GB/T 26863-2022Terminology of monitoring and control system of thermal power station (English PDF)
火电站监控系统术语
This is a limited preview
Buy now to download the full PDF (120 pages)
Need quotation for your management?
Get a formal quotation for GB/T 26863-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 30, 2022
Implementation date
July 1, 2023
Scope
GB/T 26863-2022 is the English-translated version of 火电站监控系统术语.
GB/T 26863-2022 is the Chinese terminology standard for the monitoring and control systems of thermal power stations.
It defines the basic terms and those used for control methods and levels, measurement and sensing, instruments, actuators and intelligent devices, monitoring functions and systems, control functions and systems, protection functions and systems, computer control systems, information systems, functional safety and cybersecurity, and credibility.
New entries include smart power plant, explosive atmosphere, equipment protection level, inspection robot, data lake, digital twin, edge computing and blockchain, and reliability is recast as credibility.
It applies to conventional thermal power plants, solar thermal, geothermal and biomass thermal power plants and to the conventional island and auxiliary systems of nuclear power plants.
It cites GB/T 4208 and GB/T 17626, replaces GB/T 26863-2011, was issued on 30 December 2022 and has applied since 1 July 2023.
Found what you need?
Document preview — GB/T 26863-2022
National Standard of the People's Republic of China
- ICS
- 01.040.29
- Classification
- F 22
- Replacing
- GB/T 26863-2011
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Basic terms
- 4 Control methods and levels
- 5 Measurement (sensing), instruments and actuators, intelligent tools (apparatus)
- 6 Monitoring function and system
- 7 Control function and system
- 8 Protection functions and systems
- 9 Computer Control System
- 10 Information Systems
- 11 Functional safety and cybersecurity
- 12 Credibility
- 13 Other
- References
- Index
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.
This document replaces GB/T 26863-2011 "Terms for Thermal Power Station Monitoring System". Compared with GB/T 26863-2011, except for structural adjustment In addition to editorial changes, the main technical changes are as follows.
a) Added the terms "solar thermal power station", "geothermal power station" and "biomass thermal power station" (see 3.5~3.7), and deleted the term "system system" (see 3.10 of the 2011 edition);
b) Added the terms "smart power plant" (see 4.7), "digital power plant, virtual power plant, centralized control building, network control building, network relay Room" (see 4.8, 4.9, 4.11.1, 4.11.2, 4.11.9), changed the definition of "automation level" (see 4.6, 11.6 of the 2011 edition), - Deleted the term "main control building" (see 11.8.3 of the 2011 edition);
c) Added the terms "explosive atmosphere" (see 5.1.52), "equipment protection level, level Ma, level Mb, level Ga, level Gb, level Gc, level Da Level, Db level, Dc level" (see 5.1.54), "COD analyzer" (see 5.2.66), "detector, combustible gas detector, toxic gas Detector" (see 5.2.67), "pyranometer" (see 5.2.78), "pyramidometer" (see 5.2.79), "sensing, sensing equipment, mode Recognition, Image Recognition, Computer Vision, Machine Vision, Biometric Recognition, Voiceprint Recognition, Face Recognition, Iris Recognition, Fingerprint Recognition Gender, radio frequency identification, inspection robot" (see 5.5), changed the definition of "fieldbus" (see 5.4.1, 4.4.1 of the 2011 edition);
d) Added terms "tertiary frequency modulation, automatic reactive voltage control, ancillary services, black start, mirror field control system, heliostat array control device, direct light characteristic calibration system, collector field control system, solar closed-loop control system" (see 7.29.1.7, 7.29.11~ 7.29.13, 7.37~7.41), changed the definition of "intelligent control, secondary frequency regulation, automatic power generation control, auxiliary workshop centralized control system" meaning (see 7.12, 7.29.1.6, 7.29.8, 7.42, 6.12, 6.29.1.6, 6.29.8, 6.37 of the 2011 edition);
e) The terms "gas turbine unit protection system, overspeed control device, overspeed blocking device, fuel shut-off valve, overtemperature control device, Over-temperature protection device, over-temperature detector, ignition failure blocking device, flameout blocking device, alarm protection system, low fuel pressure Protection device, [lubricating] oil pressure too low protection device, [lubricating] oil temperature too high protection device, axial displacement protection device, manual shutter disconnecting device" (see 8.8);
f) Added the term "computer network, power network computer monitoring system" (see 9.7, 9.19), and changed the definition of "configuration" (see 9.14.12, 8.13.12 of the 2011 edition), "programmable logic controller" (see 9.16, 8.15 of the 2011 edition), the term was deleted "Decentralized process computer system" (see 8.5 of the 2011 edition);
