Valid

GB/T 17626.2-2018Electromagnetic compatibility -- Testing and measurement techniques -- Electrostatic discharge immunity test (English PDF)

Also coversGBT17626.2-2018

Open the GB/T 17626.2-2018 preview as PDF

Preview — first pages of GB/T 17626.2-2018

This is a limited preview

Buy now to download the full PDF

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

June 7, 2018

Implementation date

January 1, 2019

Scope

GB/T 17626.2-2018 (Electromagnetic compatibility -- Testing and measurement techniques -- Electrostatic discharge immunity test) is available as an English-translated PDF.

GB/T 17626.2-2018 — This Part of GB/T 17626 relates to the immunity requirements and test methods for electrical and electronic equipment subjected to static electricity discharges, from operators directly, and from personnel to adjacent objects. It additionally defines ranges of test levels which relate to different environmental and installation conditions and establishes test procedures.

Document preview — GB/T 17626.2-2018

National Standard of the People's Republic of China

Issued by: SAMR; SAC

Contents

  • Foreword...4
  • 1 Scope...8
  • 2 Normative References...9
  • 3 Terms and Definitions...9
  • 4 General...12
  • 5 Test Levels...12
  • 6 Test Generator...13
  • 6.1 General...13
  • 6.2 Characteristics and performance of the ESD generator...14
  • 6.3 Verification of the ESD setup...17
  • 7 Test Setup...18
  • 7.1 Test equipment...18
  • 7.2 Test setup for tests performed in laboratories...18
  • 7.3 Test setup for post-installation tests...26
  • 8 Test Procedure...27
  • 8.1 Laboratory reference conditions...27
  • 8.2 EUT exercising...28
  • 8.3 Execution of the test...28
  • 9 Evaluation of Test Results...32
  • 10 Test Report...33
  • Annex A (Informative) Explanatory Notes...34

Foreword

GB/T 17626 Electromagnetic Compatibility - Testing and Measurement Techniques

currently contains the following parts.

--- GB/T 17626.1-2006 Electromagnetic Compatibility - Testing and Measurement

Techniques - Overview of Immunity Tests;

--- GB/T 17626.2-2018 Electromagnetic Compatibility - Testing and Measurement

Techniques - Electrostatic Discharge Immunity Test;

--- GB/T 17626.3-2016 Electromagnetic Compatibility - Testing and Measurement

Techniques - Radiated, Radio-Frequency, Electromagnetic Field Immunity Test;

--- GB/T 17626.4-2018 Electromagnetic Compatibility - Testing and Measurement

Techniques - Electrical Fast Transient/Burst-immunity Test;

--- GB/T 17626.5-2008 Electromagnetic Compatibility - Testing and Measurement

Techniques - Surge Immunity Test;

--- GB/T 17626.6-2017 Electromagnetic Compatibility - Testing and Measurement

Techniques - Immunity to Conducted Disturbances, Induced by Radio-

Frequency Fields;

--- GB/T 17626.7-2008 Electromagnetic Compatibility - Testing and Measurement

Techniques - General Guide on Harmonics and Inter-Harmonics Measurements

and Instrumentation for Power Supply Systems and Equipment;

--- GB/T 17626.8-2006 Electromagnetic Compatibility - Testing and Measurement

Techniques - Power Frequency Magnetic Field Immunity Test;

--- GB/T 17626.9-2011 Electromagnetic Compatibility - Testing and Measurement

Techniques - Pulse Magnetic Field Immunity Test;

--- GB/T 17626.10-2017 Electromagnetic Compatibility - Testing and Measurement

Techniques - Damped Oscillatory Magnetic Field Immunity Test;

--- GB/T 17626.11-2008 Electromagnetic Compatibility - Testing and Measurement

Techniques - Voltage Dips, Short Interruptions and Voltage Variations Immunity

Tests;

--- GB/T 17626.12-2013 Electromagnetic Compatibility - Testing and Measurement

Techniques - Ring Wave Immunity Test;

--- GB/T 17626.13-2006 Electromagnetic Compatibility - Testing and Measurement

Techniques - Harmonics and Inter-Harmonics including Mains Signaling at A.C.

