GB/T 42322-2023Energy internet system - Interconnection of active distribution network (English PDF)
能源互联网系统 主动配电网的互联
Open the GB/T 42322-2023 preview as PDF
This is a limited preview
Buy now to download the full PDF (21 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 17, 2023
Implementation date
October 1, 2023
Scope
GB/T 42322-2023 is the English-translated version of 能源互联网系统 主动配电网的互联.
GB/T 42322-2023 describes how an active distribution network connects to everything now hanging off it and to the wider energy internet around it. General requirements come first: the planning, design, operational control and information exchange of the network have to be coordinated with the energy internet architecture rather than bolted onto it afterwards. Physical interconnection is then taken point by point, covering the grid structure itself, distributed resources, microgrids, electric vehicle charging and battery swap infrastructure, energy storage, and end users. Information interconnection follows with the data exchanged with each of them, the communication modes, and the security protection around those links, and a closing clause deals with cyber-physical fusion, where measurement, analysis, decision and control are treated as one system rather than a network with monitoring attached. Informative annexes give typical AC and DC interconnection arrangements and the DC-side grid structure for a medium-voltage network. A feeder designed for power flowing one way starts behaving badly once storage, rooftop generation and fast chargers all sit on it, and each of those speaks a different protocol; without an agreed interconnection scheme the operator loses both control of the power flow and sight of what is happening. For distribution utilities, the designers of active distribution schemes, and the vendors of the resources connecting to them.
Document preview — GB/T 42322-2023
National Standard of the People's Republic of China
- ICS
- 29.240.01
- Classification
- F10
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative References4
- 3 Terms and Definitions5
- 4 General Requirements6
- 5 Physical Interconnection of Active Distribution Network7
- 5.1 Grid Structure7
- 5.2 Interconnection with Distributed Resources8
- 5.3 Interconnection with Microgrid8
- 5.4 Interconnection with Electric Vehicle Charging and Battery Swap Infrastructure9
- 5.5 Interconnection with Energy Storage9
- 5.6 Interconnection with Users10
- 6 Information Interconnection of Active Distribution Network12
- 6.1 Information Interaction12
- 6.2 Communication Mode15
- 6.3 Security Protection15
- 7 Cyber-Physical Fusion of Active Distribution Network15
- Appendix A (informative) Typical Interconnection Modes of AC and DC Distribution Networks17
- Appendix B (informative) DC Side Grid Structure of Medium-voltage Distribution Network19
- Bibliography21
Foreword
This document was issued on 17 March 2023 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 October 2023.
It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.
1 Scope
GB/T 42322-2023 describes how an active distribution network connects to everything now hanging off it and to the wider energy internet around it. General requirements come first: the planning, design, operational control and information exchange of the network have to be coordinated with the energy internet architecture rather than bolted onto it afterwards. Physical interconnection is then taken point by point, covering the grid structure itself, distributed resources, microgrids, electric vehicle charging and battery swap infrastructure, energy storage, and end users. Information interconnection follows with the data exchanged with each of them, the communication modes, and the security protection around those links, and a closing clause deals with cyber-physical fusion, where measurement, analysis, decision and control are treated as one system rather than a network with monitoring attached. Informative annexes give typical AC and DC interconnection arrangements and the DC-side grid structure for a medium-voltage network. A feeder designed for power flowing one way starts behaving badly once storage, rooftop generation and fast chargers all sit on it, and each of those speaks a different protocol; without an agreed interconnection scheme the operator loses both control of the power flow and sight of what is happening. For distribution utilities, the designers of active distribution schemes, and the vendors of the resources connecting to them.
This document specifies the general requirements for the interconnection of active distribution
network, as well as the requirements for the physical interconnection, information
interconnection and cyber-physical fusion of active distribution network under the energy
internet system.
This document is applicable to the planning, design and operation control of the active
distribution network under the energy internet system.
