GB/T 33589-2026Technical requirements for connecting microgrids to the power system (English PDF)

微电网接入电力系统技术规定

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 33589-2026 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

April 30, 2026

Implementation date

November 1, 2026

Scope

GB/T 33589-2026 is the English-translated version of 微电网接入电力系统技术规定.

GB/T 33589-2026 states what a microgrid has to satisfy to be connected to a power system at 35 kV and below, and follows newly built, rebuilt and extended grid-connected microgrids from connection through commissioning to operation.

It sets the overall requirements, then the limits on the active power exchanged at the point of interconnection, the power factor range and the part the microgrid takes in voltage regulation, the operational adaptability to voltage deviation, flicker, harmonics and unbalance, and the safety rules on earthing, switching devices and warning signs.

Further clauses deal with power quality monitoring and the injected DC current component, with switching between grid-connected and islanded operation, relay protection, electric energy metering, communication and information, and with grid-connected testing.

It replaces GB/T 33589-2017, was issued on 30 April 2026 and applies from 1 November 2026.

Found what you need?

Document preview — GB/T 33589-2026

National Standard of the People's Republic of China

ICS
29.020
Classification
F 12
Replacing
GB/T 33589-2017

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope5
  • 2 Normative references5
  • 3 Terms and definitions6
  • 4 Overall requirements7
  • 5 Active power7
  • 6 Reactive voltage8
  • 7 Operational adaptability8
  • 8 Safety8
  • 9 Power quality9
  • 10 Operation mode switching9
  • 11 Relay protection11
  • 12 Electric energy metering11
  • 13 Communication and information11
  • 14 Grid-connected testing12
  • Bibliography14

1 Scope

This document specifies the overall requirements for connecting microgrid to power system, technical requirements such as active power, reactive voltage, operational adaptability, safety, power quality, operation mode switching, relay protection, electric energy metering, communication and information, as well as grid-connected testing.

This document applies to the connection, commissioning, and operation of newly built, renovated (expanded) grid-connected microgrids connected to the power grid at voltage levels of 35 kV and below.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

GB 2894 Safety colours and safety signs

GB/T 12325 Power quality - Deviation of supply voltage

GB/T 12326 Power quality - Voltage fluctuation and flicker

GB 14050 Types and safety technical requirements of system earthing

GB/T 14285 Technical code for relaying protection and security automatic equipment

GB/T 14549 Quality of electric energy supply - Harmonics in public supply network

GB/T 15543 Power quality - Three-phase voltage unbalance

GB/T 15945 Power quality - Frequency deviation for power system

GB/T 19862 General requirements for monitoring equipment of power quality

GB/T 22239 Information security technology - Baseline for classified protection of cybersecurity

GB/T 24337 Power quality - Interharmonics in public supply network

GB/T 33593 Technical requirements for grid connection of distributed resources

GB/T 33982 Technical specification for grid connection protection of distributed resources

GB/T 34129 Specification for test of microgrid connected to distribution network

GB/T 36572 Guidelines of cyber security protection for electric power system supervision and control

GB/T 36274 Technical specification for energy management system of microgrids

GB/T 38953 Technical requirements for relay protection of microgrid

DL/T 448 Technical administrative code of electric energy metering

DL/T 584 Setting guide for 3 kV ~ 110 kV power system protection equipment

3 Terms and definitions

For the purpose of this document, the terms and definitions defined in GB/T 33593, as well as the following apply.

3.1 Microgrid

A small-scale power supply and distribution system composed of distributed resources, power supply and distribution facilities, electrical loads, monitoring, protection, and automation devices, capable of achieving basic internal power and energy balance.

NOTE: Microgrids are divided into grid-connected microgrids and stand-alone microgrids.

3.2 Grid-connected microgrid

A microgrid that can operate both grid-connected and off-grid, but primarily operates in grid-connected mode.

3.3 Point of interconnection

Connection point between the microgrid and the external power grid.

NOTE: For microgrids with a step-up substation, this refers to the high-voltage side bus or node of the step-up substation. For microgrids without a step-up substation, this refers to the point where the microgrid and the external power grid converge to consume/output power.

3.4 Maximum output power into powergrid

The maximum value of power that a microgrid is allowed to output to the external power grid through the point of interconnection.

3.5 Maximum power consumed from powergrid

The maximum value of power that a microgrid is allowed to consume from the external power grid through the point of interconnection.

4 Overall requirements

4.1 A microgrid shall have power and energy self-balancing capability, be able to operate in coordination with the connected power system, and meet the power quality requirements for power supply and consumption.

4.2 The connection voltage level of a microgrid shall be determined based on its maximum output power into powergrid and power consumed from powergrid with the external power grid, after comprehensive technical and economic comparison, and shall not be lower than the highest AC voltage level within the microgrid.