Power Port Low Frequency Immunity Test;

--- GB/T 17626.14-2005 Electromagnetic Compatibility - Testing and Measurement

Techniques - Voltage Fluctuation Immunity Test;

--- GB/T 17626.15-2011 Electromagnetic Compatibility - Testing and Measurement

Techniques - Flicker-Meter - Functional and Design Specifications;

--- GB/T 17626.16-2007 Electromagnetic Compatibility - Testing and Measurement

Techniques - Test for Immunity to Conducted Common Mode Disturbances in the

Frequency Range 0 Hz to 150 kHz;

--- GB/T 17626.17-2005 Electromagnetic Compatibility - Testing and Measurement

Techniques - Ripple on D.C. Input Power Port Immunity Test;

--- GB/T 17626.18-2016 Electromagnetic Compatibility - Testing and Measurement

Techniques - Damped Oscillatory Wave Immunity Test;

--- GB/T 17626.20-2014 Electromagnetic Compatibility - Testing and Measurement

Techniques - Emission and Immunity Testing in Transverse Electromagnetic

(TEM) Waveguide;

--- GB/T 17626.21-2014 Electromagnetic Compatibility - Testing and Measurement

Techniques - Reverberation Chamber Test Methods;

--- GB/T 17626.22-2017 Electromagnetic Compatibility - Testing and Measurement

Techniques - Radiated Emissions and Immunity Measurements in Fully

Anechoic Rooms (Fars);

--- GB/T 17626.24-2012 Electromagnetic Compatibility - Testing and Measurement

Techniques - Test Methods for Protective Devices for HEMP Conducted

Disturbance;

--- GB/T 17626.27-2006 Electromagnetic Compatibility - Testing and Measurement

Techniques - Unbalance Immunity Test;

--- GB/T 17626.28-2006 Electromagnetic Compatibility - Testing and Measurement

Techniques - Variation of Power Frequency Immunity Test;

--- GB/T 17626.29-2006 Electromagnetic Compatibility - Testing and Measurement

Techniques - Voltage Dips Short Interruptions and Voltage Variations on D.C.

Input Power Port Immunity Tests;

--- GB/T 17626.30-2012 Electromagnetic Compatibility - Testing and Measurement

Techniques - Power Quality Measurement Methods;

--- GB/T 17626.34-2012 Electromagnetic Compatibility - Testing and Measurement

Techniques - Voltage Dips, Short Interruptions and Voltage Variations Immunity

Tests for Equipment with Mains Current more than 16 A per Phase.

This Part is Part 2 of GB/T 17626.

This Part was drafted as per the rules specified in GB/T 1.1-2009.

This Part replaced GB/T 17626.2-2006 Electromagnetic Compatibility (EMC) - Testing

and Measurement Techniques - Electrostatic Discharge Immunity Test.

Compared with GB/T 17626.2-2006, this Part has the major technical changes as

follows.

--- Increase calibration procedures and measurement uncertainty in the Scope;

--- Increase terminology. calibration, conformance test, rise time, verification;

--- Modify Clause 5.Test Levels;

--- Increase charging switch in the test generator;

--- Modify the diagram of electrostatic discharge generator;

--- Increase the characteristics and performance of the ESD generator (see 6.2);

--- Add verification of ESD setup (see 6.3);

--- Add A.8 (see Annex A);

--- Modify Annex B into Calibration of the current measurement system and

measurement of discharge current;

--- Add Annex C. Example of a calibration target meeting the requirements;

--- Add Annex D. Radiated fields from human metal discharge and ESD;

--- Add Annex E. Measurement uncertainty (MU) considerations;

--- Add Annex F. Variation in test results and escalation strategy.

This Part uses the translation method to equivalently adopt IEC 61000-4-2.2008

Electromagnetic Compatibility (EMC) - Part 4-2.Testing and Measurement

Techniques - Electrostatic Discharge Immunity Test.

The Chinese document that has a consistent correspondence with the international

documents quoted in the Normative References of this Part is as follows.

--- GB/T 2421-2008 Environmental Testing for Electric and Electronic Products -

Part 1.General and Guidance (IEC 60068-1.1988, IDT).

This Part made the following editorial changes.

