GB/T 47032-2026Code for the operational evaluation of combined wind, photovoltaic and energy storage power stations (English PDF)
风光储联合发电站运行评价规程
This is a limited preview
Buy now to download the full PDF (26 pages)
Need quotation for your management?
Get a formal quotation for GB/T 47032-2026 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
January 28, 2026
Implementation date
May 1, 2026
Scope
GB/T 47032-2026 is the English-translated version of 风光储联合发电站运行评价规程.
GB/T 47032-2026 is the Chinese national standard covering judging a hybrid wind-solar-storage plant as one station - the output it actually delivers against forecast, the curtailment avoided by the storage, the round-trip losses, the availability of each part and the indicators that make two such plants comparable.
First edition, in force since 1 May 2026. It was issued on 28 January 2026 and has been in force since 1 May 2026, as a first edition.
This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
Found what you need?
Document preview — GB/T 47032-2026
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1.Scope1
- 2 Normative References1
- 3.Terms and Definitions1
- 4 Symbols1
- 5.General Requirements3
- 6.Evaluation Procedure3
- 7.Evaluation Data4
- 7.1 Basic Information4
- 7.2 Operational Data4
- 7.3 Data Processing4
- 8.Evaluation Indicators and Calculation Methods4
- 8.1 Evaluation Indicators4
- 8.2 Calculation Method5
- 10.1 Marking Method10
- 12 Appendix B (Normative) Calculation Methods for Evaluation Indicators of Wind Power, Photovoltaic and Energy Storage Subsystems 19 B.1 Photovoltaic subsystem energy utilization rate 19 B.2 Equivalent utilization hours 19 B.3 Reliability Index 20 B.4 Operation and Maintenance Indicators22
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents. This document was proposed and is under the jurisdiction of the China Electricity Council. This document was drafted by: China Electric Power Research Institute Co., Ltd., State Grid Corporation of China, and State Grid Anhui Electric Power Co., Ltd. Electric Power Research Institute, State Grid Shandong Electric Power Company Electric Power Research Institute, State Grid Hebei Electric Power Company Electric Power Research Institute, State Grid Fujian Electric Power Company Limited, China Huadian Electric Power Research Institute Co., Ltd., State Grid Qinghai Electric Power Company Limited, State Grid Hunan Electric Power Company Limited Economic and Technological Research Institute, State Grid Xinjiang Electric Power Co., Ltd., State Grid Hebei Zhangjiakou Wind-Solar-Storage New Energy Co., Ltd., State Power Investment Corporation Xinjiang Energy and Chemical Industry Co., Ltd., Energy Engineering Times (Shanghai) New Energy Storage Technology Research Institute Co., Ltd., and State Power Investment Corporation Yellow River Upstream Hydropower Development Co., Ltd., and China Energy Investment Corporation Science and Technology Research Institute Co., Ltd. The main drafters of this document are. Qin Shiyao, Li Kecheng, Tao Yibin, Sang Bingyu, Zhou Caiqi, Sun Wenwen, Chen Zhilei, Wang Yiting, Tian Yunfeng, and Sun Xuejun. Xu Bin, Li Guoqing, Yang Zhihao, Li Ze, Cheng Yan, Zhu Shaojie, Li Zhicheng, Wang Yu, Liu Yanzhang, Yu Haifeng, Yuan Lixiang, Zhao Zhou, Xie Yurong, Fan Bingjian, Wang Jun, Ma Wei, Yang Di, You Long, Sun Bo, Li Guanjun, Zhang Lei, He Jing, Wang Shibai, Jiang Hua, Huang Mou, Wang Yifei, Chen Yuge, Zhu Fahua. Operation Evaluation Procedures for Combined Wind, Solar and Energy Storage Power Stations
1 Scope
GB/T 47032-2026 is the Chinese national standard covering judging a hybrid wind-solar-storage plant as one station - the output it actually delivers against forecast, the curtailment avoided by the storage, the round-trip losses, the availability of each part and the indicators that make two such plants comparable. First edition, in force since 1 May 2026. It was issued on 28 January 2026 and has been in force since 1 May 2026, as a first edition. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
This document specifies the overall requirements, evaluation procedures, evaluation data, evaluation indicators and calculation methods for the operation evaluation of combined wind, solar and energy storage power stations. Analysis, evaluation, and traceability methods. This document applies to the operational evaluation of wind-storage, solar-storage, and combined wind-solar-storage power plants.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document.
GB/T 36549 Operational Indicators and Evaluation of Electrochemical Energy Storage Power Stations
GB/T 51311 Standard for Commissioning and Acceptance of Combined Wind-Solar-Storage Power Stations
GB/T 51437 Design Standard for Combined Wind, Solar and Storage Power Stations DL/T 793.6 Reliability Evaluation Code for Power Generation Equipment - Part
6.Wind Turbine Generator Sets DL/T 793.7 Reliability Evaluation Procedure for Power Generation Equipment - Part
7.Photovoltaic Power Generation Equipment DL/T 1815 Reliability Evaluation Procedure for Electrochemical Energy Storage Power Station Equipment DL/T 2528 Basic Terminology for Electric Energy Storage NB/T 10586 Standard Energy Utilization Rate Evaluation Procedure for Wind Power Plants NB/T 31045 Wind Farm Operation Indicators and Evaluation Guidelines
3 Terms and Definitions
GB/T 36549, GB/T 51311, GB/T 51437, DL/T 793.6, DL/T 793.7, DL/T 1815, DL/T 2528, The terms and definitions defined in NB/T 10586 and NB/T 31045, as well as the following terms and definitions, apply to this document.
3.1 jointtoperation hours The wind-solar-storage combined power station operates in four modes. wind-solar-storage combined operation, wind-solar combined operation, wind-storage combined operation, and solar-storage combined operation. The sum of the number of hours in the flight mode.
3.2 jointtoperation factor The percentage of hours in which wind, solar and energy storage combined power plants operate together (3.1) during the statistical period.
4 Symbols
The following symbols apply to this document. Electricity (kWh) of combined wind, solar, and energy storage power plants settled in the market during the EMar statistical period Eon's on-grid electricity generation from combined wind, solar, and energy storage power plants during the statistical period (kWh)
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.
Referenced standards
Normative references
How to Download GB/T 47032-2026
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 36549-2018 — Operation performance index and evaluation of electrochemical energy storage station
GB/T 51311-2018 — Standard for debugging and acceptance of wind/PV/storage power plant
GB/T 51437-2021 — Design standards for wind-solar-storage combined power station
Secure payment via Stripe
Payments accepted
GB/T 47032-2026
$480.00