GB/T 11805-2019General specifications for the automatic control components and devices and their systems for hydro-turbine generating sets (English PDF)
水轮发电机组自动化元件(装置)及其系统基本技术条件
This is a limited preview
Buy now to download the full PDF (25 pages)
Need quotation for your management?
Get a formal quotation for GB/T 11805-2019 in 30 minutes.
Issued by
State Administration for Market Regulation; Standardization Administration of China
Level / Type
National · Recommended
Issue date
June 4, 2019
Implementation date
January 1, 2020
Scope
GB/T 11805-2019 is the English-translated version of 水轮发电机组自动化元件(装置)及其系统基本技术条件.
China's national general specification for the automation components, devices and systems of hydro-turbine generating sets - the sensors, transmitters, relays, switches, valves and controllers through which a hydroelectric unit is started, synchronised, loaded, protected and shut down.
A hydro station is the most highly automated form of generation there is: units are started and stopped many times a day to follow load, they are routinely run unattended or from a remote control centre, and the machine has to be able to stop itself safely from full load without anybody present.
All of that rests on the components this standard covers. It specifies the general technical conditions for the automatic control components and devices of hydro-turbine generating sets and for the systems built from them.
The requirements are those of components whose failure mode matters more than their performance. Accuracy and repeatability are specified, but so is the behaviour on failure: what a transmitter does when it loses its signal, what a relay does when it loses its supply, and whether the failure is one the control system can detect.
To those are added the environmental requirements of a machine hall - the humidity and the condensation, the flooding risk at the pit level, the vibration of a large rotating machine, the temperature range, and the electromagnetic environment beside a generator and its excitation.
The system clauses cover how the components are combined: the signal interfaces and levels, the redundancy where a function is critical, the independence of the protection paths from the control paths, and the testing and commissioning of the assembled system.
The provisions on the emergency shutdown and on the mechanical overspeed protection are the ones the whole station depends on, because a hydro unit that loses load and does not close its gates runs away.
Issued on 4 June 2019 and in force since 1 January 2020, it replaces GB/T 11805-2008.
Found what you need?
Document preview — GB/T 11805-2019
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- K 55
- Replacing
- GB/T 11805-2008
Issued by: State Administration for Market Regulation; Standardization Administration of China
Contents
- ForewordI
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions2
- 4 Applicable conditions3
- 5 Requirements4
- 6 Sampling10
- 7 Test method11
- 8 Inspection and acceptance rules19
- 9 Marking, packaging, transportation and storage20
- Appendix A (Normative Appendix) Approximate conversion of internal oil leakage of different oil temperature and oil quality slide valves22
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T 11805-2008 "Hydraulic generating units automation components (devices) and their systems basic technical conditions", and
Compared with GB/T 11805-2008, the main technical changes are as follows.
--- Added "terms and definitions" (see 3.2, 3.3, 3.11);
--- Increased the principle of speed setting for pumped storage reversible units or special cases, and modified the electrical of "secondary overspeed contacts"
Fixed value (see 3.6, 3.4 of the.2008 edition);
---Modified the electrical output requirements of components (see 5.1.1.12, 5.1.1.12 of the.2008 edition);
--- Increased the frequency measurement resolution requirements of the residual voltage measurement method of the electrical speed signal device (see 5.1.2.7,.2008 edition) 5.1.2.7);
--- Increased the level requirements for different measurement positions of temperature measuring resistors (RTD) (see 5.1.2.14, 5.1.2.14 of.2008 edition);
--- Revised the relevant requirements for electric valves (see 5.1.2.23, 5.1.2.23 of the.2008 version);
--- Revised the relevant requirements of the vibration (swing) monitoring device (see 5.1.2.25, 5.1.2.25 of the.2008 edition);
--- Revised the relevant requirements of the generator air gap monitoring device (see 5.1.2.26, 5.1.2.26 of the.2008 edition);
--- Revised the relevant requirements of the generator partial discharge monitoring device (see 5.1.2.27, 5.1.2.27 of the.2008 edition);
--- Revised the relevant requirements for the large axis axial displacement monitoring device (see 5.1.2.28, 5.1.2.28 of the.2008 edition);
--- Increased requirements for early smoke detection systems for air sampling (see 5.1.2.37, 5.1.2.37 of the.2008 edition);
---Modified the output accuracy level of the transmitter (see 5.1.2.41, 5.1.2.41 of the.2008 version);
--- Increased the relevant requirements for the unit's bearing external circulation cooling device (see 5.2.2,.2008 version 5.2.2);
--- Removed the relevant requirements for phase-modulation operation in the accident shutdown condition (see 5.2.7, 5.2.7 of the.2008 edition);
1 Scope
This standard specifies the basic technical requirements for the automation components (devices) used in hydroelectric generating units, water inlet valves and speed control systems.
