GB/T 30370-2022Guide of primary frequency control test and performance acceptance for thermal power generating units (English PDF)
火力发电机组一次调频试验及性能验收导则
This is a limited preview
Buy now to download the full PDF (24 pages)
Need quotation for your management?
Get a formal quotation for GB/T 30370-2022 in 30 minutes.
Issued by
State Administration for Market Regulation; Standardization Administration of the PRC
Level / Type
National · Recommended
Issue date
October 12, 2022
Implementation date
May 1, 2023
Scope
GB/T 30370-2022 is the English-translated version of 火力发电机组一次调频试验及性能验收导则.
GB/T 30370-2022 is the Chinese standard "Guide of primary frequency control test and performance acceptance for thermal power generating units". Its scope clause reads: This document specifies the main technical requirements and methods for the primary frequency modulation test and performance acceptance of thermal power generating units.
This document is applicable to thermal power generating units with a single unit capacity of 100MW and above, and thermal power generating units of other capacity levels. Carry out. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 30370-2022
National Standard of the People's Republic of China
- ICS
- 29.160.40
- Classification
- K 52
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Test purpose
- 5 Main technical indicators
- 6 Test conditions
- 7 Test requirements and methods
- 8 Test Step
- 9 Performance Acceptance
- Appendix A (Informative) Primary Frequency Modulation Characteristics of Thermal Power Generating Sets Figure
- Appendix B (informative) Typical schematic diagram of primary frequency modulation function
- Appendix C (Informative) Table 8 of Load Condition and Disturbance Configuration for a Frequency Modulation Test
- Appendix D (Informative) One Frequency Modulation Performance Test and Acceptance Form
1 Scope
This document specifies the main technical requirements and methods for the primary frequency modulation test and performance acceptance of thermal power generating units.
This document is applicable to thermal power generating units with a single unit capacity of 100MW and above, and thermal power generating units of other capacity levels.
Carry out.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 26863 Terminology of monitoring system for thermal power station
DL/T 657 Acceptance test procedure for analog quantity control system of thermal power plant
3 Terms and Definitions
The terms and definitions defined in GB/T 26863 and the following apply to this document.
3.1
The speed of each generator set is adjusted by the speed governor of each prime mover, so that the driving torque varies with the system frequency.
[Source. GB/T 26863-2011, 6.29.1.5]
3.2
The primary frequency modulation regulation system is insensitive to the speed difference or frequency difference near the rated speed.
3.3
From the last time the speed difference or frequency difference exceeds the frequency modulation dead zone to the time when the unit load starts to change in the correct frequency modulation direction time.
3.4
The allowable range from the last time the speed difference or frequency difference exceeds the frequency modulation dead zone to the last time when the unit load reaches the target value within the time required.
3.5 Speed droop droop
The slope of the static characteristic curve of the steam turbine control system. Usually, the ratio of the speed difference corresponding to the empty load and full load to the rated speed expressed as a percentage.
[Source. GB/T 26863-2011, 6.29.4.15] […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.
Referenced standards
Normative references
Cited by
- DL/T 711-2019Turbine regulation security system test guidelines
- DL/T 996-2019Specification of steam turbine control system for thermal power plant
- GB/T 36045-2018Supervision specification of unit capacity expansion retrofit for coal-fired power plants
- GB/T 37134-2018Guide for ancillary service of grid connected power plants
Similar standards
Editions of GB/T 30370
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 30370-2013 | Guide of primary frequency control test and performance acceptance for thermal power generating units | first issue | Superseded |
| GB/T 30370-2022 | Guide of primary frequency control test and performance acceptance for thermal power generating units | first revision | Current |
This page sells the current edition, GB/T 30370-2022. Earlier editions are listed for reference only.
How to Download GB/T 30370-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 26863-2022 — Terminology of monitoring and control system of thermal power station
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 30370-2022
$185.00