General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China

Level / Type

National · Mandatory

Issue date

December 5, 2014

Implementation date

July 1, 2015

Scope

GB 6722-2014 is the English-translated version of 爆破安全规程.

GB 6722-2014 is the Chinese national standard on safety regulations for blasting, in the field of environment and health protection, safety. It carries no /T suffix, which in the Chinese system means compliance is mandatory: a product or a practice within its scope has to meet it to be lawfully made, sold or carried out in China. It was issued on 5 December 2014 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 July 2015. Classification: ICS 13.100, CCS C66. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

Document preview — GB 6722-2014

National Standard of the People's Republic of China

ICS
13.100
Classification
C66

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Blasting rating
  • 5 The basic provisions of blasting operations 6
  • 5.1 General provisions
  • 5.2 Blasting design and construction
  • 5.2.1 Design Basis
  • 5.2.2 Design Files
  • 5.2.3 Technical Design Content
  • 5.2.4 Construction Organization Design
  • 5.3 Security Assessment
  • 5.4 Safety Supervision
  • 6.1 Environmental blasting operations
  • 7 Opencast Blasting 18 8 underground blasting 22 9 hot blast 28
  • 30 Underwater Blasting 11 towns and demolition blasting shallow hole blasting 33 12 special blasting
  • 50 References

Foreword

All the technical contents of this standard is mandatory. This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard replaces GB 6722-2003 "Blasting Safety Regulations." Compared with GB 6722-2003, the main changes are as follows:

--- Adjust the layout structure of chapters increased from the original 7 to 14;

--- Added the necessary terms and definitions (see Chapter 3);

--- Modified blasting grading standards (see Chapter 4);

--- Supplement and improve the content of blasting safety assessment, construction supervision (see 5.3, 5.4);

--- Emphasize the design requirements and test explosions Initiating Network (see 6.4);

--- Supplement and improve the high temperature blasting safety regulations (see Chapter 9);

--- Supplementary demolition explosion pretreatment requirements (see 11.3);

--- Supplement and improve the content of special blasting (see Chapter 12);

--- Improve the environmental impact of blasting safety control standards (see Chapter 13);

--- Supplement and perfect the peak particle velocity and main vibration frequency, emphasizing the blasting vibration monitoring for the simultaneous determination of particle vibration should be mutually Vertical three components (see 13.2.2);

--- Shock in water to supplement the biological effects of water safety control standards (see 13.5);

--- Complement and complete the purchase of explosives, transportation, storage and use of provisions (see Chapter 14);

--- Remove the varieties to be eliminated blasting equipment, blasting and blasting processes. This standard was proposed by the State Administration of Work Safety. This standard by the National Standardization Technical Committee on non-coal mine production safety Safety Technical Committee (SAC/TC288/SC2) centralized. This standard was drafted. China Engineering Blasting Association, the Guangdong Hongda Blasting Co., Ltd. Zhejiang high energy blasting, Beijing Mining Research Institute, China Academy of Railway Sciences, Yangtze River Scientific Research Institute, Wuhan blasting companies, large construction group burst Chang Break, Qingdao Haiphong Engineering Bureau, Henan Schindler blasting Co., Tangshan Kim blasting Limited, a new joint blasting Guizhou Company, Wuhan Iron and Steel Group Co., Ltd. Environmental Safety Institute. The main drafters of this standard. EXPLOSIVES Zhengbing Xu, Zhang Zhengzhong, Xiexian Qi, pipe Zhiqiang, Zhang excellence, pool Enan at Bao Shu, Jin-bin, Zhang Zhengyu, Wang Qian, in Aaron, Zhoujia Han, Yan dragon thing, Mei Jinyu, Wang Hao, Lau, the high shade Tong, Gu Yicheng, Liu Honggang, Wuxin Xia, Zhangyong Zhe, Lau book, Li Xiaojie, Young Love, Li Zhanjun, check being cleared, EXPLOSIVES, Xie source, Chen Shao Pan, Xuepei Xing, high literature. This standard replaces the standards previously issued as follows:

1 Scope

GB 6722-2014 is the Chinese national standard on safety regulations for blasting, in the field of environment and health protection, safety. It carries no /T suffix, which in the Chinese system means compliance is mandatory: a product or a practice within its scope has to meet it to be lawfully made, sold or carried out in China. It was issued on 5 December 2014 by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China; Standardization Administration of China, and has been in force since 1 July 2015. Classification: ICS 13.100, CCS C66. This page is published from the official record of the standard held by the Chinese standards administration: the identification, the dates, the classification and the issuing body are taken from there. The clause text, the tables and the numeric limits are in the document itself, which is delivered complete in English translation.

