Scope
GB/T 13927-2022 is the English-translated version of 工业阀门 压力试验.
GB/T 13927-2022 covers the pressure testing of metal industrial valves. Clause 4 sets the conditions added when a buyer takes part — testing a stock valve without stripping paint or coating from the shell surface, witnessed tests, and the optional test items a contract may call up. Clause 5 holds the requirements: safety precautions, where the test is carried out, the test rig and the pressure measuring equipment, the state of the shell surface, the test fluid, the test pressures, which tests apply to which valve, and how long pressure is held. Clause 6 gives the three methods — the shell test, the back closure test and the sealing test — and Clause 7 the acceptance criteria for each, closing with the certificate of conformity the manufacturer hands the buyer. Annex A maps the clause structure against ISO 5208:2015 and Annex B gives equivalent nominal sizes. A valve has to hold pressure and also move, and the two duties pull against each other. A rig that clamps the ends too hard distorts the body and lets a leaking seat pass, so the procedure has to be pinned down as tightly as the pass mark. For valve manufacturers, inspection bodies and purchasers who witness tests.
Document preview — GB/T 13927-2022
National Standard of the People's Republic of China
- ICS
- 23.060.01
- Classification
- J16
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope6
- 2 Normative references6
- 3 Terms and definitions6
- 4 Additional conditions for pressure test8
- 4.1 Buyer inspection8
- 4.2 Witness test8
- 4.3 Test selection items8
- 5 Pressure test requirements8
- 5.1 Safety tips8
- 5.2 Test location9
- 5.3 Test equipment9
- 5.4 Pressure measuring equipment9
- 5.5 Valve shell surface9
- 5.6 Test fluid9
- 5.7 Test pressure10
- 5.8 Pressure test items10
- 5.9 Duration of test pressure12
- 6 Test methods12
- 6.1 Shell test12
- 6.2 Back closure test13
- 6.3 Sealing test13
- 7 Test acceptance criteria14
- 7.1 Shell test14
- 7.2 Back closure test15
- 7.3 Sealing test15
- 7.4 Certificate of conformity15
- Appendix A (Informative) Comparison of structural number between this document and ISO 5208.201516
- Appendix B (Normative) Equivalent nominal size18
Foreword
This document was issued on 30 December 2022 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 July 2023.
It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.
1 Scope
GB/T 13927-2022 covers the pressure testing of metal industrial valves. Clause 4 sets the conditions added when a buyer takes part — testing a stock valve without stripping paint or coating from the shell surface, witnessed tests, and the optional test items a contract may call up. Clause 5 holds the requirements: safety precautions, where the test is carried out, the test rig and the pressure measuring equipment, the state of the shell surface, the test fluid, the test pressures, which tests apply to which valve, and how long pressure is held. Clause 6 gives the three methods — the shell test, the back closure test and the sealing test — and Clause 7 the acceptance criteria for each, closing with the certificate of conformity the manufacturer hands the buyer. Annex A maps the clause structure against ISO 5208:2015 and Annex B gives equivalent nominal sizes. A valve has to hold pressure and also move, and the two duties pull against each other. A rig that clamps the ends too hard distorts the body and lets a leaking seat pass, so the procedure has to be pinned down as tightly as the pass mark. For valve manufacturers, inspection bodies and purchasers who witness tests.
This document specifies pressure test additional conditions, pressure test requirements,
test methods, test acceptance criteria for industrial valves.
This document applies to pressure testing of metal valves.
2 Normative references
This document has no normative references.
3 Terms and definitions
The following terms and definitions apply to this document.
During the test, the gauge pressure of the test fluid, which is endured by the inner
cavity of the valve.
4 Additional conditions for pressure test
If the buyer performs a pressure test on a stock valve, the stock valve may be tested,
without removing paint or coating from the shell surface.
When the order contract requires it, the test of the "optional" items in Table 1 can be
carried out.
5 Pressure test requirements
The pressure test equipment shall not exert external forces, that would affect the valve
test results. If an end pair clamping test device is used, the valve manufacturer shall be
able to ensure that the test device does not affect the test results of the sealing
performance of the valve being tested.
6 Test methods
For valves with an upper sealing structure, close the inlet and outlet of the valve.
Fill the valve shell with liquid test medium. Drain the air in the valve body cavity. Use
the valve operating mechanism, to open the valve to the fully open position. Loosen the
packing gland bolts.
7 Test acceptance criteria
The valve manufacturer shall provide the buyer with a certificate of conformity,
certifying that the valve product complies with this document.
......
Appendix A for a list of structural number comparisons between this document and ISO
5208.2015.
The technical differences between this document and ISO 5208.2015 and their reasons
are as follows.
a) DELETE the terms and definitions of "test fluid temperature", "DN/NPS",
"PN/Class"; ADD the terms and definitions of "back closure test", which appears
in the document (see 3.3);
b) CHANGE the requirements for pressure measurement equipment (see 5.4), to
meet the needs of practical applications in China;
c) ADD the fluctuation requirements of test pressure (see 5.7.4), to meet the needs
of practical applications in China;
d) ADD the test item requirements for cast iron valves (see 5.8.2), to meet the needs
of practical applications in China;
e) INTEGRATE the contents noted in Tables 1 and 3 into the Tables and clauses (see
5.8 and 6.3.2).
This document has made the following editorial changes, as compared with ISO
5208.2015.
- DELETE Note 3 in Table 3 regarding "Plug gasket material requirements".
Please note that some content in this document may be subject to patents. The publisher
of this document assumes no responsibility for identifying patents.
This document was proposed by China Machinery Industry Federation.
This document shall be under the jurisdiction of the National Valve Standardization
Technical Committee (SAC/TC 188).
The drafting organizations of this document. Hefei General Machinery Research
Institute Co., Ltd., Hefei General Mechanical and Electrical Products Testing Institute
Co., Ltd., Shenzhen Quality and Safety Inspection and Testing Institute, Chengdu
Chenggao Valve Co., Ltd., Chaoda Valve Group Co., Ltd., Zhejiang Petrochemical
Valve Co., Ltd., Jiangsu Suyan Valve Machinery Co., Ltd., Zhejiang Bethel Technology
Co., Ltd., Yuanda Valve Group Co., Ltd., Jiangsu Shentong Valve Co., Ltd., Jiangsu
Chenggong Valve Technology Co., Ltd., Anhui Tongdu Fluid Technology Co., Ltd., Kai
Ruite Valve Co., Ltd., Baoyi Group Co., Ltd., Shanghai Guanlong Valve Energy Saving
Equipment Co., Ltd., Ningbo Jackron Precision Co., Ltd., Shenjiang Valve Co., Ltd.,
Ningbo Amico Copper Valve Co., Ltd., Zhejiang Province Pump and Valve Products
Quality Inspection Center, Zhejiang Yongyuan Valve Co., Ltd., Sichuan Jingkong Valve
Manufacturing Co., Ltd., Zhejiang Linuo Fluid Control Technology Co., Ltd., Jiangnan
Valve Co., Ltd., Zhuzhou Nanfang Valve Co., Ltd., Chengde High and Medium
Pressure Valve and Pipe Fittings Group Co., Ltd., Shaanxi Aerospace Pump and Valve
Technology Group Co., Ltd., Xuanda Industrial Group Co., Ltd., Xi'an Pump and Valve
General Factory Co., Ltd., Sichuan Feiqiu (Group) Co., Ltd., Zhejiang Deka Control
Valve and Instrument Co., Ltd., Zhejiang Wonderkai Fluid Equipment Technology Co.,
Ltd., Ningbo Ri'an Valve Co., Ltd., Suzhou Antwei Valve Co., Ltd., Zhejiang Ruige
Copper Co., Ltd., Beijing Building Materials Inspection Institute Co., Ltd., Zhejiang
Hualong Jushui Technology Co., Ltd., Jitai Valve Group Co., Ltd., Zhejiang Tingyu
Fluid Equipment Co., Ltd., Jinggong Valve Group Co., Ltd., Lianggong Valve Group
Co., Ltd., Guogong Holding Group Co., Ltd., Wuxi Skaur Automatic Control
Equipment Co., Ltd., Jiangsu Shengtai Valve Co., Ltd., Zhejiang Su Ming Valve Co.,
Ltd., Zhejiang Benigo Fluid Control Co., Ltd., Zhejiang Etz Valve Technology Co., Ltd.,
Bohai Valve Group Co., Ltd., Yonglong Valve Co., Ltd., Bande Valve Technology Co.,
Ltd., Chengdu Chuanli Intelligent Fluid Equipment Co., Ltd., Shanghai Yaao Valve Co.,
Ltd., Hangzhou Chunjiang Valve Co., Ltd., Guangzhou Jiafusi Valve Manufacturing
Co., Ltd., Wuhu Jinmao Fluid Technology Co., Ltd., Henan Saifu Special Equipment
Testing Co., Ltd., Zhejiang Lishui Technology Co., Ltd., Zhejiang Fansheng Fluid
Control Co., Ltd., Zhejiang Dabolin Valve Co., Ltd., Zhejiang Odehua Technology Co.,
Ltd., Dongbao Valve Co., Ltd., Zhejiang Hengjie Copper Co., Ltd., Zhejiang Jiada Fluid
Control Co., Ltd., Zhejiang Haoji Fluid Technology Co., Ltd., Zhejiang Yuquan Fluid
Technology Co., Ltd., Jinbo Valve Group Co., Ltd.
The main drafters of this document. Wang Xiaojun, Wu Huaikun, Zhang Jianbin, Sun
Qi, Zeng Pinqi, Wang Ce, Wu Huaimin, Wang Yin, Wu Shoijing, Feng Yuzhu, Chen
Lin, Chen Shuanghe, Yan Jie, Chen Yong, Zhang Xiaozhong, Liu Fengnian, Yan
Rongjie, Ye Jijun, Zheng Xuezhen, Sun Fengwei, Li Huanyu, Gu Lidong, Peng Yulin,
Huang Zilong, Huang Jing, Wang Lijun, Lin Zhongcan, Wang Qiang, Fu Yanhe, Zhu
Yongping, Huang Jianwei, Cha Zhao, Wu Haifeng, Li Yufei, Li Zhenkun, Wang
Yongchao, Jia Zhengye, Huang Binbin, Gao Kaike, Wang Xuepeng, Zhang Peng, Yu
Jinli, Huang Bin, Yan Tao, Su Zongyao, Liu Weili, Jiang Binlong, Chen Liyi, Yu Jinxian,
Xia Xuchao, Wan Jianhua, Liu Liyan, Chai Lu, Wu Fuquan, Sun Xiong, Li Wenguang,
Huang Hui, Zheng Lin, Lin Hailin, Lin Yong, Liu Yu, Wang Gaoneng, Zhong Jiahai,
Lin Ji, Wang Jianhong, Mao Tonglian.
This standard replaces the standard previously issued as follows.
- It was first published as GB/T 13927-1992 in 1992; it was first revised in 2008.
- This is the second revision.
Industrial valves - Pressure testing
Warning. This document does not include all safety matters during the test.
Personnel using this document shall be familiar with the test procedures AND have
the responsibility to take appropriate safety and health measures and comply with
national laws and regulations, especially during high-pressure gas tests.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.
Referenced standards
Cited by
- GB 15090-2026Fire hose reel
- GB/T 12226-2025General purpose industrial valves - Technical specification for gray iron castings
- GB/T 12227-2025General purpose industrial valves - Technical specification for ductile iron castings
- GB/T 12229-2025General purpose Industrial valves - Technical specification for carbon steel castings
- GB/T 12232-2025General purpose industrial valves - Flanged iron gate valves
- GB/T 12245-2025Methods of performance test for pressure reducing valves
Similar standards
How to Buy GB/T 13927-2022
- 1Add to cart. Click the "Buy GB/T 13927-2022" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 13927-2022
$200.00