4.3 When a microgrid is connected to the grid, the distributed resources within the microgrid shall meet the relevant requirements of GB/T 33593.

5 Active power

5.1 The active power exchanged between the microgrid and the external power grid shall not exceed the maximum output power into powergrid and the maximum power consumed from powergrid.

5.2 For microgrids connected to the grid at voltage levels of 10(6) kV ~ 35 kV, the output active power into powergrid and the active power consumed from powergrid at the point of interconnection shall be adjustable according to the instructions of the power dispatching agency or the frequency of the point of interconnection.

5.3 Microgrids connected to the grid at a voltage level of 380 V shall be able to receive and automatically execute active power control commands at the point of interconnection. Their maximum output power into powergrid and power consumed from powergrid, and power change rate can be set remotely or manually on-site.

6 Reactive voltage

6.1 For microgrids connected to the grid at voltage levels of 10(6) kV ~ 35 kV, the power factor at the point of interconnection shall be adjustable within the range of 0.98 (leading) ~ 0.98 (lagging). Within its reactive power output range, it shall have the ability to adjust reactive power output according to the voltage level of the point of interconnection and participate in grid voltage regulation. Parameters such as adjustment method, reference voltage, and voltage droop rate shall be set according to the requirements of the power dispatching agency.

6.2 For microgrids connected to the grid at a voltage level of 380 V, the power factor at the point of interconnection shall be adjustable within the range of 0.95 (leading) ~ 0.95 (lagging), and it should have the ability to participate in grid voltage regulation.

7 Operational adaptability

7.1 The microgrid shall be able to operate normally when the point of interconnection's voltage deviation meets the requirements of GB/T 12325, voltage fluctuation and flicker values meet the requirements of GB/T 12326, harmonic values meet the requirements of GB/T 14549, interharmonic values meet the requirements of GB/T 24337, and three-phase voltage unbalance meets the requirements of GB/T 15543.

7.2 The frequency adaptability of microgrids meets the requirements of Table 1.

8 Safety

8.1 The grounding method within the microgrid shall be consistent with the grounding method on the external power grid side, meeting the requirements for personal and equipment safety and protection coordination, and shall meet the relevant requirements of GB 14050.

8.2 For microgrids connected to the grid at voltage levels of 10(6) kV ~ 35 kV, an easily operable, interlockable switching device with a clearly visible break point, grounding function, and capable of interrupting fault current shall be installed at the point of interconnection. For microgrids connected to the grid at a voltage level of 380 V, an easily operable switch with a clearly visible break point and capable of interrupting fault current shall be installed at the point of interconnection.

8.3 For microgrids connected to the grid at voltage levels of 10(6) kV ~ 35 kV, warning signs such as "Beware of Electric Shock" shall be marked near electrical equipment and lines; for microgrids connected to the grid at a voltage level of 380 V, the dedicated low-voltage switchgear connecting the microgrid and the external power grid shall have prominent markings. The marking shall include warning text such as "Warning" and "Dual Power Supply" and symbols. The type, shape, color, size, and location of the markings shall comply with the provisions of GB 2894.

9 Power quality

9.1 Microgrids connected to the grid at voltage levels of 10(6) kV ~ 35 kV shall be equipped with a Class A online power quality monitoring device meeting the requirements of GB/T 19862 at the point of common coupling. Historical power quality monitoring data shall be retained for at least one year.

9.2 The harmonic injection current from the microgrid to the point of common coupling shall meet the requirements of GB/T 14549, and the resulting interharmonics shall meet the requirements of GB/T 24337.

9.3 After the microgrid is connected, the voltage deviation at the point of common coupling shall meet the requirements of GB/T 12325.

9.4 After the microgrid is connected, the voltage fluctuation and flicker at the point of common coupling shall meet the requirements of GB/T 12326.

9.5 After the microgrid is connected, the voltage unbalance at the point of common coupling shall meet the requirements of GB/T 15543.

9.6 The DC current component injected by the microgrid into the point of common coupling shall not exceed 0.5 % of the AC current value corresponding to the maximum exchange capacity agreed upon with the power grid.

10 Operation mode switching

10.1 Grid-connected startup

10.1.1 For microgrids connected to the grid at voltage levels of 10(6) kV ~ 35 kV, grid-connected startup shall be permitted by the power dispatching agency. […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Normative references

Editions of GB/T 33589

EditionTitleRevisionStatus
GB/T 33589-2026Technical requirements for connecting microgrids to the power systemcurrent editionCurrent
GB/T 33589-2017Technical requirements for connecting microgrids to the power systemprevious editionIn force until 1 November 2026

This page sells the current edition, GB/T 33589-2026. Earlier editions are listed for reference only.

How to Download GB/T 33589-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages