GB/T 40593-2021Guidelines for parameters measurement and modeling of synchronous generator governing system (English PDF)
同步发电机调速系统参数实测及建模导则
This is a limited preview
Buy now to download the full PDF (26 pages)
Need quotation for your management?
Get a formal quotation for GB/T 40593-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 11, 2021
Implementation date
May 1, 2022
Scope
GB/T 40593-2021 is the English-translated version of 同步发电机调速系统参数实测及建模导则.
GB/T 40593-2021 is a guide to measuring the parameters of the speed governing systems of synchronous generators and building the models used in power system stability studies.
It covers steam turbine units, including thermal, nuclear and solar thermal plants, hydro units including pumped storage, and gas and combined cycle units, and other types may follow it by reference.
The document defines the governing system, control system and actuator, and sets out general requirements, test conditions, the governing system models, parameter measurement and identification, simulation verification, and the final confirmation of model parameters with a stability check.
Annexes give parameter collection sheets, common models and signal acquisition. Grid operators, test institutes and plant owners use it. It was issued on 11 October 2021 and has applied since 1 May 2022.
Found what you need?
Document preview — GB/T 40593-2021
National Standard of the People's Republic of China
- ICS
- 29.020
- Classification
- F 21
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 General requirements
- 5 Test condition
- 6 Speed control system model
- 7 Parameter measurement and identification
- 8 Simulation verification
- 9 Model parameter confirmation and stability check
- Appendix A (Informative) Parameter Collection
- Appendix B (Informative) Common Model
- Appendix C (Informative) Signal Acquisition
- References
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
1 Scope
This document specifies the synchronous generator speed control system model, parameter measurement and identification, simulation verification and simulation for power system stability analysis and calculation. Type parameter confirmation and stability check requirements.
This document applies to steam turbine generator units (thermal power units, nuclear power units, solar thermal units, etc.), hydro-turbine generator units (including pumped storage units) And gas generator set (including gas-steam combined cycle unit) speed control system parameter measurement and modeling, other types of synchronous generator speed control system The system is implemented by reference.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 9652.1 Technical conditions of hydraulic turbine governing system
GB/T 14100 Gas Turbine Acceptance Test
GB 38755 Safety and Stability Guidelines for Power Systems
GB/T 40594 Technical Guidelines for Power System Network Source Coordination
GB/T 40595 Grid-connected power supply primary frequency modulation technical regulations and test guidelines
DL/T 824 Guidelines for Performance Acceptance of Steam Turbine Electro-hydraulic Control System
DL/T 1235-2019 Synchronous generator prime mover and its regulation system parameter measurement and modeling guide
DL/T 2191 Technical specification for network performance simulation test of hydraulic turbine governor
DL/T 2194 Technical requirements and test guidelines for primary frequency regulation of hydroelectric generating units
3 Terms and definitions
The following terms and definitions defined in DL/T 1235-2019 apply to this document.
3.1 Governing system
A device that controls the speed and output power of a synchronous generator to maintain the normal operation of the unit.
Note: Including control system, actuator, prime mover and energy supply system, etc.
3.2 Control system
In order to control key parameters such as frequency/power, the control components and equipment provided.
3.3 Actuator
Accept the instructions of the prime mover's digital adjustment system to control valves, guide vanes (paddles) and other electrical/mechanical-hydraulic system devices. [Source: DL/T 1235-2019, 3.2]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 9652.1Specification of hydraulic turbine governing systems
- GB/T 14100Gas turbines -- Acceptance tests
- GB 38755Code on security and stability for power system
- GB/T 40594Technical guide for power grid and source coordination
- GB/T 40595Guide for technology and test on primary frequency control of grid-connected power resource
- DL/T 824Performance acceptance guidelines for steam turbine electro-hydraulic regulating systems
Similar standards
How to Download GB/T 40593-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1235-2019 — Guide for measurement and modeling of synchronous generator prime mover and its regulating system parameters
DL/T 2191-2020 — Technical specification for network performance simulation test of hydraulic turbine governor
DL/T 2194-2020 — Guide for technical requirements and test on primary frequency control of hydroelectric generating units
Secure payment via Stripe
Payments accepted
GB/T 40593-2021
$465.00