Seek and system configuration requirements, and specify the corresponding test methods and acceptance rules, signs, packaging and other content.
This standard applies to the manufacture of products for hydropower station automation components (devices) and the automation of hydroelectric generating units that meet one of the following conditions.
System configuration and handover acceptance of components (devices).
a) single unit capacity is 10MW and above;
b) Impact type units with a nominal diameter of 1.5 m and above;
c) Francis turbines with a nominal diameter of 2.5 m and above;
d) Axial flow, diagonal flow, tubular flow units with a nominal diameter of 3.3 m and above.
System configuration of automation components (devices) of hydroelectric generating units, pumped-storage reversible units, and tidal generating units of less than the above range
Placement and handover acceptance can be referred to.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.
Definition and selection of GB/T 1048 pipe component PN (nominal pressure)
GB/T 2423.4 Environmental testing of electric and electronic products - Part 2. Test method test Db alternating heat (12h 12h cycle)
GB/T 3452.1 O-ring rubber seals for hydraulics - Part 1 . Dimension series and tolerances
GB/T 3452.2 O-ring rubber seals for hydraulics - Part 2. Appearance quality inspection standard
GB/T 8564 Hydrogenerator Set Installation Technical Specifications GB 11120 turbine oil
GB/T 12244 pressure reducing valve general requirements General technical conditions for GB/T 13384 mechanical and electrical product packaging
GB/T 14048.1-2012 Low-voltage switchgear and control equipment - Part 1. General
GB/T 14048.16 Low-voltage switchgear and controlgear - Part 8. Loaded thermal protection (PTC) control for rotating electrical machines unit
GB 16280 linear heat detector
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test Technical guide for GB/T 28570 hydroelectric generating set status online monitoring system
HG/T 2579 O-ring rubber ring material - Part 1. For general hydraulic systems
JB/T 834 Tropical Low Voltage Electrical Specifications
JB/T 4159-2013 General technical requirements for tropical electrical products
JB/T 8528 ordinary valve electric device technical conditions
Remaining clauses in the full document
- 3 Terms and Definitions
- 4 Applicable conditions
- 5 Requirements
- 6 Sampling
- 7 Test method
- 8 Inspection and acceptance rules
- 9 Marking, packaging, transportation and storage
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1048Pipework components - Definition and selection of nominal pressure
- GB/T 2423.4Environmental testing for electric and electronic products - Part 2: Test method - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
- GB/T 3452.2Fluid power systems -- O-rings -- Part 2: Quality acceptance criteria
- GB/T 8564Technical specification for installation of hydraulic turbine-generator unit
- GB 11120Lubricating oils for turbines
- GB/T 12244Pressure reducing valves - General requirements
GB/T 3452.1 · GB/T 14048.1-2012 · GB/T 14048.16
Cited by
- GB/T 46341-2025Fundamental technical requirements for flexible operating hydropower turbines under ultra-wide load
- GB/T 22581-2024Fundamental technical requirements for Francis pump-turbines
- GB/T 8564-2023Technical specification for installation of hydraulic turbine-generator unit
- GB/T 9652.1-2019Specification of hydraulic turbine governing systems
- NB/T 10135-2019Basic technical specifications for large and medium hydraulic turbines
- NB/T 10078-2018Specification for selection, testing and acceptance of spherical inlet valves for hydraulic turbine
Similar standards
GB/T 9652.1|GB/T 7894|GB/T 30370|GB 5226.1|GB 26861-2011|GB/T 17626.2
Editions of GB/T 11805
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 11805-2019 | General specifications of automatic control components and devices and their systems for hydro-turbine generating sets | third revision | Current |
| GB/T 11805-2008 | General specifications of automatic control components and devices for hydro-turbine generating sets | second revision | Superseded |
| GB/T 11805-1999 | General specifications of automatic control components for hydro-turbine generating sets | first revision | Superseded |
This page sells the current edition, GB/T 11805-2019. Earlier editions are listed for reference only.
How to Download GB/T 11805-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 11120-2011 — Lubricating oils for turbines
GB 16280-2014 — Line type heat fire detectors
GB/T 1048-2019 — Pipework components - Definition and selection of nominal pressure
Secure payment via Stripe
Payments accepted
GB/T 11805-2019
$350.00