--- To be consistent with the current serial standards, modify the name of this Part

into Electromagnetic Compatibility - Testing and Measurement Techniques -

Electrostatic Discharge Immunity Test.

This Part was proposed by and under the jurisdiction of National Technical Committee

for Standardization of Electromagnetic Compatibility (SAC/TC 246).

Drafting organizations of this Part. Shanghai Institute of Process Automation &

Instrumentation Co., Ltd.; Shanghai Institute of Measurement and Testing Technology;

Shanghai Electrical Apparatus Research Institute; Beijing Orient Institute of

Measurement and Test; The Army Engineering University; and Shanghai Inspection

and Testing Institute of Instruments and Automation System.

Chief drafting staffs of this Part. Wang Ying, Yu Lei, Gong Zeng, Song Jiangwei, Liu

Zhihong, Hu Xiaofeng, Yuan Qingyun, Zhang Yixiang, Weng Haifeng, and Yang Kai.

The historical edition replaced by this Standard is as follows.

--- GB/T 17626.2-2006.

1 Scope

This Part of GB/T 17626 relates to the immunity requirements and test methods for

electrical and electronic equipment subjected to static electricity discharges, from

operators directly, and from personnel to adjacent objects. It additionally defines

ranges of test levels which relate to different environmental and installation conditions

and establishes test procedures.

2 Normative References

The following referenced documents are indispensable for the application of this

document. For dated references, only the edition cited applies. For undated references,

the latest edition of the referenced document (including any amendments) applies.

GB/T 4365-2003 Electrotechnical Terminology - Electromagnetic Compatibility

[IEC 60050(161).1990, IDT]

IEC 60068-1 Environmental Testing - Part 1.General and Guidance

3 Terms and Definitions

The following terms and definitions stipulated in GB/T 4365-2003 are applicable to this

document. For the sake of use, some terms and definitions in GB/T 4365-2003 are

repeatedly listed as follows.

3.1 Air discharge method

Method of testing in which the charged electrode of the test generator is moved

towards the EUT until it touches the EUT.

3.2 Antistatic material

Material exhibiting properties which minimize charge generation when rubbed against

or separated from the same or other similar materials.

4 General

This standard relates to equipment, systems, subsystems and peripherals which may

be involved in static electricity discharges owing to environmental and installation

conditions, such as low relative humidity, use of low-conductivity (artificial-fiber)

carpets, vinyl garments, etc., which may exist in all locations classified in standards

relevant to electrical and electronic equipment.

5 Test Levels

Contact discharge is the preferred test method. Air discharges shall be used where

contact discharge cannot be applied. Voltages for each test method are given in Table

1 The voltages shown are different for each method due to the differing methods of

test. This does not imply that the test severity is equivalent between test methods.

6 Test Generator

6.1 General

The generator shall meet the requirements given in 6.2 when evaluated according to

the procedures in Annex B. Therefore, neither the diagram in Figure 1, nor the element

values are specified in detail.

6.2 Characteristics and performance of the ESD generator

The test generator shall meet the specifications given in Tables 2 and 3.Figure 2 shows

an ideal current waveform and the measurement points referred to in Tables 2 and 3.

7 Test Setup

7.1 Test equipment

The preferred test method is that of type tests performed in laboratories.

The EUT shall be arranged in accordance with the manufacturer's instructions for

installation (if any).

7.2 Test setup for tests performed in laboratories

7.2.1 Test requirements

The following requirements apply to tests performed in laboratories under

environmental reference conditions outlined in 8.1.

8 Test Procedure

8.1 Laboratory reference conditions

8.1.1 Environmental parameters

In order to minimize the impact of environmental parameters on test results, the tests

and calibration shall be carried out in climatic and electromagnetic reference conditions

as specified in 8.1.2 and 8.1.3.

8.1.2 Climatic conditions

The EUT shall be operated within its intended climatic conditions.

In the case of air discharge testing, the climatic conditions shall be within the following

ranges.

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

Normative references

GB/T 4365-2003 · IEC 60050 · IEC 60068

Cited by

How to Buy GB/T 17626.2-2018

  1. 1Add to cart. Click the "Buy GB/T 17626.2-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 17626.2-2018

$640.00

$545.00for partners