Valid

GB/T 28750-2012General technical rules for measurement and verification of energy savings (English PDF)

节能量测量和验证技术通则

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 28750-2012 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 5, 2012

Implementation date

January 1, 2013

Scope

GB/T 28750-2012 is the English-translated version of 节能量测量和验证技术通则.

GB/T 28750-2012 is the Chinese standard "General technical rules for measurement and verification of energy savings".

Its scope clause reads: This standard specifies the measurement and verification of energy savings related definitions, calculation principles, methods, content, technical requirements and measurement and verification party Case and so on.

This standard applies to section energy saving technological transformation projects (hereinafter referred to as the "Project") measurement and verification. New projects, management items Objective measurement and verification of energy savings can also use and reference. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 28750-2012

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 3.1 Energy-saving measures energyconservationmeasures; ECM
  • 3.2 The project boundary
  • 3.3 Base period
  • 3.4 Statistical reporting period
  • 3.5 Base period consumption
  • 3.6 Statistical reporting period energy

1 Scope

This standard specifies the measurement and verification of energy savings related definitions, calculation principles, methods, content, technical requirements and measurement and verification party

Case and so on.

This standard applies to section energy saving technological transformation projects (hereinafter referred to as the "Project") measurement and verification. New projects, management items

Objective measurement and verification of energy savings can also use and reference.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated edition applies to this article

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 2587 General energy Energy Balance

GB/T 6422 energy-using equipment to test guidelines

GB/T 8222 General electrical equipment, energy balance

GB/T 13234-2009 method of calculating energy companies

GB/T 24915 contract energy management technology General

JJF1059 Evaluation and Expression of Uncertainty in Measurement

3 Terms and Definitions

GB/T 13234, GB/T 24915 and define the following terms and definitions apply to this document.

3.1 Energy-saving measures energyconservationmeasures; ECM

In order to improve energy efficiency or reducing energy consumption uses.

3.2 The project boundary

Implement energy saving measures affected by using units, equipment, location and scope of the system boundaries.

3.3 Base period

To compare and determine the energy savings projects, energy-saving measures before the implementation period.

3.4 Statistical reporting period

To compare and determine the energy savings projects, energy-saving measures after the implementation period.

3.5 Base period consumption

During the base period, using units within the project boundary, equipment, systems energy consumption.

3.6 Statistical reporting period energy

Statistical reporting period, within the project boundary using units, equipment, systems energy consumption.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Cited by

Similar standards

How to Download GB/T 28750-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 28750-2012

$105.00