GB/T 9652.1-2019Specification of hydraulic turbine governing systems (English PDF)
水轮机调速系统技术条件
This is a limited preview
Buy now to download the full PDF (30 pages)
Need quotation for your management?
Get a formal quotation for GB/T 9652.1-2019 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
January 1, 2020
Scope
GB/T 9652.1-2019 is the English-translated version of 水轮机调速系统技术条件.
GB/T 9652.1-2019 is the Chinese standard "Specification of hydraulic turbine governing systems". Its scope clause reads: This part of GB/T 9652 specifies the working conditions, technical requirements, scope of supply and spare parts, drawings and drawings of the turbine governing system.
Information, nameplate, packaging, transportation and storage, warranty period, etc. This section applies to the design, manufacture and acceptance of the turbine governing system (including the pump turbine governing system). Its clauses include working conditions.
Found what you need?
Document preview — GB/T 9652.1-2019
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 working conditions
- 4 Technical requirements
- 5 Scope of delivery and spare parts
- 6 Drawings and materials
- 7 Nameplate, packaging, transportation, storage
- 8 Guarantee period
1 Scope
This part of GB/T 9652 specifies the working conditions, technical requirements, scope of supply and spare parts, drawings and drawings of the turbine governing system.
Information, nameplate, packaging, transportation and storage, warranty period, etc.
This section applies to the design, manufacture and acceptance of the turbine governing system (including the pump turbine governing system).
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 150.1 Pressure vessels - Part 1. General requirements
GB/T 150.2 Pressure Vessels Part 2. Materials
GB/T 150.3 Pressure Vessels Part 3. Design
GB/T 150.4 Pressure vessels - Part 4. Manufacture, inspection and acceptance
GB/T 191 packaging storage and transportation icon
GB/T 3047.1 Basic size series of panels, shelves and cabinets with a height of 20mm
GB/T 3797 electrical control equipment
GB/T 4588.1 Non-metallized hole single-sided printing board sub-specification
GB/T 4588.2 Metallized hole single-sided printing plate sub-specification
GB/T 8564 Hydrogenerator Set Installation Technical Specifications
GB/T 10886 three screw pump
GB 11120-2011 Turbine oil
GB/T 11805 Hydrogenerator set automation components (devices) and their systems basic technical conditions
GB/T 14039-2002 Hydraulic transmission oil solid particle pollution level code
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 20663 energy storage pressure vessel
GB/T 25133 hydraulic system assembly pipeline flushing method
Technical guidelines for grid-connected operation of DL/T 1245 turbine regulating system
JB/T 4711 Pressure Vessel Coating and Transport Packaging
JB/T 7036 hydraulic isolation accumulator technical conditions
JB/T 7041 hydraulic gear pump
JB/T 8091 screw pump test method
3 working conditions
3.1
The maximum stroke of the servomotor is compatible with the full opening of the guide vane. For medium, small and extra small speed controllers, the actual maximum opening of the vanes corresponds to at least
More than 80% of the maximum stroke of the servo. The working capacity selection of the governor and the hydraulic device is suitable.
3.2
Pipe installation, welding, cleaning and inspection shall comply with the provisions of GB/T 8564 and GB/T 25133. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 150.1Pressure vessels - Part 1: General requirements
- GB/T 150.2Pressure vessels - Part 2: Materials
- GB/T 150.3Pressure vessels - Part 3: Design
- GB/T 150.4Pressure vessels - Part 4: Fabrication, inspection and testing, and acceptance
- GB/T 191Graphical symbols marking for handling and storage of packages
- GB/T 3047.1Series of basic dimensions of panels,rack and cabinets for vertical increment of 20mm
Cited by
- GB/T 14478-2025Basic technical specification of inlet valves for large and medium-sized hydraulic turbines
- GB/T 8564-2023Technical specification for installation of hydraulic turbine-generator unit
- GB/T 41369-2022Quality evaluation of comprehensive performance of units operation of small hydropower stations
- GB/T 40593-2021Guidelines for parameters measurement and modeling of synchronous generator governing system
- DL/T 1235-2019Guide for measurement and modeling of synchronous generator prime mover and its regulating system parameters
- DL/T 2020-2019Code of operation and maintenance for Pelton turbine
How to Download GB/T 9652.1-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 11120-2011 — Lubricating oils for turbines
GB/T 10886-2019 — Three screw pumps
GB/T 11805-2019 — General specifications for the automatic control components and devices and their systems for hydro-turbine generating sets
Secure payment via Stripe
Payments accepted
GB/T 9652.1-2019
$155.00