GB/T 41369-2022Quality evaluation of comprehensive performance of units operation of small hydropower stations (English PDF)
小型水电站机组运行综合性能质量评定
This is a limited preview
Buy now to download the full PDF (20 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41369-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 9, 2022
Implementation date
October 1, 2022
Scope
GB/T 41369-2022 is the English-translated version of 小型水电站机组运行综合性能质量评定.
GB/T 41369-2022 sets how the overall operating performance of the units of a small hydropower station is assessed.
It fixes what the assessment covers, the requirements the unit has to meet and the methods by which each of them is judged - the output and efficiency, the vibration and the behaviour of the bearings, the governing and the electrical equipment.
It applies to hydro generating units from 0.5 MW to 25 MW with a runner diameter not greater than 3.3 m, and units from 0.1 MW to 0.5 MW may follow it for reference.
Plant owners, turbine makers and the engineers who overhaul a unit use it. Issued on 9 March 2022, it has applied since 1 October 2022.
Found what you need?
Document preview — GB/T 41369-2022
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- P 59
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Assessment content and requirements
- 4.1 Basic requirements
- 4.2 Turbine Operational Performance Quality
- 4.3 Operational performance quality of hydro-generator
- 4.4 Operating performance quality of excitation system
- 4.5 Operational performance quality of speed control system
- 4.6 Operational performance quality of turbine inlet valve
- 4.7 Operational performance quality of other equipment
- 5 Comprehensive assessment
- 5.1 Basic conditions for assessment
- 5.2 Scoring principles and scoring methods
- 5.3 Assessment Conclusions
- Appendix A (normative) Evaluation Item Scoring Method
- Appendix B (Informative) Comprehensive Performance Quality Score Sheet
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.
1 Scope
This document specifies the content, requirements and methods for the comprehensive performance quality assessment of the units used in small hydropower stations.
This document is applicable to hydro-generators whose unit power is between 0.5MW and 25MW and the diameter of the turbine runner is not greater than 3.3m.
Evaluation of the overall performance quality of the group operation. For units with a power between 0.1MW and 0.5MW, you can refer to the implementation.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 7894 Basic technical conditions of hydro-generators
GB/T 8564 Technical Specification for Installation of Hydrogenerator Sets
GB/T 9652.1 Technical conditions of turbine speed control system
GB/T 9652.2 Turbine Speed Governing System Test
GB/T 10585-1989 Basic technical requirements for the excitation system of small and medium-sized synchronous motors
GB/T 14478 Basic technical conditions for inlet valves of large and medium turbines
GB/T 15469.1 Cavitation Erosion Assessment of Turbines, Accumulator Pumps and Water Pumps - Part 1: Cavitation Erosion Assessment of Impact Turbines
GB/T 17189 Hydraulic machinery (turbine, accumulator pump and water pump turbine) vibration and pulsation field test procedures
GB/T 19184 Cavitation Erosion Assessment of Water Bucket Turbine
GB/T 20043 Field Acceptance Test Procedures for Hydraulic Performance of Turbine, Storage Pump and Pump Turbine
GB/T 21717 Specifications for Type Parameters and Performance of Small Hydro Turbines
GB/T 21718 Basic technical conditions for small turbines
GB/T 22140 Field Acceptance Test Procedures for Small Hydro Turbines
GB/T 27989 Basic technical conditions for small hydro-generators
GB/T 29403 Technical Guidelines for Sediment Wear of Impact Turbine
GB/T 50964 Technical Specifications for Operation and Maintenance of Small Hydropower Stations
JB/T 7072 Series Spectrum of Turbine Governor and Hydraulic Device SL229 Code for Automation Design of Small Hydroelectric Power Stations SL555 Field Efficiency Test Procedure for Small Hydropower Stations SL696 Basic technical conditions of water inlet valve for small turbines
3 Terms and Definitions
There are no terms and definitions that need to be defined in this document.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 7894Fundamental technical requirements for hydro-generators
- GB/T 8564Technical specification for installation of hydraulic turbine-generator unit
- GB/T 9652.1Specification of hydraulic turbine governing systems
- GB/T 9652.2Testing specification of hydraulic turbine governing systems
- GB/T 14478Basic technical specification of inlet valves for large and medium-sized hydraulic turbines
- GB/T 15469.1Hydraulic turbines, storage pumps and pump-turbines cavitation pitting evaluation -- Part 1: cavitation pitting evaluation in reaction turbines
GB/T 10585-1989 · GB/T 21717
Similar standards
How to Download GB/T 41369-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 14478-2025 — Basic technical specification of inlet valves for large and medium-sized hydraulic turbines
GB/T 15469.1-2008 — Hydraulic turbines, storage pumps and pump-turbines cavitation pitting evaluation -- Part 1: cavitation pitting evaluation in reaction turbines
GB/T 17189-2017 — Code for field measurement of vibrations and pulsations in hydraulic machines (turbines, storage pumps and pump-turbines)
Secure payment via Stripe
Payments accepted
GB/T 41369-2022