NB/T — Energy Industry
Found: 3876 — page 76 of 81
Valid
NB/T 20149-2012 — Qualification Procedure for Pressure Transmitter Important to Safety of Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$485.0053 pages
Valid
NB/T 20150-2012 — Characteristics and Test Methods of Self-powered Neutron Detectors for Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20151-2012 — Guideline for Preparing Ageing Management Programme of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20152-2012 — Ageing Management Guideline of Piping in Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$375.0021 pages
Valid
NB/T 20153-2012 — Ageing Management Guideline of Prestressed Concrete Containment in Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$345.0020 pages
Valid
NB/T 20154-2012 — Guideline of Ageing Management for PWR Reactor Pressure Vessels
Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid
NB/T 20155-2012 — Aging Management on Class 1E Equipment Used in Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid
NB/T 20156-2012 — Requirement for Compilation and Optimization for Preventive Maintenance Program at Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20157-2012 — Quality Assurance Requirements for Construction of Nuclear Power Project
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20158-2012 — Specification for volute concrete construction of circulating water pumps of pressurized water reactor nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20159-2012 — The Construction Technical Specification for Liner of Reactor Building of PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20160-2012 — The Technical Specification for Watertight Stainless Steel Liner of PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid
NB/T 20161-2012 — Installation and Commissioning Technical Guideline for Ex-core Neutron Flux Measuring System for Pressurized Water Reactor of Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20162-2012 — Technical Requirements on the Cleaning Areas Establishment and Maintenance of PWR Nuclear Island Equipment During Storage, Installation and Start-up
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20163-2012 — Qualification Procedure for Containment Spray Pump and Low Head Safety Injection Pump of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20164-2012 — Qualification Procedure for Auxiliary Feed Water Motor-driven Pump of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20165-2012 — Qualification Procedure for Residual Heat Removal Pump of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20166-2012 — Qualification Procedure for Charging Pump of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20167-2012 — Qualification Procedure for Isolation Valve of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$285.0016 pages
Valid
NB/T 20168-2012 — Qualification Procedure for Check Valve of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20169-2012 — Qualification procedure for turbine-driven auxiliary feedwater pump of pressurized water reactor nuclear power plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20170-2012 — Qualification Procedure of Safety Class Diesel-generator Units for Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 20171-2012 — Qualification Procedure for Safety Class 3 Pump of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20172-2012 — Technical rules for nuclear engineering surveying datum network establishment
Industry·Recommended
Instant delivery (0–9 sec)
$1,110.0061 pages
Valid
NB/T 20173-2012 — Technical Specification for Installation and Test of Ring Crane in Reactor Building of PWR Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$319.0015 pages
Valid
NB/T 20174-2012 — Technical Specification for Onsite Manufacture and Acceptance of Carbon Steel & Stainless Steel Tanks of PWR Nuclear Island
Industry·Recommended
Instant delivery (0–9 sec)
$239.0015 pages
Valid
NB/T 20175-2012 — Technical Specification for Installation and Acceptance of Fuel Handling and Storage System of PWR Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$399.0015 pages
Valid
NB/T 20176-2012 — Design requirements for hydrogen, nitrogen, oxygen and carbon dioxide supply systems of PWR nuclear power plant
Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid
NB/T 20177-2012 — Design Criteria for Component Cooling Water System of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20178-2012 — Design Criteria of Nuclear Sampling System of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20179-2012 — Design Criteria for Compressed Air System of Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20180-2012 — Design Criteria for Compressed Air Supplying System of Nuclear Island in Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20181-2012 — Technical Specification of Radiation Environmental Impact Assessment for Airborne Radioactive Effluents of Nuclear Power Plant on Operational States
Industry·Recommended
Instant delivery (0–9 sec)
$315.0018 pages
Valid
NB/T 20182-2012 — Technical Specification for Radioactive Environmental Impact Assessment of Working Condition Airborne Radioactive Materials for Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$319.0015 pages
Valid
NB/T 20183-2012 — Compilation Guideline for Nuclear Power Plant Reliability Assurance Program
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20184-2012 — General Specification on Transport Vessel for Fresh Fuel Assembly of PWR Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20185-2012 — Design Criterion of Radiation Zoning Inside of the PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20186-2012 — Calculation of Doses to Public From Routine Releases of Reactor Radioactive Effluents
Industry·Recommended
Instant delivery (0–9 sec)
$345.0020 pages
Valid
NB/T 20187-2012 — Design Criteria for Reactor Coolant System in Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20188-2012 — Design Criteria for Essential Service Water System for Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20189-2012 — Interface design criteria for nuclear steam supply system and turbine building of pressurized water reactor nuclear power plant
Industry·Recommended
Instant delivery (0–9 sec)
$105.0015 pages
Valid
NB/T 20190-2012 — Noise Control for Production Buildings of Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$135.0015 pages
Valid
NB/T 20191-2012 — Accessibility Criteria for In-service Inspections in Structural Design of Pressurized Water Reactor Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$399.0015 pages
Valid
NB/T 20192-2012 — General Requirements for Pilot Operated Safety Valves of Pressurized Water Reactor Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$195.0015 pages
Valid
NB/T 20193-2012 — Code for Design of Steam/Water Piping of Conventional Island in Nuclear Power Plants
Industry·Recommended
Instant delivery (0–9 sec)
$1,490.0088 pages
Valid
NB/T 20194-2012 — Design Criterion of Radiation Shield in the PWR Nuclear Power Plant
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Valid
NB/T 20195-2012 — Procedure for reactor core thermal power measurement of pressurized water reactor nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$225.0015 pages
Valid
NB/T 25009-2012 — Energy statistics procedure for pressurized water reactor nuclear power plants
Industry·Recommended
Instant delivery (0–9 sec)
$165.0015 pages