This standard specifies the blasting and blasting unit purchase, transportation, storage, use, processing, inspection and destruction of blasting equipment safety skills requirement. This standard applies to all kinds of civil and blasting the PLA, non-military purposes Chinese People's Armed Police Force in the Blasting.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. Determination of the content of toxic gases after

GB 18098 Industrial Explosives

GB 50089 civilian blasting equipment engineering safety regulations GA837 Civil Explosives depot requirements of public security GA838 small civilian explosives depot safety norms GA/T 848 residential units blasting explosives depot Safety Evaluation Guide GA990 blasting units qualifications and management requirements GA991 blasting project management requirements

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 Blasting blasting Use dynamite explosive energy acting on the media, in order to achieve a predetermined goal of the project work.

3.2 Blasting unit blastingunit Permit holders blasting units engaged in blasting operations units, non-business and business sub-categories. Single non-commercial blasting operations Bit is lawful production activities need-based unit, within a defined region to implement their own units blasting operations; commercial blasting units It refers to an independent legal entity, to undertake the design and construction, safety assessment, safety supervision units blasting project.

3.3 Blasting engineering and technical personnel blastingengineeringandtechnicalpersonnel It refers to a blasting professional knowledge and practical experience and pass the examination to obtain a certificate of qualification in the blasting art.

3.4 Blasting operations personnel blastingpersonnel; personalsengagedinblastingoperations It means in blasting operations Blasting engineering and technical personnel, blasting staff, security staff and custodians.

3.5 Blasting harmful effects adverseeffectsofblasting Blasting area of the explosion near the protected object may have harmful effects. The vibration caused by blasting, individual scattering substances, air blast, Noise, water, shock, hydrodynamic pressure, swell, dust, harmful gases.

3.6 Blasting work environment blastingcircumstances Refers to the area in and around the blast blasting safety impact of natural conditions, environmental conditions.

3.7 Rock blasting rockblasting Use dynamite explosive energy of rock and soil media acting to achieve the desired goal of the project work.

3.8 Opencast Blasting surfaceblasting Carried out on the surface of rock blasting.

3.9 Underground blasting undergroundblasting Geotechnical underground (such as underground mines, underground chambers, tunnels, etc.) blasting operations.

3.10 Shallow hole blasting short-holeblasting Blasthole diameter less than or equal to 50mm, borehole depth of not more than 5m of blasting operations.

3.11 Deep hole blasting deep-holeblasting Blasthole diameter greater than 50mm, and the depth is greater than 5m blasting operations.

3.12 Blasting blastingincomplicatedsurroundings complex environment At the edge of implosion 100m range concentration area residents, the environment or the large farms of important facilities, the measures taken to control harmful effects Shi blasting implementation.

3.13 Blasting developmentblasting; headingblast Roadway, tunnel excavation engineering blasting.

4 Blasting rating

4.1 Blasting works by type of construction, a total dosage of blasting, blasting the environment and the complexity of the blasting material characteristics, points A, B, C, D four levels, Levels of management. Engineering grade are shown in Table 1. Table

1 Classification blasting Job classification standards of measurement range level ABCD Blasting rock blasting a first dose of Q/t 100<=Q 10<=Q < 100 0.5<=Q < 10 Q <

0.5 Blasting Demolition Height Hb/m Once BLASTING Qc/t 50<=H 0.5<=Q 30<=H < 50 0.2<=Q < 0.5 20<=H < 30 0.05<=Q <

0.2 H < 20 Q <

0.05 Special blasting d composite panels using a single dose of Q/t 0.4<=Q 0.2<=Q <

0.4 Q <

0.2 a form of traditional Chinese medicine refers to an amount corresponding to the level of open deep hole blasting. Other rock blasting appropriate dosage level corresponding factor. underground blasting 0.5; deep complex environment Blasting 0.25; open-air chamber blasting 5.0; underground chambers blasting 2.0;

