Valid

GB/T 9652.2-2019Testing specification of hydraulic turbine governing systems (English PDF)

Also coversGBT9652.2-2019

Open the GB/T 9652.2-2019 preview as PDF

Preview — first pages of GB/T 9652.2-2019

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

June 4, 2019

Implementation date

January 1, 2020

Scope

GB/T 9652.2-2019 (Testing specification of hydraulic turbine governing systems) is available as an English-translated PDF.

GB/T 9652.2-2019 — This part of GB/T 9652 specifies the test classification, test items, test conditions and methods, and test reports of the turbine governing system. Write requirements. This part is applicable to the type test, factory test, power station test and acceptance of the turbine governing system (including the pump turbine governing system). Test after test and overhaul.

Document preview — GB/T 9652.2-2019

National Standard of the People's Republic of China

ICS
27.140
Classification
K 55

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 test conditions
  • 3.1 Test preparation work
  • 3.2 Test instruments, instruments

Foreword

GB/T 9652 is divided into the following two parts.

---GB/T 9652.1 Technical requirements for turbine governing system;

---GB/T 9652.2 Hydraulic turbine governing system test.

This part is the second part of GB/T 9652.

This part is drafted in accordance with the rules given in GB/T 1.1-2009.

This part replaces GB/T 9652.2-2007 "Engine Control System Test", compared with GB/T 9652.2-2007 main technical changes

The following is as follows.

--- The scope of application has been modified and supplemented (see Chapter 1, Chapter 1 of the.2007 edition);

--- The test conditions have been modified and supplemented (see 3.2, 3.4.1,.2007 edition 3.3.1, 3.3.4);

--- Added or modified the hydraulic pressure device adjustment test content (see 6.1.2, 6.2.1, 6.2.2, 6.3.1, 6.3.2, 6.3.3,.2007)

Versions 6.27.1, 6.27.2, 6.28.2, 6.28.3);

--- Considering that the mechanical hydraulic governor and analog circuit governor have been discontinued in China for more than ten years, the current turbine governor products are

It is a microcomputer type governor, so the relevant provisions of the mechanical hydraulic governor and the analog circuit electro-hydraulic governor have been deleted (see the.2007 edition).

6.1.4, 6.3, 6.10.1, 6.10.2, 6.10.3);

--- Supplemented the test content of the frequency measurement link (see 6.10.2);

--- Supplemented the test content of the electrical-mechanical/hydraulic conversion components (see 6.11.3, 6.11.5);

--- Supplementary method for determining the reaction time of the relay (see 6.14, 6.19 of the.2007 edition);

--- Supplement and adjust the adjustment parameter calibration method of the microcomputer regulator (see 6.16, 6.11 of the.2007 edition);

--- Added the test content of the pump turbine governing system (see 6.20, 6.33, 6.34, 6.35, 6.36, 6.38);

--- Added the hydraulic drift test content (see 6.24);

--- Supplementary to the no-load disturbance test method (see 6.26.2, 6.21 of the.2007 edition);

--- Increased load adjustment test content (see 6.27);

--- Removed the oil pump shaft power test, efficiency test, vibration test, etc. (see the.2007 edition of 6.27.2.2, 6.27.2.3,

6.27.2.4, 6.27.2.5, 6.27.2.6, 6.27.2.7, 6.27.3, 6.27.4, 6.27.5);

--- Added a frequency modulation test, modeling test content (see 6.28, 6.29);

---Adjust and supplement the experimental content of the isolated network adjustment (see 6.30, 6.22 of the.2007 edition);

--- Adjusted and improved Appendix A (see Appendix A, Appendix A of the.2007 edition).

This part uses the redrafting method to refer to IEC 60308.2005 "Engine Control System Test", and IEC 60308.2005

The degree of consistency is non-equivalent.

This part was proposed by China Electrical Equipment Industry Association.

This part is under the jurisdiction of the National Turbine Standardization Technical Committee (SAC/TC175).

This section is mainly drafted by. Tianjin Electric Science Research Institute Co., Ltd., China Institute of Water Resources and Hydropower Research Institute of Automation, Kazakhstan

Erbinda Electric Machinery Research Institute, Dongfang Motor Control Equipment Co., Ltd., Three Gorges Hydropower Plant, Wuhan Yangtze River Control Equipment Research Institute Co., Ltd.

Shangrao Kaiyuan Power Station Control Equipment Manufacturing Co., Ltd., China Datang Group Science and Technology Research Institute Hydropower Research Institute, Yalong River

Watershed Hydropower Development Co., Ltd. Jinping Hydropower Plant, Xi'an University of Technology.

1 Scope

This part of GB/T 9652 specifies the test classification, test items, test conditions and methods, and test reports of the turbine governing system.

Write requirements.

This part is applicable to the type test, factory test, power station test and acceptance of the turbine governing system (including the pump turbine governing system).

Test after test and overhaul.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 150.4 Pressure vessels - Part 4. Manufacture, inspection and acceptance

GB/T 3797 electrical control equipment

GB/T 9652.1 Technical requirements for turbine governing system

GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test

GB/T 31066 Electrotechnical terminology turbine control system

Technical specification for DL/T 1120 turbine adjustment system test and real-time simulation device

DL/T 1235 Synchronous generator prime mover and its regulation system parameters measurement and modeling guidelines

Technical Guidelines for Grid Operation of DL/T 1245 Turbine Regulating System

DL/T 1800 Turbine Regulating System Modeling and Parameter Measurement Technical Guidelines

JB/T 7036 hydraulic isolation accumulator technical conditions

JB/T 7037 Hydraulic Isolated Accumulator Test Method

JB/T 7038 Hydraulically Isolated Accumulator Housing Specifications

3 test conditions

3.1 Test preparation work

3.1.1 Determine the type and project of the test and prepare a test plan.

3.1.2 Develop safety precautions, pay attention to prevent accidental pressure valve failure, inlet valve or fast door failure, unit overspeed protection system and

Abnormal water system, electric shock and other equipment and personal accidents.

3.1.3 Prepare the drawings and materials related to this test.

3.1.4 Equipped with the required tools, equipment, test power, instruments/instruments and sensors.

3.1.5 The test site should have good lighting conditions and communication equipment.

3.2 Test instruments, instruments

3.2.1 Measuring instruments and meters shall be within the validity period of inspection or verification.

3.2.2 Before the test, the conversion coefficient of each physical quantity to be collected should be determined.

3.2.3 Test system error and resolution shall comply with the provisions of Appendix A.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 9652.2-2019

  1. 1Add to cart. Click the "Buy GB/T 9652.2-2019" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 9652.2-2019

$305.00

$260.00for partners