Scope
GB/T 36274-2018 is the English-translated version of 微电网能量管理系统技术规范.
GB/T 36274-2018 sets out the technical requirements for the energy management system of a microgrid: its structure and configuration, working environment and conditions, system functions and performance indexes.
It applies to the construction, reconstruction and expansion of microgrids at a voltage level of 35 kV and below.
The software comprises operation system, supportive software and application software, with real-time and historical databases required at 10 kV and above, and communication with the monitoring system and the dispatching agency runs over twisted pair lines and optical fibre using DL/T 634.5101, DL/T 634.5104 and DL/T 860.
The functions covered include power generation forecasting, distributed power and fuel management, day-ahead and rolling generation and utilization plans, reactive voltage management and statistical analysis of energy, reliability and resource use. It was issued on 7 June 2018 and has applied since 1 January 2019.
Found what you need?
Document preview — GB/T 36274-2018
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative References4
- 3 Terms and Definitions4
- 4 General Principles5
- 5 Working Environment and Conditions5
- 6 System Structure and Configuration6
- 7 System Functions8
- 8 Performance Indexes11
1 Scope
This Standard specifies technical requirements of energy management system for microgrids, such as structure, configuration, working environment and conditions, system functions and performance indexes.
This Standard is applicable to the construction, reconstruction and expansion of microgrids (voltage level. 35 kV and below).
2 Normative References
The following documents are indispensable to the application of this Standard. In terms of references with a specified date, only versions with a specified date are applicable to this Standard. The latest version (including all the modifications) of references without a specified date is also applicable to this Standard.
GB/T 2887 General Specification for Computer Field
GB/T 20270 Information Security Technology - Basis Security Techniques Requirements for Network
GB 50174 Code for Design of Data Centers
DL/T 634.5101 Tele-control Equipment and Systems - Part 5-101. Transmission Protocols - Section 101. Companion Standard for Basic Tele-control Tasks
DL/T 634.5104 Tele-control Equipment and Systems - Part 5-104. Transmission Protocols - Network Access for IEC 60870-5-101 Using Standard Transport Profiles
DL/T 860 Communication Networks and Systems in Substations
DL/T 5136 Technical Code for Designing of Electrical Secondary Wiring in Fossil Fuel Power Plants and Substations
3 Terms and Definitions
The following terms and definitions are applicable to this Standard.
6 System Structure and Configuration
6.3 Software Configuration
6.3.1 Energy management system for microgrids shall include operation system, supportive software and application software.
6.3.2 Energy management system for microgrids (voltage level. 10 kV and above) shall be equipped with real-time database and historical database.
6.3.3 Supportive software shall include certain functional modules, such as data acquisition management, database management, network communication management, graphic management, statement management, authority management, alarm management and calculation statistics, etc.
6.4 Communication
6.4.1 Communication between microgrid energy management system and microgrid monitoring system shall adopt the mode of twisted pair lines and optical fiber communication; DL/T 634.5101, DL/T 634.5104 and DL/T 860 shall be adopted as communication protocols.
6.4.2 Communication between microgrid energy management system and power dispatching agency shall adopt the mode of twisted pair lines and optical fiber communication; DL/T 634.5101, DL/T 634.5104 and DL/T 860 shall be adopted as communication protocols.
7 System Functions
7.1 Power Generation Forecasting
7.1.1 In terms of microgrid system that includes intermittent power generation forms, such as wind power and photovoltaic power generation, microgrid energy management system shall be equipped with the function of resource monitoring.
7.1.2 In terms of microgrid system that includes intermittent power generation forms, such as wind power and photovoltaic power generation, microgrid energy management system shall be equipped with the function of corresponding power forecasting of wind power and photovoltaic power generation.
7.1.3 Microgrid energy management system shall forecast the power of power generation through historical and actually measured data; it shall also be able to receive data of power forecasting.
7.2 Distributed Power Management
7.2.1 Microgrid energy management system shall be equipped with the function of corresponding fuel management of power generation devices in the microgrid, such as gas turbine and diesel engine, etc. This function includes statistics of fuel […]
7.4
7.4.2 Microgrid energy management system shall include power generation and utilization plan a few days ago and within a few days. Power generation and utilization plan shall include the arrangement of output power plan within 24 h, starting from zero o'clock in the next day, with time resolution <= 15 min; the scrolling arrangement of output power plan from the current moment to the next 4 h, with scrolling in every 15 min and time resolution <= 15 min.
7.4.3 Microgrid energy management system shall arrange power generation plan in accordance with two modes, namely, manual input and automatic generation.
7.5 Voltage Reactive Management
7.5.1 Microgrid energy management system shall conduct optimal configuration of the operation of reactive voltage in the microgrid. The setting of reactive voltage operating mode includes power factor control mode, reactive power control mode and voltage control mode, etc. The set value or range of parameters of the selected control mode shall also be provided.
7.5.2 Microgrid energy management system shall be able to provide the set value or range of parameters of the selected reactive voltage operating mode, including voltage limit, reactive power limit, power factor limit, dead zone, time limit and gradient, etc.
7.5.3 Microgrid energy management system shall be equipped with the function of setting the input sequence of reactive power compensation equipment.
7.6 Statistical Analysis and Evaluation
7.6.1 In terms of microgrid that adopts wind power generation or photovoltaic power generation as the main power, microgrid energy management system shall conduct resource analysis in accordance with wind power and solar energy monitoring data.
7.6.2 Microgrid energy management system shall conduct statistical analysis of the internal power generation, utilization and storage system of the microgrid, as well as electric energy exchange between the microgrid and external system.
7.6.3 Microgrid energy management system shall analyze energy consumption and effectiveness of microgrid system operation; it shall also be equipped with the function of consumption analysis, energy conservation analysis, cost accounting and effectiveness analysis, etc.
7.6.4 Microgrid energy management system shall be equipped with the function of reliability analysis of microgrid power supply, including the analysis of power supply reliability, annual power outage time and number, etc.
7.6.5 Microgrid energy management system shall analyze the utilization of wind and optical resource in accordance with resource monitoring data and actual power generation and utilization data. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2887General specification for computer field
- GB/T 20270Information security technology Basis security techniques requirement for network
- GB 50174Code for design of data centers
- DL/T 634.5101Telecontrol equipment and systems - Part 5-101: Supporting standards for transmission protocol basic telecontrol tasks
- DL/T 634.5104Telecontrol equipment and systems. part 5-104: Transmission protocols-Network access for IEC 60870-5-101 using standard transport profiles
DL/T 860 · DL/T 5136
Cited by
- GB/T 33589-2026Technical requirements for connecting microgrids to the power system
- GB/Z 120.305-2026Microgrids - Part 3-5: Testing for microgrid monitoring, control, and energy management systems
- GB/T 44637-2024Energy interconnection system - Interaction between smart grid and heat, gas, water and transportation systems
- GB/T 42731-2023Technical requirements for the microgrid
- GB/T 43333-2023Specification for commissioning and acceptance of stand-alone microgrid
- GB/T 43334-2023Technical requirements for energy management system of isolated microgrids
Similar standards
How to Download GB/T 36274-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 634.5101-2022 — Telecontrol equipment and systems - Part 5-101: Supporting standards for transmission protocol basic telecontrol tasks
DL/T 634.5104-2009 — Telecontrol equipment and systems. part 5-104: Transmission protocols-Network access for IEC 60870-5-101 using standard transport profiles
DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing
Secure payment via Stripe
Payments accepted
GB/T 36274-2018
$125.00