GB/T 3048.12-2025Test methods for electrical properties of electric cables and wires - Part 12: Partial discharge test (English PDF)
电线电缆电性能试验方法 第12部分:局部放电试验
This is a limited preview
Buy now to download the full PDF (14 pages)
Need quotation for your management?
Get a formal quotation for GB/T 3048.12-2025 in 30 minutes.
Issued by
State Administration for Market Regulation
Level / Type
National · Recommended
Issue date
October 5, 2025
Implementation date
May 1, 2026
Scope
GB/T 3048.12-2025 is the English-translated version of 电线电缆电性能试验方法 第12部分:局部放电试验.
GB/T 3048.12-2025 — This document describes the test method for partial discharge of wires and cables, including test equipment, sample preparation, test procedure, precautions, and testing...
Calibration and testing records of the testing equipment. This document is applicable to measuring partial discharge in extruded insulated power cables of different lengths.
This document is not applicable to partial discharge measurements after cable system installation.
Found what you need?
Document preview — GB/T 3048.12-2025
National Standard of the People's Republic of China
- ICS
- 29.060.20
- Classification
- K 13
- Replacing
- GB/T 3048.12-2007
Issued by: State Administration for Market Regulation
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative References
- 3 Terms and Definitions
- 4 Test Equipment
- 5 Sample Preparation
- 6 Experimental Procedure
- 7 Precautions 8.
- 8 Calibration of test equipment 9.
- 9 Experimental Records
- Appendix A (Informative) This document corresponds to the structural numbering of IEC 60885-3:2015.10
- Appendix B (Normative) Requirements for Termination Impedance
- Appendix C (Normative) Method for Plotting Double Pulse Curves
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".
Drafting.
This document is Part 12 of GB/T 3048 "Test Methods for Electrical Properties of Wires and Cables". GB/T 3048 has published the following...
part.
---Part 1: General Provisions;
---Part 2: Resistivity Testing of Metallic Materials;
---Part 3: Volume Resistivity Tests for Semiconducting Rubber and Plastic Materials;
---Part 4: Conductor DC Resistance Test;
---Part 5: Insulation Resistance Test;
---Part 7: Tracking Resistance Test;
---Part 8: AC Voltage Test;
---Part 9: Spark Test of Insulated Wire Cores;
---Part 10: Spark Test for Extruded Sheaths;
---Part 11: Dielectric Loss Tangent Test;
---Part 12: Partial Discharge Tests;
---Part 13: Impulse Voltage Test;
---Part 14: DC Voltage Test;
---Part 16: Surface Resistance Test.
This document supersedes GB/T 3048.12-2007 "Test Methods for Electrical Properties of Wires and Cables - Part 12: Partial Discharge Test", and is consistent with...
Compared with GB/T 3048.12-2007, apart from structural adjustments and editorial changes, the main technical changes are as follows.
---The detection sensitivity has been changed (see 4.2.6, 2007 version 4.2.6);
---The expression of measurement results has been changed (see 4.2.6, 6.2.2, 6.3.2, 6.3.3, 6.4.2, 6.4.3.2, and 4.2.6 and 6.2.2 in the 2007 edition).
6.2.3, 6.3.2, 6.3.3, 6.4.2, 6.4.3.2).
This document is modified to adopt IEC 60885-3:2015 "Test methods for electrical properties of cables - Part 3: Partial discharge of whole extruded power cables".
Test Methods.
This document has undergone significant structural adjustments compared to IEC 60885-3:2015.A comparison of the structural numbering changes between the two documents is provided below.
See Appendix A for the table.
The technical differences between this document and IEC 60885-3:2015, and the reasons therefor, are as follows.
