Valid

GB/T 36573-2018Technical specification for measurement and verification of electric energy and power saving for voltage step-up operation of power line project (English PDF)

电力线路升压运行节约电力电量测量和验证技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36573-2018 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 17, 2018

Implementation date

April 1, 2019

Scope

GB/T 36573-2018 is the English-translated version of 电力线路升压运行节约电力电量测量和验证技术规范.

GB/T 36573-2018 specifies how to measure and verify the electric energy saved when a power line is operated at a raised voltage.

It covers the main content of measurement and verification, the test plan and technical requirements, the calculation of the energy saved and the analysis and assessment of uncertainty, with normative annexes on calculating the savings and on measuring line load losses in the reporting period.

It defines voltage step-up operation, energy consumption parameters and measurement on the high-voltage side of the transformer. It applies to certifying the savings from step-up operation of AC power lines, and to energy-saving assessment before a step-up project is carried out.

It draws on GB/T 28750-2012, the general rules for energy measurement and verification, and on the IPMVP protocols. It was issued on 17 September 2018 and has applied since 1 April 2019.

Found what you need?

Document preview — GB/T 36573-2018

National Standard of the People's Republic of China

ICS
29.240.01
Classification
F 20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Main contents of measurement and verification
  • 5 Technical requirements for measurement and verification
  • 6 Uncertainty analysis and assessment
  • Appendix A (Normative Appendix) Calculation of Power Savings for Power Line Boost Operation
  • Appendix B (normative appendix) Measurement of load loss during line reporting period

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard stipulates the measurement and verification of the power saved by the power line due to the increase of the operating voltage.

The law includes the main content of measurement and verification, test plans and technical requirements, calculation of power saving and uncertainty analysis.

This standard is applicable to the certification of AC power line boosting operation to save power, and is also applicable to energy saving before the implementation of line boosting project. Evaluation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 16664-1996 Energy-saving monitoring method for enterprise power supply and distribution system

GB/T 28750-2012 General rules for energy measurement and verification

DL/T 448-2000 Technical Regulations for Energy Metering Devices

DL/T 686-1999 Power grid energy loss calculation guidelines

JJF1059.1-2012 Measurement uncertainty evaluation and representation

EVO10000-1.2014 core concept of international energy efficiency measurement and verification procedures (Internationalperformancemeas-urementandverificationprotocol-Coreconcepts)

EVO10100-1..2014 International Energy Efficiency Measurement and Verification Protocol Statistics and Uncertainty (Internationalper-formancemeasurementandverificationprotocol-StatisticsanduncertaintyforIPMVP)

3 Terms and definitions

The following terms and definitions as defined in GB/T 28750-2012 apply to this document.

3.1 Voltage step-up operation of power line

After the power line is implemented, the power line is allowed to operate at a higher voltage level due to changes in physical facilities to improve the line. Technical means for conveying capacity and reducing operating losses.

Note: The power line may not implement the boosting retrofit project, and only increase the operating voltage to a value higher than the nominal voltage to continuously improve Power quality and reduce operating losses.

3.2 Energy consumption parameter

A variable or constant that affects the energy-saving effect of an energy management project activity.

3.3 High pressure side measurement

The electric energy metering device is installed on the high voltage side of the power transformer and measures the high voltage side parameters.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 36573-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36573-2018

$175.00