GB/T 9652.1-2019Specification of hydraulic turbine governing systems (English PDF)
Also coversGBT9652.1-2019
Open the GB/T 9652.1-2019 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
January 1, 2020
Scope
GB/T 9652.1-2019 (Specification of hydraulic turbine governing systems) is available as an English-translated PDF.
GB/T 9652.1-2019 — This part of GB/T 9652 specifies the working conditions, technical requirements, scope of supply and spare parts, drawings and drawings of the turbine governing system. Information, nameplate, packaging, transportation and storage, warranty period, etc. This section applies to the design, manufacture and acceptance of the turbine governing system (including the pump turbine governing system).
Document preview — GB/T 9652.1-2019
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 working conditions
Foreword
GB/T 9652 is divided into the following two parts.
---GB/T 9652.1 "Technical conditions for turbine governing system";
---GB/T 9652.2 "Turbo Turbine Speed Control System Test".
This part is the first part of GB/T 9652.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GB/T 9652.1-2007 "Technical Conditions for Hydraulic Turbine Control System", compared with GB/T 9652.1-2007
The changes are as follows.
--- The scope of application has been modified (see Chapter 1);
--- Modified the working conditions (see 3.3, 3.4,.2007 version 3.3);
--- Considering that the mechanical hydraulic governor and analog circuit governor have been discontinued in China for more than ten years, the current turbine governor products are
It is a microcomputer type governor, so the relevant provisions of the mechanical hydraulic governor and the analog circuit electro-hydraulic governor have been deleted (see Table 2,.2007).
Versions 4.4.3.3, 4.6.1, Table 2);
--- Modified the speed dead zone assessment requirements (see 4.1.3);
--- Increased the technical requirements of the pump turbine governor system (see 4.3.12);
--- Adjusted and supplemented the manual and automatic no-load frequency swing assessment indicators (see 4.2.1, 4.2.2, 4.2.3);
--- In view of the actual status of the stationary time of the relay of the large-scale unit turbine governing system, the indicator of the stationary time evaluation of the relay
Adjustments have been made (see 4.2.4);
--- Adjusted and supplemented the 100% load assessment requirements (see 4.2.5);
--- Added technical requirements for frequency modulation and power regulation (see 4.2.6, 4.2.7);
--- Increased the technical requirements for the regulation of isolated networks (see 4.2.8);
---Modified the volume requirement for available oil for pressure tanks/accumulators (see 4.4.2);
--- Modified the standby pump starting conditions (see 4.4.5, 4.4.10);
--- Increased the division of pressure levels (see 4.4.12);
--- Increased the indicator requirements for the start interval of the oil pump motor (see 4.4.14);
--- Removed the terms of the through-flow governor (see 4.6.7 of the.2007 edition);
--- Increased the technical requirements of the impact turbine governing system and the turbine governing system with pressure regulating valve control (see 4.3.10,
4.3.11);
--- Increase the technical requirements of the two-way tubular tidal unit speed control system (see 4.3.13);
--- Increased the indicator requirements for the positional drift of the servomotor under manual conditions (see 4.3.19);
--- Increased the requirements for the oil pressure drift of the speed control system (see 4.3.20);
--- Adjusted and supplemented the technical requirements of the governor and hydraulic unit/component modules (see 4.5).
This section uses the redrafting method in accordance with IEC 61362.2012 "Guidelines for the specification of turbine control systems", with IEC 61362.2012
The degree of consistency is non-equivalent.
This part was proposed by China Electrical Equipment Industry Association.
This part is under the jurisdiction of the National Turbine Standardization Technical Committee (SAC/TC175).
This section is mainly drafted by. Tianjin Electric Science Research Institute Co., Ltd., China Institute of Water Resources and Hydropower Research Institute of Automation, three
Xia Hydropower Plant, Dongfang Motor Control Equipment Co., Ltd., China Hydropower Consulting Group East China Survey and Design Institute, Guodian Nanrui Technology Co., Ltd.
Co., Ltd., Changjiang Survey and Design Research and Research Co., Ltd., Wuhan Guoshang Sanlian Hydropower Equipment Co., Ltd., China Datang Group
Institute of Hydropower Research, Wuhan University, Xi'an University of Technology.
1 Scope
This part of GB/T 9652 specifies the working conditions, technical requirements, scope of supply and spare parts, drawings and drawings of the turbine governing system.
Information, nameplate, packaging, transportation and storage, warranty period, etc.
This section applies to the design, manufacture and acceptance of the turbine governing system (including the pump turbine governing system).
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 150.1 Pressure vessels - Part 1. General requirements
GB/T 150.2 Pressure Vessels Part 2. Materials
GB/T 150.3 Pressure Vessels Part 3. Design
GB/T 150.4 Pressure vessels - Part 4. Manufacture, inspection and acceptance
GB/T 191 packaging storage and transportation icon
GB/T 3047.1 Basic size series of panels, shelves and cabinets with a height of 20mm
GB/T 3797 electrical control equipment
GB/T 4588.1 Non-metallized hole single-sided printing board sub-specification
GB/T 4588.2 Metallized hole single-sided printing plate sub-specification
GB/T 8564 Hydrogenerator Set Installation Technical Specifications
GB/T 10886 three screw pump
GB 11120-2011 Turbine oil
GB/T 11805 Hydrogenerator set automation components (devices) and their systems basic technical conditions
GB/T 14039-2002 Hydraulic transmission oil solid particle pollution level code
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 20663 energy storage pressure vessel
GB/T 25133 hydraulic system assembly pipeline flushing method
Technical guidelines for grid-connected operation of DL/T 1245 turbine regulating system
JB/T 4711 Pressure Vessel Coating and Transport Packaging
JB/T 7036 hydraulic isolation accumulator technical conditions
JB/T 7041 hydraulic gear pump
JB/T 8091 screw pump test method
3 working conditions
3.1 The maximum stroke of the servomotor is compatible with the full opening of the guide vane. For medium, small and extra small speed controllers, the actual maximum opening of the vanes corresponds to at least
More than 80% of the maximum stroke of the servo. The working capacity selection of the governor and the hydraulic device is suitable.
3.2 Pipe installation, welding, cleaning and inspection shall comply with the provisions of GB/T 8564 and GB/T 25133.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 150.1Pressure vessels - Part 1: General requirements
- GB/T 150.2Pressure vessels - Part 2: Materials
- GB/T 150.3Pressure vessels - Part 3: Design
- GB/T 150.4Pressure vessels - Part 4: Fabrication, inspection and testing, and acceptance
- GB/T 191Graphical symbols marking for handling and storage of packages
- GB/T 3047.1Series of basic dimensions of panels,rack and cabinets for vertical increment of 20mm
GB/T 4588.1 · GB/T 4588.2 · GB 11120-2011 · GB/T 14039-2002 · GB/T 17626.4 · GB/T 25133 · JB/T 4711 · JB/T 7036 · JB/T 7041 · JB/T 8091
How to Buy GB/T 9652.1-2019
- 1Add to cart. Click the "Buy GB/T 9652.1-2019" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10886-2019 — Three screw pumps
GB/T 11805-2019 — General specifications for the automatic control components and devices and their systems for hydro-turbine generating sets
GB/T 150.1-2024 — Pressure vessels - Part 1: General requirements
Secure payment via Stripe
Payments accepted
GB/T 9652.1-2019
$160.00