GB/T 36571-2018Technical specification for measurement and verification of electric energy and power savings for parallel reactive power compensation project (English PDF)
并联无功补偿节约电力电量测量和验证技术规范
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for GB/T 36571-2018 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 17, 2018
Implementation date
April 1, 2019
Scope
GB/T 36571-2018 is the English-translated version of 并联无功补偿节约电力电量测量和验证技术规范.
GB/T 36571-2018 explains how to measure and verify the electric energy and power saved when a parallel reactive power compensation device is installed in a power supply and distribution system.
It covers the main content of measurement and verification, the test plan, the technical requirements for measuring and verifying the savings, and the analysis and assessment of uncertainty.
Annexes give the calculation of parallel reactive power savings, the calculation of the reactive economy equivalent and a worked example of a measurement uncertainty assessment.
It applies to energy saving certification and to evaluating the effect of compensation devices once they are in operation, and it can also guide their planning, design, construction and retrofit.
Grid companies and energy service providers use it. It was issued on 17 September 2018 and has applied since 1 April 2019.
Found what you need?
Document preview — GB/T 36571-2018
National Standard of the People's Republic of China
- ICS
- 29.240.01
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Main contents of measurement and verification
- 5 Technical requirements for measurement and verification
- 6 Uncertainty analysis and assessment
- Appendix A (Normative Appendix) Calculation of Parallel Reactive Power Savings
- Appendix B (informative appendix) Calculation of reactive economy equivalent value
- Appendix C (informative) Example of measurement uncertainty assessment
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard stipulates that a parallel reactive power compensation device is installed in the power supply and distribution system, and the reactive power of the connected system is made when it is in normal and stable operation.
Power consumption and power saving and power measurement and verification methods, including the main content of measurement and verification, test plan, technical requirements, no Deterministic analysis and assessment.
This standard is applicable to the certification of energy saving and the evaluation of energy saving effects after the parallel reactive power compensation device is put into operation in the power distribution system.
It is suitable for the planning, design, construction and transformation of parallel reactive power compensation devices in power supply and distribution systems.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 16664-1996 Energy-saving monitoring method for enterprise power supply and distribution system
GB/T 20298-2006 Static reactive power compensation device (SVC) functional characteristics
GB/T 28750-2012 General rules for energy measurement and verification
GB/T 32823-2016 Technical Guidelines for Energy Savings Measurement and Verification of Power Grid Energy Saving Projects
DL/T 448-2016 Technical Regulations for Energy Metering Devices
DL/T 5242-2010 35kV~220kV substation reactive power compensation device design technical regulations
JJF1059.1-2012 Measurement uncertainty evaluation and representation
EVO10100-1..2014 International Energy Efficiency Measurement and Verification Protocol Statistics and Uncertainty (Internationalper-formancemeasurementandverificationprotocol-StatisticsanduncertaintyforIPMVP)
3 Terms and definitions
The terms and definitions defined in GB/T 28750-2012, GB/T 32823-2016 and DL/T 5242-2010 apply to this document. For ease of use, some of the terms and definitions in DL/T 5242-2010 are repeated below.
3.1 Reactive power compensation device
A general term for devices that compensate for capacitive or inductive reactive power. [DL/T 5242-2010, definition 3.0.21]
3.2 Parallel reactive compensation
The reactive power compensation device is installed in parallel in the substation, power line, distribution transformer and terminal power equipment to improve the access system. Power factor, reduced power loss and improved power quality.
3.3 Reactive economy equivalent
The decrease in the active power loss of the system caused by the reduction of unit reactive power in the power distribution system.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 16664-1996Monitoring and testing method for energy saving of power supply distribution system of industrial enterprise
- GB/T 20298-2006The functional specification of Static Var Compensater
- GB/T 28750-2012General technical rules for measurement and verification of energy savings
- GB/T 32823-2016General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid
- DL/T 448-2016Technical administrative code of electric energy metering
- DL/T 5242-2010Technical rules for designing of reactive power compensation equipment in 35kV~220kV substations
Similar standards
How to Download GB/T 36571-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 448-2016 — Technical administrative code of electric energy metering
DL/T 5242-2010 — Technical rules for designing of reactive power compensation equipment in 35kV~220kV substations
GB/T 16664-1996 — Monitoring and testing method for energy saving of power supply distribution system of industrial enterprise