0.1 Underwater Drilling and Blasting, Underwater Reef and dredging, blasting silt squeeze 0.2. b corresponding to the height of the table refers to the level of the building, plant and Water Tower Demolition blasting; blasting demolition of chimneys and cooling towers appropriate level corresponding to the height factor of

2 And 1.5. Press c demolition blasting blasting dose grading project categories include. bridges, support, foundation, floor, single structure; urban shallow hole blasting also press This standard grade; cofferdam demolition blasting appropriate level corresponding to the dose factor of 20. d Chapter 12 listed other special blasting are graded according to level D management.

4.2 B, C, D class ships rock blasting, the case of the following conditions should be a corresponding increase in the level of a project.

--- Within the blasting area 1000m from a range of national, cultural or two particularly important building (structure) building materials and facilities; There are three national cultural relics and scenic spots from within

--- blasting area 500m range, important building (structure) building materials and facilities;

--- From the provincial cultural relics, hospitals, schools, residential buildings, office buildings and other important protected object within the blasting area 300m range.

4.3 B, C, D and urban demolition blasting grade shallow hole blasting, in case the following conditions should be a corresponding increase in the level of a project.

5 The basic provisions of blasting operations 6

5.1 General provisions

5.1.1 Blasting design and construction, safety assessment and safety supervision should GA990 and GA991 execution.

5.1.2 Blasting design and construction, safety assessment and safety supervision should have the appropriate qualifications and practitioners range blasting unit commitment.

5.1.3 Blasting design and construction, safety assessment and safety supervision of the person in charge and key personnel should have the appropriate qualifications and job scope.

5.1.4 blasting unit design of this unit may not conduct a security assessment, the construction unit of the supervision shall blasting.

5.1.5 engaged in blasting design and construction, safety assessment and safety supervision blasting units, should be in accordance with relevant laws, regulations and standards The implementation of the provisions of blasting design and construction, safety assessment and safety supervision, and bear the corresponding legal responsibility.

5.2.1 Design Basis

5.2.1.1 blasting shall be designed to comply with the provisions of this standard and related industry standards, the provisions of local laws and regulations, according to the design of the power of attorney or contract Depth and content requires preparation.

5.2.1.2 design unit should need to make survey design task book. Survey mission statement shall include.

--- Shape blasting objects, including topographic maps blasting area, building (structure) design documents, drawings and field measurement, data review;

--- Structure and Properties of blasting objects, including explosive geological maps, building (structure) building materials reinforcement diagram;

--- Effect of blasting effect of blasting defects, including large-scale geological structure and building (structure) building materials damaged condition;

--- Blow deleterious effects affect distribution within the region protected material.

5.2.1.3 designer site reconnaissance survey after the formation of the report, the test project summary reports, summary reports of similar projects and current local Field test, the test report shall be used as the design basis. Construction Process

5.2.1.4 Blasting found topographical measurements and geological conditions, the structure was demolished size, material, etc. in good condition with the original Design based on inconsistent or environmental conditions have changed greatly, it is timely to modify the design or remedial measures.

5.2.1.5 Where the design documents did not pass the safety assessment should be required to re-evaluate the safety for the design; safety assessment require modification or increase in Contents should be required to modify the supplement.

5.2.2 Design Files

5.2.2.1 shall prepare blasting blasting technical design documents.

5.2.2.2 mines and other repetitive deep hole blasting blasting design allows standard technical design.

5.2.2.3 Blasting should be made after blasting effects based on blasting technology design evaluation, a complete engineering design files.

5.2.2.4 blasting technical design, technical design standards and design changes as a supplementary document shall be signed and complete catalog archive.

5.2.3 Technical Design Content

5.2.3.1 blasting technical design is divided into two portions of the specification and drawings, it should include the following.

--- Project overview that blasting the object, the quality of the environment overview and relevant drawings blasting, blasting, duration, safety requirements;

--- Blasting technology program, the program compares the program's drilling and blasting parameters and associated drawings selected;

--- Initiation and detonation network design network diagram;

--- Safe design and protection, warning FIG.

