016 cites the following standards, which apply in full or in part through the references made to them in its clauses.
NB/T 20233
HAD 003/04
HAD 003/07
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
HAD 003/04 · HAD 003/07
Similar standards
How to Download NB/T 20371-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 20233-2013 — Cleaning and cleanliness requirements for nuclear steam supply system equipment of PWR nuclear power plants
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 20371-2016
$105.00