2 Normative References
The contents of the following documents constitute indispensable clauses of this document
through the normative references in the text. In terms of references with a specified date, only
versions with a specified date are applicable to this document. In terms of references without a
specified date, the latest version (including all the modifications) is applicable to this document.
GB/T 12325 Power Quality - Deviation of Supply Voltage
GB/T 14549 Quality of Electric Energy Supply - Harmonics in Public Supply Network
GB/T 15543 Power Quality - Three-phase Voltage Unbalance
GB/T 22239 Information Security Technology - Baseline for Classified Protection of
Cybersecurity
GB/T 24337 Power Quality - Interharmonics in Public Supply Network
GB/T 29328 Specific Configuration of Power Supply and Self-emergency Power Supply for
Important Power Users
GB/T 33589 Technical Requirements for Connecting Microgrid to Power System
GB/T 33593 Technical Requirements for Grid Connection of Distributed Resources
GB/T 36278 Technical Code for Electric Vehicle Charging / Battery Swap Infrastructure
Interconnecting to Distribution Network
GB/T 36547 Technical Rule for Electrochemical Energy Storage System Connected to Power
Grid
NOTE: 110 kV ~ 35 kV power grid is a high-voltage distribution network, 10 (20, 6) kV power
grid is a medium-voltage distribution network, and 220 / 380 V power grid is a low-voltage
distribution network.
3.3 active distribution network
Active distribution network is a distribution network that internally contains distributed power,
energy storage and demand response resources, and with the capabilities of flexible topology,
active control and operation management.
3.4 distributed resources
Distributed resources are the power supply that is connected to the power grid with a voltage
level of 35 kV and below, and located near the user, and mainly consumed locally at a voltage
level of 35 kV and below.
NOTE 1: including synchronous generator, asynchronous generator, converter and other types of
power supplies.
NOTE 2: including solar energy, natural gas, biomass energy, wind energy, water energy, hydrogen
energy, geothermal energy, ocean energy, comprehensive utilization of resources for
power generation (including coal-mine gas for power generation) and energy storage, etc.
[source: GB/T 33593-2017, 3.1, modified]
3.5 microgrid
Microgrid is a small-size power supply network composed of distributed power generation,
power load, monitoring, protection and automation devices (including energy storage devices
when necessary) and can basically achieve internal balance of electric power and energy.
NOTE: microgrid is divided into grid-connected microgrid and independent microgrid.
[source: GB/T 33589-2017, 3.2, modified]
3.6 cyber-physical systems
Cyber-physical systems are systems constructed by integrating advanced perception,
computation, communication, control and other information technologies and automatic control
technologies, so that humans, machines, objects, the environment, information and other
elements are mutually mapping, timely interacting and efficiently collaborating in the physical
space and cyberspace.
Remaining clauses in the full document
- 3 Terms and Definitions
- 4 General Requirements
- 5 Physical Interconnection of Active Distribution Network
- 6 Information Interconnection of Active Distribution Network
- 7 Cyber-Physical Fusion of Active Distribution Network
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 12325 Power Quality - Deviation of Supply VoltagePower quality - Deviation of supply voltage
- GB/T 14549 Quality of Electric Energy Supply - Harmonics in Public Supply NetworkQuality of electric energy supply--Harmonics inpublic supply network
- GB/T 15543 Power Quality - Three-phase Voltage UnbalancePower quality - Three-phase voltage unbalance
- GB/T 22239 Information Security Technology - Baseline for Classified Protection ofInformation security technology - Baseline for classified protection of cybersecurity
- GB/T 24337 Power Quality - Interharmonics in Public Supply NetworkPower quality - Interharmonics in public supply network
- GB/T 29328 Specific Configuration of Power Supply and Self-emergency Power Supply forSpeicific configuration of power supply and self-emergency power supply for important power users
Similar standards
How to Buy GB/T 42322-2023
- 1Add to cart. Click the "Buy GB/T 42322-2023" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 42322-2023
$260.00