5.2.3.2 Qualified blasting design should meet the following conditions.

--- Design qualification units comply with the requirements; Qualifications and counting

--- commitment to design and safety assessment of major blasting engineering and technical personnel of compliance;

--- Design file or design review by the safety assessment that the blasting design is technically feasible, safety and reliability.

5.2.3.3 complex environments blasting technical design environment should be established to deal with complex methods, measures and contingency plans.

5.2.4 Construction Organization Design

5.2.4.1 Construction design prepared by the construction unit, is responsible for the preparation of engineering and technical personnel held by blasting job security certificate rank and job It should be consistent with the scope of the construction work.

5.2.4.2 blasting construction design should be based on technical design, tender documents, site survey construction unit owners attorney, answering tender Documents were prepared.

5.2.4.3 Blasting construction organization design should include the following.

--- Construction organization and responsibilities;

--- Construction preparation work and construction layout plan;

--- Construction people, materials, machines and security arrangements, schedule, quality assurance measures;

--- Blasting equipment management, safety and security;

--- Civilization construction, environmental protection, accident prevention measures and contingency plans.

5.2.4.4 design and construction by the same blasting units bear blasting, allowing construction design and blasting technical design merge.

5.3 Security Assessment

5.3.1 required before approval by the public security organs blasting project, submit an application security assessment should be carried out.

5.3.2 blasting safety assessment based on.

--- National, local and industry regulations and design standards; Security Assessment Security Assessment Unit

--- contract and signed by the requester;

--- Design documents and design and construction of the main units qualification material;

--- Safety assessors site survey collected data.

5.3.3 blasting safety assessment should include. Qualification

--- blasting units for compliance; Level

--- blasting projects for compliance;

--- Whether the design is based on complete information;

--- Design methods, design parameters are reasonable; Initiating Network

--- whether reliable;

--- Design alternatives is feasible;

--- Deleterious effects that may affect the scope and presence is comprehensive;

5.4 Safety Supervision

5.4.1 The public security authorities for approval of blasting projects, the implementation of blasting operations should be carried out safety supervision.

5.4.2 blasting safety supervision main elements.

--- Blasting unit is in accordance with the design and construction;

--- Whether the adverse effects of blasting control within the design range;

--- Factual qualifications blasting operations personnel to stop unqualified personnel engaged in blasting operations;

--- Civil Explosives receive supervision, the implementation of repaying the system;

--- Supervise the implementation of blasting operations to abide by the relevant national standards and norms, and found illegal command illegal operations, the right to stop Its blasting units and report to the public security organs entrusted.

5.4.3 blasting safety supervision unit supervision should be carefully prepared in the planning and implementation details to learn more about safety regulations, emergency plans later, and Supervisors develop job responsibilities.

5.4.4 blasting safety supervision personnel shall blasting equipment requisitioned, repaying, the blasting operations, security checks after the explosion and gun handling all aspects of the real blind Line construction site supervision, supervision and make records.

5.4.5 each blasting technical design shall be subject to supervisory agencies after the sign and acknowledge before their implementation. Organization and implementation of blasting work and supervision should sign and acknowledge Blasting technical design coincides.

5.4.6 one of the following occurs, supervisory agencies shall issue a moratorium blasting operations.

--- Blasting serious irregularities with time to stop invalid;

--- Construction of a major security risk occurs shall cease when blasting in order to eliminate hidden dangers.

5.4.7 blasting safety supervision unit shall submit regular reports to the Security Supervision requester to submit safety supervision and related summary at the end of the project Supervision of data.

6.1 Environmental blasting operations

6.1.1 before blasting to respond to natural conditions and environmental conditions around the area of the explosion the investigation, endanger the safety of the adverse environmental factors, and take Necessary safety precautions.

6.1.2 Blasting workplaces of the following circumstances, should not be blasting operations.

--- Face 20m from the wind flow within the gas content of 1% or gas outburst signs; --...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 59 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB 6722

EditionTitleRevisionStatus
GB 6722-2014Safety regulations for blastingcurrent editionCurrent
GB 6722-2003Safety Regulations for Blastingprevious editionSuperseded

This page sells the current edition, GB 6722-2014. Earlier editions are listed for reference only.

How to Buy GB 6722-2014

  1. 1Add to cart. Click the "Buy GB 6722-2014" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
59 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 6722-2014

$1,060.00

$900.00for partners