Valid

GB/T 36045-2018Supervision specification of unit capacity expansion retrofit for coal-fired power plants (English PDF)

燃煤火电机组增容改造监管规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36045-2018 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 15, 2018

Implementation date

October 1, 2018

Scope

GB/T 36045-2018 is the English-translated version of 燃煤火电机组增容改造监管规范.

GB/T 36045-2018 is the Chinese specification for supervising capacity expansion retrofits of coal-fired thermal power units.

It sets the prerequisites a unit must meet before its capacity is increased, how the capacity is verified after the retrofit, the performance and operating requirements that apply afterwards, and how the retrofit is declared and approved.

It defines capacity expansion and the coal consumption for power supply, calculated in grams of standard coal per kilowatt-hour from boiler, turbine and pipe efficiencies and the plant's own electricity rate.

Its introduction explains why it was written: some expanded units could run at their new rating only for short periods, with poor economy, large life loss and a marked drop in primary frequency regulation. It was issued on 15 March 2018 and has applied since 1 October 2018.

Found what you need?

Document preview — GB/T 36045-2018

National Standard of the People's Republic of China

ICS
27.100
Classification
F 20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Prerequisites for capacity increase of coal-fired thermal power units
  • 5 Capacity verification of coal-fired thermal power units after capacity expansion
  • 6 Performance and Operation Requirements after Capacity Expansion of Coal-fired Thermal Power Units
  • 7 Declaration and Approval of Capacity-Enhancing Reform of Coal-fired Thermal Power Units

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

Introduction

In recent years, the capacity expansion of coal-fired thermal power units has generally been carried out throughout the country. There are two main motives for power generation companies to implement capacity expansion.

First, under the planned system, increasing the capacity of the unit can be used to obtain more power generation plan targets, so as to obtain additional benefits;

Capacity transformation, increase power generation output, reduce coal consumption and improve economic efficiency. The motivation is different, and the operation method and the final effect of implementing the capacity expansion reform are not with. Due to the lack of a unified regulatory standard, the increase in capacity of units has emerged in operational procedures, technical indicators, safe operation, and practical results.

Problems, such as capacity expansion of some units can only be operated in a short period of time under certain operating conditions, poor economic performance, large life loss, primary frequency modulation capability and phase-in operation The capacity has dropped significantly. In order to ensure the orderly expansion of the scientific and normative regulations for increasing capacity and to ensure the safe and economical operation of the power system, the Based on the relevant technical standards of the electric power industry and the laws and regulations of electric power supervision, the regulatory standards for the expansion of coal-fired thermal power units have been formulated.

1 Scope

This standard stipulates the applicable scope, modification conditions, capacity test and performance requirements and capacity of the capacity-increasing transformation of coal-fired thermal power units. Appraisal of regulatory technical indicators and methods in such areas.

This standard applies to the regulation of the expansion of coal-fired thermal power units.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest version (including all amendments) applies to this document.

GB/T 18149 centrifugal pump, mixed flow pump and axial pump hydraulic performance test specification

GB/T 30370 Primary frequency modulation test and performance acceptance guide for thermal power generating units

GB 50660 Design Specification for Large and Medium-sized Thermal Power Plants

Field Performance Test of DL/T 469 Power Station Boiler Fan

DL/T 711 Turbine Regulation Control System Test Guidelines

DL/T 1166 Field Test Guide for Large Generator Excitation System

DL/T 1210 Thermal power plant automatic power generation control performance test acceptance procedures

DL/T 1235 synchronous generator prime mover and its regulation system parameters measurement and modeling guidelines

DL/T 1523 Synchronous Generator Phase Test Guidelines

DL/T 5295 Regulations for Acceptance and Evaluation of Commissioning Quality of Units for Thermal Power Generation Construction Engineering

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Capacity expansion

The power generation enterprises upgrade the coal-fired thermal power units to increase the generating capacity of the units and realize energy conservation and consumption reduction.

3.2 Coal consumption for power supply

In the statistical calculation period, the average amount of standard coal consumed by each generating unit to provide 1kWh of electrical energy is calculated according to formula (1).

In the formula:

Bg --- Coal consumption for power supply in grams of standard coal per kilowatt-hour (gce/kWh);

Lfcy --- power plant electricity rate, expressed as a percentage (%);

eta g --- boiler efficiency, expressed as a percentage (%);

eta q --- turbine efficiency, expressed as a percentage (%);

eta gd --- Pipe efficiency, expressed as a percentage (%).

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 36045-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36045-2018

$145.00