Valid

GB/T 33857-2017General principles for energy conservation assessment—Combined heat and power generation project (English PDF)

节能评估技术导则 热电联产项目

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 33857-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

May 31, 2017

Implementation date

December 1, 2017

Scope

GB/T 33857-2017 is the English-translated version of 节能评估技术导则 热电联产项目.

GB/T 33857-2017 sets out the content and the requirements of the energy conservation assessment made for a combined heat and power project.

It starts with the preparatory work: fixing the boundary of the assessment so that it matches the scope of investment and construction and covers energy purchase and storage, conversion, transmission and end use, taking in the existing facilities where the project builds on an earlier one, and settling that boundary with the construction unit.

It applies to new, rebuilt and expanded fixed-asset CHP projects that use a steam turbine, a gas turbine or a gas-steam combined cycle as heat source, and other CHP projects may follow it.

Terminology comes from GB/T 31341 and DL/T 1365, energy consumption calculation from GB/T 2589. Issued on 31 May 2017, it has applied since 1 December 2017.

Found what you need?

Document preview — GB/T 33857-2017

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative reference documents
  • 3 Terms and definitions
  • 4 Energy assessment content and requirements

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the content and requirements for energy efficiency assessment of cogeneration projects.

This standard applies to the use of steam turbine, gas turbine or gas-steam combined cycle power generation and as a heat source of new or modified, expansion Cogeneration fixed assets investment projects, other cogeneration projects can refer to the implementation of the project.

2 Normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this document. For undated references, the latest edition (including all modifications) applies to this document.

GB/T 2589 General rules for calculation of energy consumption

GB/T 3484 General Principles of Enterprise Energy Balance

GB/T 15587 Guide for energy management for industrial enterprises

GB 17167 General rules for the preparation and management of energy - carrying units

GB/T 21369 General rules for equipment and management of energy metering equipment for thermal power enterprises

GB/T 23331 Energy management system requirements

GB/T 28749 Enterprise Energy Balance Network Drawing Method

GB/T 28750 Energy saving and verification techniques

GB/T 28751 Enterprise energy balance table preparation method

GB/T 31341 Technical Guidelines for Energy Efficiency Assessment

GB 50660 Code for design of large and medium - sized thermal power plants

DL/T 1365 Term energy saving

3 Terms and definitions

The terms and definitions defined in GB/T 31341, DL/T 1365 apply to this document.

4 Energy assessment content and requirements

4.1 Pre-preparation

4.1.1 Determine the scope of energy efficiency assessment

The scope of energy efficiency assessment should be consistent with the scope of investment and construction, and reflect the integrity of the project, covering energy purchase storage, processing conversion, transmission points With the whole process of using the terminal.

When the project is based on the original project, the energy consumption of the facilities related to the original project should also be included in the scope of assessment.

The organization that undertakes the energy conservation assessment shall communicate fully with the CHP construction unit, clarify the boundary of the project energy system, determine the energy conservation assessment range.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 33857-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 33857-2017

$145.00