g) Added terms "data lake, digital twin, graph database" (see 10.42, 10.44, 10.50), "data center, host room, auxiliary area, support area, administrative management area" (see 10.37), "embedded system, special purpose instruction set processor, field programmable gate array, special purpose Integrated circuits, single-chip systems, systems-on-chips, networks-on-chips, industrial Internet, cloud computing, cloud services, resource pooling, and cloud deployment models type, hybrid cloud, private cloud, public cloud, edge, edge computing, big data, data mining, data analysis, data fusion, software definition Storage, Software Defined Networking, Network Virtualization, Virtual Machines, Virtual Reality, Augmented Reality, Containers, Live Migration of VMs, Blocks Chain, blockchain as a service, Byzantine fault tolerance mechanism, decentralized application, distributed ledger, public distributed ledger system, private distributed Distributed ledger system, smart contract" (see 10.58~10.83.7), changed "risk management, enterprise resource planning, smart data Library" definition (see 10.29, 10.46, 10.51, 9.29, 9.43, 9.47 of the 2011 edition), delete the term "digital power plant" (see 9.68 of the 2011 edition);
h) Added the term "functional safety and network security" (see Chapter 11), and changed the definition of "firewall, safety integrity level" (see 11.2.50, 11.1.21, 8.8.47, 7.11 of the 2011 edition), delete the term "network security isolation gatekeeper" (see 9.57);
i) Change "reliability" to "credibility" (see Chapter 12, Chapter 10 of the 2011 edition), and add "failure mechanism, failure mode, Failure detection, time to failure detection, service life, corrective maintenance, preventive maintenance, planned maintenance, condition monitoring" terms (see 12.3, 12.4, 12.11, 12.12, 12.16, 12.48, 12.49, 12.50, 12.53), changed the "failure, failure, latent failure, intermittent Fault, persistent fault, fault location, fault diagnosis, repair, reliability, maintainability, maintainability, availability, reliability, flatness Average working time before failure, Mean working time between failures, Available time, Redundancy, Working redundancy, Standby redundancy, Fault tolerance, Failure Safety, reliability models, failure mode and effects analysis, fault trees, predictive maintenance, condition-based maintenance, reliability-centred maintenance "repair" definition (see 12.2, 12.5, 12.6, 12.8, 12.9, 12.13~12.15, 12.23~12.30, 12.32~12.36, 12.38, 12.41, 12.42, 12.51, 12.52, 12.54, 10.28, 10.2, 10.5, 10.7, 10.8, 10.13~10.15 of the 2011 edition, 10.23~10.27, 10.29~10.31, 10.33~10.37, 10.39, 10.42, 10.43, 9.61, 9.62), the term "failure Mechanism, transient fault, fault identification, fault identification time, fault resolution" (see 10.3, 10.6, 10.10, 2011 edition 10.11, 10.12).
1 Scope
This document defines the terms and definitions related to thermal power station monitoring system.
This document is applicable to conventional thermal power plants, solar thermal power plants, geothermal power plants, biomass thermal power plants, conventional islands of nuclear power plants and auxiliary system.
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 4208 enclosure protection level (IP code)
GB/T 17626 (all parts) Electromagnetic compatibility test and measurement technology
3 Basic terms
3.1 Power generation
The process of obtaining electrical energy from other forms of energy.
3.2 Power plant
Facilities for generating electricity.
Note: Usually includes buildings (structures), energy conversion equipment and all necessary auxiliary equipment.
3.3 Thermal power station
A power station that generates electricity by converting thermal energy.
Note: Heat energy may be obtained from multiple energy sources.
3.4 Conventional thermal power plant
Burn coal, oil, natural gas or other hydrocarbon fuels, and convert the obtained heat energy into mechanical energy to drive the generator set to produce electric energy thermal power station.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 120 pages — is available in the English PDF.
Referenced standards
Cited by
- GB/T 30372-2024Guide for acceptance of distributed control system for thermal power plant
- GB/T 31461-2024Guide for run back and fast cut back control in fossil fuel power plants
- GB/T 44770-2024Technical requirements for intelligent thermal power plants
- GB/T 30370-2022Guide of primary frequency control test and performance acceptance for thermal power generating units
- DL/T 1083-2019Specification of distributed control system for fossil fuel power plant
- DL/T 996-2019Specification of steam turbine control system for thermal power plant
Similar standards
Editions of GB/T 26863
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 26863-2022 | Terminology of monitoring and control system of thermal power station | current edition | Current |
| GB/T 26863-2011 | Terminology of monitoring and control system of thermal power station | previous edition | Superseded |
This page sells the current edition, GB/T 26863-2022. Earlier editions are listed for reference only.
How to Download GB/T 26863-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17626.1-2006 — [Replaced by GB/Z 17626.1-2024] Electromagnetic compatibility -- Testing and measurement techniques -- Overview of immunity tests
GB/T 17626.10-2017 — Electromagnetic compatibility -- Testing and measurement techniques -- Damped oscillatory magnetic field immunity test
GB/T 17626.11-2023 — Electromagnetic compatibility - Testing and measurement techniques - Part 11: Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
Secure payment via Stripe
Payments accepted
GB/T 26863-2022
$2,060.00