---The normative reference GB/T 3048.1 (see 3.5.1) has been added to adapt to my country's technical conditions and increase operability;
---Chapter 4 of IEC 60885-3:2015, which contained a description of partial discharge, has been deleted;
---The normative reference GB/T 3048.8-2025 (see 6.6.1, 7.2) has been added to increase the operability of the test;
---The normative reference JB/T 10435 (see 7.4, Chapter 8) has been added to adapt to my country's technical conditions and increase operability;
---Change 5.6 of IEC 60885-3:2015 to Appendix B because the "requirements for terminating impedance" are mainly based on theoretical estimations and are relatively few.
The measurement method used;
---Change 5.5 of IEC 60885-3:2015 to Annex C, because "drawing a double-pulse diagram" is not necessary for cable partial discharge testing.
The steps are for the verification of test circuits only;
---The types and requirements for test terminals have been expanded (see 5.2) because cable terminals without partial discharge are essential for partial discharge testing techniques.
An important component;
---Added precautions (see Chapter 7) to improve cable partial discharge testing techniques.
The following editorial changes have been made to this document.
---To align with existing standards, the standard title has been changed to "Test Methods for Electrical Properties of Wires and Cables - Part 12: Partial Discharge Test";
---Added Appendix A (information) "Comparison of chapter and clause numbers in this document with those in IEC 60885-3:2015".
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed by the China Electrical Equipment Industry Association.
This document is under the jurisdiction of the National Technical Committee on Standardization of Wires and Cables (SAC/TC213).
Introduction
Wires and cables are widely used in power transmission and signal transmission, and various types of products are available depending on the application scenario. Electrical performance is a key evaluation criterion.
GB/T 3048 is an important general indicator of the performance of electrical wires and cables, and is of great significance for ensuring the design and use objectives of electrical wires and cables.
GB/T 3048 establishes universal fundamental test methods applicable to the electrical performance testing of different types of wires and cables. It is proposed that these methods be developed by the following 14 departments.
Composition.
---Part 1: General Provisions. This document aims to define the terminology, definitions, and general provisions for testing the electrical properties of wires and cables.
---Part 2: Resistivity Testing of Metallic Materials. The purpose is to specify the testing methods and requirements for the resistivity of metallic materials in wires and cables.
---Part 3: Volume Resistivity Test for Semiconducting Rubber and Plastic Materials. The purpose is to determine the volume resistivity of semiconducting rubber and plastic materials used in wires and cables.
Test methods and requirements for resistivity.
---Part 4: DC Resistance Test for Conductors. The purpose is to specify the test methods and requirements for the DC resistance of conductors in wires and cables.
---Part 5: Insulation Resistance Test. The purpose is to specify the test methods and requirements for the insulation resistance of wires and cables.
---Part 7: Tracking Resistance Test. The purpose is to specify the test methods and requirements for the tracking resistance of wires and cables.
---Part 8: AC Voltage Test. The purpose is to specify the test methods and requirements for AC voltage of wires and cables.
---Part 9: Spark Test of Insulated Cores. The purpose is to specify the test methods and requirements for spark testing of insulated cores in electrical wires and cables.
---Part 10: Spark Test for Extruded Sheaths. The purpose is to specify the test method and procedures for the spark test when extruding the corrosion-resistant sheath of wires and cables.
Require.
---Part 11: Dielectric Loss Tangent Test. The purpose is to specify the test method for the dielectric loss tangent of wires and cables.
Require.
---Part 12: Partial Discharge Tests. The purpose is to specify the test methods and requirements for partial discharge in wires and cables.
---Part 13: Impulse Voltage Test. The purpose is to specify the test methods and requirements for impulse voltage of wires and cables.
---Part 14: DC Voltage Test. The purpose is to specify the test methods and requirements for DC voltage of wires and cables.
---Part 16: Surface Resistance Test. The purpose is to specify the test methods and requirements for the surface resistance of wires and cables.
Note. The original GB/T 3048 standard system had 16 parts, but GB/T 3048.5-2007 replaced GB/T 3048.5-1994 and GB/T 3048.6-GB/T 3048.9-2007 replaced GB/T 3048.9-1994 and GB/T 3048.15-1994, therefore the current GB/T 3048 standard system has fewer standards.
