Valid

GB/T 19184-2003Cavitation pitting evaluation in Pelton turbines (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (7 pages)

Need quotation for your management?

Get a formal quotation for GB/T 19184-2003 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People Republic of China

Level / Type

National · Recommended

Issue date

June 5, 2003

Implementation date

January 1, 2004

Scope

GB/T 19184-2003 (Cavitation pitting evaluation in Pelton turbines) is available as an English-translated PDF.

GB/T 19184-2003 — This standard specifies the Pelton turbines turn bye eclipse guaranteed specifications and as Pelton turn bye eclipse measurements assessed on the basis of the power of Pelton turbines, hydro specific energy (head), speed, materials and operating conditions should be stipulated in the contract.

This standard hollow erosion measurement and assessment provisions are based on a given time and under specified operating conditions, based on material loss to carry.

When Pelton turbines run at all or some of the range of cavitation may occur when there is a need in the contract at the end of the run to ensure that the degree of cavitation in the form of restrictions.

Found what you need?

Document preview — GB/T 19184-2003

National Standard of the People's Republic of China

ICS
27.140
Classification
K 55

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People Republic of China

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard specifies the Pelton turbines turn bye eclipse guaranteed specifications and as Pelton turn bye eclipse measurements assessed on the basis of the power of Pelton turbines, hydro specific energy (head), speed, materials and operating conditions should be stipulated in the contract. This standard hollow erosion measurement and assessment provisions are based on a given time and under specified operating conditions, based on material loss to carry. When Pelton turbines run at all or some of the range of cavitation may occur when there is a need in the contract at the end of the run to ensure that the degree of cavitation in the form of restrictions. This guarantee should include the operating range constraints, the operating range of operating conditions consistent with the requirements.

Document data

International classification (ICS): 27.140.

Chinese classification (CCS): K55.

Estimated length of the Chinese original: 9,910 words.

Adopted international standard: IEC 60609-2-1997, MOD.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 19184-2003

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
7 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 19184-2003

$135.00