GB/T 15469.1-2008Hydraulic turbines, storage pumps and pump-turbines cavitation pitting evaluation -- Part 1: cavitation pitting evaluation in reaction turbines (English PDF)
水轮机、蓄能泵和水泵水轮机空蚀评定 第1部分:反击式水轮机的空蚀评定
This is a limited preview
Buy now to download the full PDF (12 pages)
Need quotation for your management?
Get a formal quotation for GB/T 15469.1-2008 in 30 minutes.
Issued by
Standardization Administration of China
Level / Type
National · Recommended
Issue date
June 30, 2008
Implementation date
April 1, 2009
Scope
GB/T 15469.1-2008 is the English-translated version of 水轮机、蓄能泵和水泵水轮机空蚀评定 第1部分:反击式水轮机的空蚀评定.
GB/T 15469.1-2008 — This standard specifies the reaction turbine at a given condition (as stipulated in the contract power, hydro specific energy (head), speed, materials, operating conditions and operating time, etc.) of certain provisions of the flow components caused due to cavitation material loss measurement and evaluation methods.
Shall specify in the contract in reaction turbine operating range of all or part of the existence of cavitation. Cavitation should be clearly defined and guaranteed value.
This section does not include the turbine cavitation may impact other properties, such as: power, efficiency, vibration, mechanical and machine noise, exposed in the operation of material defects.
Found what you need?
Document preview — GB/T 15469.1-2008
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
- Replacing
- GB/T 15469-1995
Issued by: Standardization Administration of China
Contents
- Preface
- Introduction
- 1 Scope
- 1.1 Overview
- 1.2 Does not contain the contents of
- 1.3 Effect of water containing chemicals
- 1.4 Effect of water containing solid particles of a
- 2 Normative references
- 3 Terms, definitions, symbols and units
- 3.1 Terms, definitions and symbols
- 3.2 Unit
- 4 Cavitation Guarantee
- 4.1 The warranty period
- 4.2 Cavitation defined amount of
- 4.3 Operating range and running time
- 5. Program
Foreword
GB/T 15469 "turbines, storage pumps and pump - turbines cavitation assessment" is divided into the following three parts.
--- Part 1. reaction turbines cavitation assessment;
--- Part 2. storage pumps and pump - turbines cavitation assessment;
--- Part 3. Pelton turbine cavitation assessment.
This section GB/T 15469 Part 1.
The partial modification of the International Electrotechnical Commission IEC 60609-1:2004 "turbines, storage pumps and pump - turbines cavitation pitting evaluation 1 Part reaction turbines assessment ", while the text, and graphics units were normalized.
The main difference between this part of IEC 60609-1 is described in Appendix B, respectively.
This Part replaces GB/T 15469-1995 "reaction turbine cavitation assessment." Some of the major differences compared with the GB/T 15469-1995 This is.
--- Original reference standard running time of 8000h, modify this section for more run time per day plant operation 8000h or less time for the daily operation of the unit running 3000h;
--- Original standard on cavitation guaranteed value is calculated using the formula applied form part of the body in a way to modify this section by example Consider, as an appendix A, which cavitation guaranteed value calculation formula applied by way of the curve.
Appendix A of this section is normative appendix, Appendix B is an informative annex.
This part is proposed by the China Electrical Equipment Industrial Association.
This part of the National Standardization Technical Committee turbine (SAC/TC175) centralized.
This part mainly drafted by. Dongfang Electrical Machinery Co., Ltd, China Institute of Water Resources and Hydropower, Harbin Electric Machinery Co., Ltd.
Introduction
This section provides cavitation evaluation in reaction turbines.
The degree of reaction turbines cavitation depends on the following five main factors.
a) the type and design of the turbine;
b) material and surface state of the site of action of cavitation;
c) turbine installation elevation, or station cavitation coefficient (sigmaP);
d) duration of operation and operating conditions;
e) water quality.
a), b) depending on the characteristics of the turbine itself. And c), d), e) depending on the operating conditions of the power plant. Thus, cavitation should be guaranteed for the two sides need to agree in power plant planning and design stage or contract. When the requirements for renewal or wheel has a wider operating range, the supplier in a bid to make recommendations to ensure that the amount of cavitation.
Cavitation can use the following two methods to ensure the consultation.
First, according to the contract in a given turbine installation height (corresponding to the power plant cavitation coefficient sigmaP), and turbine size, speed, overcurrent Component material, surface condition and operating conditions and other consultations cavitation guaranteed value (see Figure 1a);
Second, under certain conditions cavitation permitted value, consult turbine installation elevation (see Figure 1b).
In most cases, the unit normal operation without cavitation conditions, or be required to operate without cavitation conditions, sometimes for economic Reasons, but also it allows a slight cavitation, namely turbine installation elevation above the elevation can run without cavitation.
Each station a) ~ e) items are different, the development of common acceptable cavitation allowable value is not appropriate. Therefore, it is recommended according to each Economic assessment of plant conditions. Installation is usually lower elevation (greater station cavitation coefficient sigmaP values \u200b\u200brequire higher costs of civil engineering) and /or more expensive wheel (shape and/or materials) reduces the amount of cavitation. Higher cost benefits is to reduce operating costs and reduce maintenance frequency Rate, and can reduce downtime because of power loss.
Cavitation depth, size and function of the quality and the runner diameter, see Appendix A.
1 turbine as a function of flow rate in a certain amount of time and space station cavitation erosion coefficient
Figure 1 (cont.)
Turbines, storage pumps and pump - turbines cavitation pitting evaluation Part 1. reaction turbines cavitation assessment
2 Normative references
The following documents contain provisions which, through GB/T 15469 references become part of the present provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to the research protocol to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 12 pages — is available in the English PDF.
Referenced standards
Normative references
Cited by
- GB/T 46341-2025Fundamental technical requirements for flexible operating hydropower turbines under ultra-wide load
- GB/T 41369-2022Quality evaluation of comprehensive performance of units operation of small hydropower stations
- GB/T 21718-2021Fundamental technical requirements for small hydraulic turbines
- NB/T 10135-2019Basic technical specifications for large and medium hydraulic turbines
- GB/T 29403-2012Technical guide for dealing with sand abrasive erosion in reaction hydraulic turbines
How to Download GB/T 15469.1-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 15469-1995 — Hydraulic turbines, storage pumps and pump-turbines cavitation pitting evaluation -- Part 1: cavitation pitting evaluation in reaction turbines
GB/T 24293-2026 — Thermostatic faucet
GB/T 48132.9-2026 — Green mine construction specifications - Part 9: Cement limestone mine
Secure payment via Stripe
Payments accepted
GB/T 15469.1-2008
$95.00