GB/T 30372-2024Guide for acceptance of distributed control system for thermal power plant (English PDF)
火力发电厂分散控制系统验收导则
This is a limited preview
Buy now to download the full PDF (54 pages)
Need quotation for your management?
Get a formal quotation for GB/T 30372-2024 in 30 minutes.
Issued by
State Administration for Market Regulation; Standardization Administration of the PRC
Level / Type
National · Recommended
Issue date
August 23, 2024
Implementation date
August 23, 2024
Scope
GB/T 30372-2024 is the English-translated version of 火力发电厂分散控制系统验收导则.
GB/T 30372-2024 is the Chinese standard "Guide for acceptance of distributed control system for thermal power plant". Its scope clause reads: This document specifies the basic contents and requirements of the acceptance of the distributed control system (DCS) of thermal power plants (including factory acceptance and on-site restoration test).
Require. This document is applicable to the DCS of new or upgraded thermal power units with a single unit capacity of 300MW and above, and other capacity units. For reference only. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 30372-2024
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- K 51
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 General
- 5 DCS factory acceptance
- 5.1 Acceptance Basis
- 5.2 Acceptance test conditions and required instruments and equipment
- 5.3 Documentation Acceptance
- 5.4 System Configuration Inspection and Acceptance
- 5.5 Appearance and structure inspection and acceptance
- 5.6 System operating environment inspection and acceptance
- 5.7 Software Installation Inspection and Acceptance
- 5.8 System reliability test acceptance
- 5.9 Data Acquisition System Functional Test Acceptance
- 5.10 System time response test acceptance
- 5.11 Satellite clock timing function test acceptance
- 5.12 MMI display function test acceptance
- 5.13 System online download function test acceptance
- 5.14 Application Software Functional Test Acceptance
- 5.15 MFT trip relay cabinet function test acceptance
- 5.16 Fieldbus test acceptance
- 5.17 System reserve capacity and load factor test acceptance
- 5.18 System Stability Assessment and Acceptance
- 5.19 DCS factory acceptance report
- 6 On-site restoration test
- 6.1 Test conditions
- 6.2 Test focus
- 6.3 DCS power supply
- 6.4 Recovery test safety measures
- 6.5 Specific test items
- 6.6 On-site restoration test report
- 7 DCS network security inspection and acceptance
- Appendix A (Normative) Documentation Acceptance
- Appendix B (Normative) System Configuration Inspection and Acceptance
- Appendix C (Normative) Controller (cabinet) configuration inspection and acceptance
- Appendix D (Normative) Appearance and structural inspection and acceptance
- Appendix E (Normative) System Operation Environment Inspection and Acceptance
- Appendix F (Normative) Software Installation Inspection and Acceptance
- Appendix G (Normative) System Safety Performance Test Acceptance
- Appendix H (Normative) Data Acquisition System Functional Test Acceptance
- Appendix I (Normative) Operator Station Function Test Acceptance
- Appendix J (Normative) System Online Download Function Test Acceptance
- Appendix K (Normative) Application Software Functional Test Acceptance
- Appendix L (Normative) Fieldbus Test Acceptance
- Appendix M (Normative) System Reserve Capacity (Load Rate) Test Acceptance
- Appendix N (Normative) DCS factory test acceptance summary table
- Appendix O (Normative) Summary table of field restoration tests
- References
1 Scope
This document specifies the basic contents and requirements of the acceptance of the distributed control system (DCS) of thermal power plants (including factory acceptance and on-site restoration test).
Require.
This document is applicable to the DCS of new or upgraded thermal power units with a single unit capacity of 300MW and above, and other capacity units.
For reference only.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 15479 Technical requirements and test methods for insulation resistance and insulation strength of industrial automation instruments
GB/T 20438 (all parts) Functional safety of electrical/electronic/programmable electronic safety-related systems
GB/T 21109.1 Functional safety of safety instrumented systems in process industries Part 1.Framework, definitions, systems, hardware and applications
Programming requirements
GB/T 22239 Information security technology Network security level protection basic requirements
GB/T 26863 Terminology of thermal power station monitoring system
GB/T 36293 Technical requirements for distributed control systems of thermal power plants
GB 42250 Information security technology - Safety technical requirements for network security products
DL/T 656 Acceptance test procedures for steam turbine control and protection systems in thermal power plants
DL/T 1083-2019 Technical requirements for distributed control systems of thermal power plants
3 Terms and definitions
The terms and definitions defined in GB/T 26863 and the following apply to this document.
3.1
Computer, communication and screen display technology are used to realize data collection, control and protection functions of the production process, and communication technology is used to realize
A multi-computer monitoring system with data sharing is now available.
Note. Its main features are decentralized functions, centralized operation and display, and data sharing. Depending on the specific situation, it can also be decentralized in hardware layout.
[Source. GB/T 26863-2022, 9.14]
3.2 CPU load rateCPUloadrate
At a certain time, the total computing load borne by the central processing unit in a computer or controller is equal to its rated full load capacity.
The ratio of force.
[Source. GB/T 26863-2022, 9.6.3]
GB/T 2820.7 | GB/T 2820.9 | GB/T 2317.4 | GB/T 11920 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 54 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 15479Technical requirements and test methods of insulation resistance and insulating strength for use in industrial process measurement and control instruments
- GB/T 21109.1Functional safety of safety instrumented systems in the process industry sector - Part 1: Framework, definitions, system, hardware and application programming requirements
- GB/T 22239Information security technology - Baseline for classified protection of cybersecurity
- GB/T 26863Terminology of monitoring and control system of thermal power station
- GB/T 36293Specification for distributed control systems in thermal power plants
- GB 42250Information security technology - Security technical requirements for specialized cybersecurity products
GB/T 20438
Cited by
- GB/T 39944-2021Digital cone yarn dyeing complete equipment—General technical specification
- DL/T 1083-2019Specification of distributed control system for fossil fuel power plant
- DL/T 996-2019Specification of steam turbine control system for thermal power plant
- GB/T 36285-2018Specification for steam turbine electro-hydraulic control systems in thermal power plants
- GB/T 36293-2018Specification for distributed control systems in thermal power plants
- GB/T 11920-2008General specification of central control equipment and system for electrical parts in power stations and substations
Similar standards
Editions of GB/T 30372
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 30372-2013 | Guide for acceptance of distributed control system for thermal power plant | first issue | Superseded |
| GB/T 30372-2024 | Guide for acceptance of distributed control system for thermal power plant | first revision | Current |
This page sells the current edition, GB/T 30372-2024. Earlier editions are listed for reference only.
How to Download GB/T 30372-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 42250-2022 — Information security technology - Security technical requirements for specialized cybersecurity products
GB/T 15479-1995 — Technical requirements and test methods of insulation resistance and insulating strength for use in industrial process measurement and control instruments
GB/T 20438.1-2017 — Functional safety of electrical/electronic/programmable electronic safety-related systems -- Part 1: General requirements
Secure payment via Stripe
Payments accepted
GB/T 30372-2024
$600.00