Parts 6 and 15.
Test methods for electrical properties of wires and cables Part 12: Partial Discharge Test
1 Scope
This document describes the test method for partial discharge of wires and cables, including test equipment, sample preparation, test procedure, precautions, and testing...
Calibration and testing records of the testing equipment.
This document is applicable to measuring partial discharge in extruded insulated power cables of different lengths.
This document is not applicable to partial discharge measurements after cable system installation.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 3048.1 Test methods for electrical properties of wires and cables - Part 1: General principles GB/T 3048.8-2025 Electrical Performance Tests for Wires and Cables - Part 8: AC Voltage Tests GB/T 7354-2018 Partial Discharge Measurement using High Voltage Testing Techniques (IEC 60270:2000, MOD) Note. There are no technical differences between the content referenced in GB/T 7354-2018 and the content referenced in IEC 60270:2000.
JB/T 10435 Verification Method for Partial Discharge Test System of Cable
3 Terms and Definitions
The terms and definitions defined in GB/T 3048.1 and GB/T 7354-2018 apply to this document.
4 Test Equipment
4.1 Test Circuit
4.1.1 Composition of the test circuit
The test circuit consists of a high-voltage power supply, a high-voltage voltmeter, a measuring circuit, a discharge quantity calibrator, a dual-pulse generator, and, if necessary, a terminating resistor.
It consists of anti-reflection or anti-reflection suppressors, etc. The noise level of all components of the test equipment should be low enough to achieve the required sensitivity.
Note. High voltage is rarely measured using a high voltage voltmeter; a voltage divider is usually used instead.
4.1.2 High-voltage power supply
A test transformer or a series resonant device should be used to generate the test voltage. Regardless of the test equipment used, the test power supply should meet the requirements.
The voltage and capacitance current required for the test are met.
The test power supply should be an AC power supply with a frequency of 45Hz~55Hz, and the test voltage waveform should be an approximate sine wave with two identical half-waves.
The ratio of peak value to root mean square (RMS) value should be 2 ± 0.05.
If the test cannot be conducted using the aforementioned frequency of the test power supply due to the cable length being too long, the supplier and the buyer shall agree to use a frequency not lower than [the specified frequency].
The test was conducted using a 10Hz AC voltage.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 14 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 3048.1Test methods for electrical properties of electric cables and wires - Part 1: General
- GB/T 3048.8-2025Test methods for electrical properties of electric cables and wires - Part 8: AC voltage test
- GB/T 7354-2018High-voltage test techniques -- Partial discharge measurements
- JB/T 10435Verification methods for partial discharge test systems of electric cables
IEC 60270
Cited by
- GB/T 28427-2026Cables for electrified railways - 27.5 kV single-phase AC power cables and cable accessories
- GB/T 11017.1-2024Power cables with cross-linked polyethylene insulation and their accessories for rated voltage of 66 kV(Um=72.5 kV)and 110 kV(Um=126 kV) - Part 1: Test methods and requirements
- GB 43069-2023Safety requirements for mine cable
- GB/T 9089.3-2023Electrical installations for outdoor sites under heavy conditions—Part 3: General requirements for equipment and ancillaries
- NB/T 11128-2023Rubber sheathed flexible cable for frequency converter equipment of coal mine
- GB/T 41629.1-2022Long AC submarine cables with cross-linked polyethylene insulation and their accessories for rated voltage of 500 kV(Um=550 kV)—Part 1: Test methods and requirements
How to Download GB/T 3048.12-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 3048.1-2007 — Test methods for electrical properties of electric cables and wires - Part 1: General
GB/T 3048.10-2007 — Test methods for electrical properties of electric cables and wires - Part 10: Spark test of extruded protective sheaths
GB/T 3048.11-2025 — Test methods for electrical properties of electric cables and wires — Part 11: Test for dielectric dissipation factor
Secure payment via Stripe
Payments accepted
GB/T 3048.12-2025
$350.00